Latest Project Updates
Rs.1500 Million New ESI Hospital Construction Project in Guntur, Andhra Pradesh
Executive Summary: In Guntur, Andhra Pradesh, a new ESI Hospital project plans to build a 100-bed facility at a cost of Rs. 1500 million. Scheduled for construction from May 2025 to April 2026, the project is in the idea stage and is proceeding via the EPC route as of July 2024.
Rs.3842 Million New Hospital Construction Project in Visakhapatnam, Andhra Pradesh
Executive Summary: A new hospital project is underway in Sheelanagar, Visakhapatnam, Andhra Pradesh, featuring 350 beds and 50 super specialty beds. The project, costing Rs. 3842.7 million, began construction in April 2023 and aims to finish by October 2025. As of June 2024, it has received a Notice to Proceed and is progressing through the EPC route to enhance healthcare infrastructure in the area.
Rs.20000 Million Steel Plant Expansion Project in Andhra Pradesh
Executive Summary: In Mantralayam, Kurnool, Andhra Pradesh, a steel plant expansion project estimated at Rs. 20,000 million is underway as of June 2024. Pre-project activities are ongoing, focusing on increasing production capacity to meet rising steel demand across sectors.
Rs.1500 Million ESIC Hospital Construction Project in Nellore, Andhra Pradesh
Executive Summary: A 100-bed ESIC Hospital Construction Project in Nellore, Andhra Pradesh, with an estimated cost of Rs.1500 million, is scheduled for construction from May 2025 to October 2026. As of June 2024, the project is in the preliminary Idea Stage, undergoing planning and feasibility studies. It aims to enhance medical facilities and infrastructure, reflecting a commitment to improving healthcare access in the region.
Rs.1600 Million New ESI Hospital in Guntur, Andhra Pradesh
Executive Summary: A new 110-bed hospital is planned in Gunadala, Guntur, Andhra Pradesh, at an estimated cost of Rs. 1,600 million. Construction is set to begin in October 2024 and finish by September 2026. Currently in the idea stage, the project will be developed through the EPC route, aiming to enhance local healthcare infrastructure and services.
Rs.3000 Million Integrated Paint Expansion Facility in Sri Sathya sai, Andhra Pradesh
Executive Summary: A new construction project is planned in Hindupur, Andhra Pradesh for a British paint division. The project involves the establishment of the division with an estimated cost of Rs. 56.5 million. Consent from state pollution control authorities has been received. Expansion of the integrated paint facility with a capacity of 1355.56 KLD and an investment of Rs. 3000 million is also part of the project.
Rs.1600 Million Change of Product Mix Project in Tirupati, Andhra Pradesh
Executive Summary: A chemical manufacturing plant in Urandur, Srikalahasthi, Tirupati, Andhra Pradesh, plans a project to change its product mix, including producing Lamivudine (15 TPM) and Febuxostat (15 TPM) in phases. The project, estimated to cost Rs. 1600 million, has received consent from state pollution control authorities as of June 2024, allowing the establishment to proceed.
Rs.3000 Million Water Soluble Polymers Mfg. Expansion Project in Anakapalli, Andhra Pradesh
Executive Summary: A water-soluble polymers manufacturing plant in JNPC, Parawada, Anakapalli, Andhra Pradesh, plans to expand its capacity by 2000 TPD. The project, estimated to cost Rs. 3000 million, has received consent from the state pollution control authorities as of June 2024, allowing it to proceed with the expansion.
Rs.2659 Million New Domestic Terminal Building Construction Project in Andhra Pradesh
Executive Summary: A new Domestic Terminal Building project in YSR Kadapa, Andhra Pradesh, involves constructing a 16455 sqm terminal to handle 700 peak hour passengers. It includes a Multi Level Utility Building of 1500 sqm for essential services. The project, costing Rs. 2659.1 million, started construction in January 2024 and aims for completion by January 2026. As of June 2024, the project is progressing through the implementation phase, focusing on enhancing airport facilities in the region.
Rs.2500 Million New AC Mfg. Plant in Chittoor, Andhra Pradesh
Executive Summary: A new AC manufacturing plant will be established in Sri City, Andhra Pradesh with an annual capacity of 5.6 lakh units. The project's estimated cost is Rs. 2500 million. Consent from pollution control authorities has been obtained.