Rs.2270 Million New Ferro Alloy Plant in Lower Dibang Valley, Arunachal Pradesh
Executive Summary: A new ferro alloy plant is proposed at Denlo, Lower Dibang Valley district, Arunachal Pradesh. The project includes two 21 MVA furnaces to manufacture 42,000 TPA Ferro Silicon (Fe-Si). Estimated at Rs.2,270 million, construction is planned from January to December 2027. The proposal is currently awaiting environmental clearance from the State Level Environment Impact Assessment Authority.
Rs.2206 Million New Grain Based Distillery Project in Papum Pare, Arunachal Pradesh
Executive Summary: A new industrial venture in Papum Pare, Arunachal Pradesh, is establishing a 225 KLD grain-based distillery and a 7.5 MW captive power plant. With a revised investment of Rs. 2,206.9 million, the project is currently in the environmental clearance phase. Construction is scheduled from March 2027 to April 2028, aiming to produce high-quality Extra Neutral Alcohol.
Rs.141058 Million New Kalai II Hydro Electric Project in Anjaw, Arunachal Pradesh
Executive Summary: A 1200 MW hydroelectric project in Kamdi Village, Arunachal Pradesh, is planned, with construction set to run from July 2025 to January 2032, costing approximately Rs.128015.4 million. The project awaits environmental clearance, currently under examination by the Ministry of Environment, Forest, and Climate Change as of March 2024.
Rs.260695 Million New Kamala Hydroelectric Power Project in Arunachal Pradesh
Executive Summary: A large hydroelectric power project is planned on the Kamala River in Arunachal Pradesh, spanning multiple districts. The project will have an installed capacity of 1,720 MW, featuring a 216-metre-high concrete gravity dam and an underground powerhouse. The estimated investment is ₹260,695 million.
Rs.196 Million New Onshore Oil & Gas Drilling Project in Changlang, Arunachal Pradesh
Executive Summary: A new onshore exploration project is launching in Changlang, Arunachal Pradesh, to identify hydrocarbon reserves at the "KHAS" site. With a Rs 196.4 million investment, drilling and construction are scheduled from August 2026 to January 2027. Currently awaiting environmental clearance, the venture aims to strengthen domestic energy security by tapping into the region's untapped oil and gas potential.
Rs.6270 Million New Standalone Battery Energy Storage System in Anantapur, Andhra Pradesh
Executive Summary: A new standalone Battery Energy Storage System (BESS) is planned at the 400/220 kV Hindupur Substation in Anantapur, Andhra Pradesh. The project will have a capacity of 225 MW / 450 MWh, with an estimated cost of Rs.6,270 million. Construction is expected to be completed within 18 months from mid-2027, following the issuance of a Letter of Award by the state transmission authority.
Rs.2093 Million Electricity Transmission Expansion Project in Arunachal Pradesh
Executive Summary: A new Industrial Logistics Park is planned in Tirumangalam, Sriperumbudur, Kanchipuram, Tamil Nadu, with an estimated investment of ₹209.757 million. The project will provide modern facilities for industrial storage, distribution, and supply chain operations. Construction is scheduled from November 2025 to March 2026. As of October 2025, the proposal has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance.
Rs.19390 Million New Heo Hydro Electric Power Project in Shi Yomi, Arunachal Pradesh
Executive Summary: A 240 MW hydroelectric project is planned on the Yarjep River in Shi Yomi, Arunachal Pradesh, with an investment of Rs. 19,390 million. The facility includes a 16-meter barrage, a 3.55 km head race tunnel, and a surface powerhouse, expected to generate 1,000 MU annually. Construction is scheduled from November 2024 to December 2028, with foundation laid and partial 40 MW capacity underway as of September 2025.
New Medical College and Hospital in Arunachal Pradesh
Executive Summary: Arunachal Pradesh plans a 100-seat medical college and 100-bed hospital upgrade under NMC standards. The project will follow a public-private partnership model, enabling private partners to design, build, finance, equip, operate, and transfer the facilities. As of September 2025, the state’s medical education directorate has issued a bidding invitation for the project.
Rs.2270 Million New Ferro Alloy Plant in East Siang, Arunachal Pradesh
Executive Summary: A new ferro alloy plant is planned in the Industrial Growth Centre, Niglok-Ngorlung, East Siang, Arunachal Pradesh. The project includes setting up 2 x 21 MVA units with a production capacity of 38,000 TPA of Ferro Silicon. Estimated at Rs. 2,270 million, construction will begin in December 2025, pending environmental clearance.