Latest Project Updates
Rs.688 Million Vehicle Assembly Unit Expansion Project in Kanchipuram, Tamil Nadu
Executive Summary: A prominent automotive manufacturer is executing a Rs. 688.8 million assembly line expansion at its industrial facility in Oragadam, Kanchipuram, Tamil Nadu. The development adds 17,491 square meters of new operational space to an existing 4,55,470.55 square meter manufacturing footprint. Construction begins in July 2026, with state environmental clearance pending.
Rs.160 Million New Speed Wheel Sensor Mfg. Unit in Bangalore, Karnataka
Executive Summary: A new automotive component manufacturing unit is being developed in the Adinarayanahosahalli Industrial Area, Bengaluru, Karnataka. The project focuses on producing speed wheel sensors and represents a capital investment of Rs. 160 million. Following a land allotment proposal cleared by the SLSWCC, on-site construction and development work have officially commenced as of June 2026.
Rs.15000 Million New Railway Coach Mfg. Facility in Jajpur, Odisha
Executive Summary: An investment proposal has been approved for a Rs. 15,000 million state-of-the-art railway coach manufacturing facility in Jajpur, Odisha. The mega-industrial project officially secured approval from the state's High-Level Clearance Authority. The greenfield plant will focus on expanding manufacturing capacities for advanced rolling stock, components, and high-speed transit equipment.
Carrier Frame Assembly Expansion Project in Kanchipuram, Tamil Nadu
Executive Summary: An automotive component manufacturer is launching a Rs. 90 million industrial plant expansion in Kanchipuram, Tamil Nadu. The project scales up heavy fabrication capabilities to assemble car seat frames (300 T/M), wire frames, carrier frames, and battery power cases. Construction runs from September 2026 to September 2027, with state-level environmental clearance documentation currently undergoing formal review.
Rs.10520 Million Vehicles Dismantling Facility Expansion Project in Tirupati, Andhra Pradesh
Executive Summary: A prominent automotive manufacturer is expanding a major vehicle dismantling and recycling facility in Tirupati, Andhra Pradesh. Located at Survey Number 1, Madanapalem, the Rs. 10,520 million project will process 50 end-of-life vehicles daily. As of June 2026, the state pollution control authorities have granted official consent to establish, advancing the region's circular economy infrastructure.
Rs.2200 Million 2-wheeler Tyre Plant and Off-Highway Tyre Plant Expansion Project in Tamil Nadu
Executive Summary: A prominent tire manufacturer is implementing a Rs. 2,200 million brownfield expansion at its production complex in Madurai, Tamil Nadu. The strategy scales two-wheeler tire output by 5% and off-highway tire capacity by 25% to support growing global demands. Financed via internal accruals and debt, the project phases will roll out between mid-2027 and early 2028.
Rs.129 Million New Vehicles Mfg. Project in Krishna, Andhra Pradesh
Executive Summary: A new multi-category vehicle manufacturing facility is being established in Veerapanenigudem, Krishna District, Andhra Pradesh. Budgeted at Rs.129 million, the plant will produce up to 1,000 buses, 1,000 tippers/containers, 500 defense/armored vehicles, and 500 alternative fuel/EV models annually. The specialized automotive project secured its official state pollution control board consent to establish as of May 2026.
Rs.200 Million Industrial Shed / Building Construction Expansion Project in Tirupati, Andhra Pradesh
Executive Summary: An industrial shed and assembly building expansion project is planned at the APIIC Industrial Estate in Madanapalem, Tirupati District, Andhra Pradesh. Budgeted at Rs.200 million, the project scales up facilities to manufacture electric and conventional two-wheelers alongside an EV battery assembly unit. Construction runs from August to November 2026; the proposal awaits state environmental clearance as of May 2026.
Rs.2370 Million New Automotive Products Mfg. Project in Pune, Maharashtra
Executive Summary: A major automotive supplier is expanding its high-tech assembled parts facility in Khed, Pune. Producing 365,000 units monthly, the venture's investment capital scaled to Rs. 2,370 million as of May 2026, building upon regulatory approvals secured in early 2024. The project features advanced manufacturing setups to cater directly to regional vehicle assembly plants.
New Tractor & Auto Parts Mfg. Project in Solan, Himachal Pradesh
Executive Summary: An engineering firm is establishing a new tractor and auto parts manufacturing facility in Baddi, Solan district, Himachal Pradesh. Budgeted at Rs. 78.919 million, the plant is designed to achieve an annual production capacity of 530,000 components. As of May 2026, the project has advanced after receiving official consent to establish from the state pollution control board.