Latest Project Updates
Rs.305 Million New Onshore Development Well in Dr. B.R. Ambedkar Konaseema, Andhra Pradesh
Executive Summary: A new ₹305.2 million onshore development drilling well project (designated GMDW) is being established in Gopavaram Village, Konaseema district, Andhra Pradesh. Designed for a targeted extraction capacity of 40,698 MT/Annum of oil and natural gas resources, the energy asset advanced into active execution in July 2026 following formal Consent to Establish approvals from state pollution control authorities.
Rs.343 Million New LPG Cylinder Filling Unit in Balasore, Odisha
Executive Summary: A new LPG cylinder filling and bottling unit is planned for development at Mouza Barapada in the Balasore district of Odisha. Representing a total capital investment of Rs. 343.9 million, the upcoming energy facility will feature a monthly capacity of 7,200 cylinders. As of July 2026, the project has officially secured environmental clearance from state pollution control authorities to proceed.
Rs.37702 Million New Oil and Gas Production Project in Gujarat
Executive Summary: A major energy corporation is investing Rs 37,702.4 million to develop 656 onshore oil and gas wells across 52 blocks in Gujarat’s Kheda, Gandhinagar, Mehsana, and Ahmedabad districts. Aiming for a 3,810,000 MT capacity, the project is scheduled for execution between June 2026 and March 2029. Environmental clearance is currently being sought from state authorities.
Rs.556 Million New Onshore Development Well in Dr. B.R. Ambedkar Konaseema, Andhra Pradesh
Executive Summary: ONGC is launching a Rs. 556.4 million onshore drilling project at Madupalle, Ainavilli, Konaseema, Andhra Pradesh. The single development well—MDUDB (I-MDU-4)—is engineered to tap proven hydrocarbon reserves, targeting an output of 40,698 MT/Annum of oil and gas. The infrastructure has secured formal Consent to Establish from state pollution control authorities.
Rs.25000 Million New Sustainable Aviation Fuel Mfg. Project in Kakinada, Andhra Pradesh
Executive Summary: A massive green energy venture is setting up a Rs. 25,000 million Sustainable Aviation Fuel and biofuel manufacturing facility in Kakinada, Andhra Pradesh. The plant will produce 93,352 MTPA of clean fuels to support aviation decarbonization. Slated for construction between December 2026 and March 2029, the project is awaiting environmental clearance.
Rs.4955 Million New Group Gathering Station in Sivasagar, Assam
Executive Summary: A state-owned energy enterprise is building a Rs. 4,955.9 million hydrocarbon facility in Sivasagar, Assam. The installation integrates a 2,000 KLPD Oil Collecting Station, a 1,000 KLPD effluent treatment unit, and a 1,500 KLPD reservoir water injection system. Moving under a strict EPC route since October 2025, the project holds an active Notice to Proceed status.
Rs.46636 Million LPG Pipeline Laying Expansion Project in Gujarat
Executive Summary: An environmental clearance application has been submitted for an LPG pipeline expansion project in Gujarat. The Rs. 46,636.1 million initiative scales a 1,099.44 km trunk pipeline's capacity from 3.25 to 6.5 MMTPA. It includes laying 18.908 km and 6.508 km pipeline patches. Ground construction runs from January 2027 through December 2029.
Rs.540 Million New Drilling of Exploratory Well in South Tripura, Tripura
Executive Summary: A new exploratory well drilling project is planned for Sabroom, located within the Baramura Debtamura Reserved Forest in South Tripura, Tripura. Capitalized at Rs. 540 million, the operation centers on developing the forest-land based TMAH-Cluster. Construction is scheduled between October 2026 and December 2026. As of June 2026, the proposal undergoes statutory environmental clearance evaluation by state-level authorities.
Rs.3908 Million ONGC-BP Redevelopment Phase-1 in Mumbai, Maharashtra
Executive Summary: The ONGC-BP Redevelopment Phase-1 Project is underway at the offshore Mumbai High Field, Maharashtra. Backed by an estimated investment of Rs. 3,908 million, the scheme features two wellhead platform upgrades, 54 new wells, and a 6.2 km pipeline segment. Construction runs from November 2025 through March 2027. Under active EPC execution, the project has officially received its Notice to Proceed.
Rs.530 Million New Drilling of Exploratory Well in West Tripura, Tripura
Executive Summary: A major energy enterprise is launching an exploratory well drilling project at the ADAY-Cluster in Madhuban, West Tripura. Budgeted at Rs. 530 million, the intensive construction phase will run from October to December 2026. As of June 2026, the project awaits formal environmental clearance from the State Level Environment Impact Assessment Authority to commence local infrastructure development.