Latest Project Updates
New Synthetic Resin Mfg. Unit in Cooch Behar, West Bengal
Executive Summary: A new synthetic resin manufacturing project is planned in Nendarpar, Mathabhanga-I, Cooch Behar, West Bengal, with a production capacity of 3,300 TPA and an estimated investment of Rs. 46.5 million. Construction is scheduled from March to July 2026. As of October 2025, the proposal is under review by the State Environmental Impact Assessment Authority.
Rs.100 Million New Formaldehyde Mfg. Plant in Kamrup, Assam
Executive Summary: A new project is planned in Palasbari Industrial Estate-I, Kamrup, Assam, involving the establishment of a 50 TPD formaldehyde and 50 TPD resin manufacturing unit. The project, estimated at Rs.100 million, aims to enhance regional industrial capacity and has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance as of October 2025.
Rs.840000 Million New Coal-to-Chemical Plant in Sundargarh, Odisha
Executive Summary: A major new coal-to-chemical plant project is planned in Sundargarh, Odisha, with an estimated investment of Rs.840,000 million. The initiative aims to establish large-scale chemical production using coal as feedstock. As of October 2025, the project has received investment approval from the High-Level Clearance Authority (HLCA).
Rs.2790 Million Monoclonal Antibodies Mfg. Expansion Project in Medchal, Telangana
Executive Summary: A pharmaceutical manufacturer in Telangana is developing a new plant in Kolthur, Medchal-Malkajgiri, to produce items such as growth hormones, insulin glargine, and vaccines. Initially valued at Rs. 2,625.2 million, the project now includes an expansion of monoclonal antibody production (25 Kg/A to 435 Kg/A) with an additional Rs. 2,790.2 million investment. As of October 2025, it has obtained consent from state pollution control authorities.
Rs.128 Million Health Food Supplements Mfg. Expansion Project in Sirmour, Himachal Pradesh
Executive Summary: A nutraceutical company in Himachal Pradesh is expanding its Paonta Sahib facility to produce intermediates base powder (1,600 TPA), fat base powder (1,000 TPA), and sodium casein caseinate (920 TPA). Initially approved in March 2022 at Rs. 223.404 million, the project now adds health food supplements (4,000 TPA) and animal feed supplements (500 TPA) with an additional Rs. 128.2 million investment, approved by the State Review Committee as of October 2025.
Pharma Products Mfg. Expansion Project in Solan, Himachal Pradesh
Executive Summary: A company plans to expand its pharmaceutical manufacturing facility in Baddi, Himachal Pradesh, increasing capacities for capsules, liquids, tablets, and injectables. The project, with an estimated investment of Rs. 57.1 million, aims to boost production across multiple product lines. The State Review Committee approved the investment in September 2025, and project work has commenced as of October 2025.
Rs.5900 Million New Formulation Unit in Sangareddy, Telangana
Executive Summary: A new pharmaceutical formulation unit is planned in Sangareddy, Telangana, to produce tablets, capsules, syrups, and other formulations with large-scale annual capacities. The project, estimated at Rs. 5,900 million, aims to strengthen regional pharmaceutical manufacturing. As of October 2025, consent to establish the project has been granted by the state pollution control authorities.
New Ambrettolide Mfg. Unit in Hooghly, West Bengal
Executive Summary: A new ambrettolide manufacturing unit is planned in Dankuni, Hooghly, West Bengal, initially with a capacity of 24 TPA. As of October 2025, the project aims to expand production to 48 TPA with an investment of Rs. 84.5 million. Construction is scheduled from June 2026 to June 2027, and the project has been submitted for environmental clearance.
Rs.801 Million Chemical Fertilizer Plant Expansion Project in Dhule, Maharashtra
Executive Summary: A chemical company plans a major phosphatic fertilizer plant expansion in Maharashtra, increasing capacities for SSP, GSSP, H₂SO₄, phospho-gypsum, SSF, and power generation. The project includes a second H₂SO₄ plant, NPK/DAP fertilizers, and 100% phosphoric acid production, with a total investment of Rs. 801.5 million. Construction is scheduled May–December 2026, pending environmental clearance as of October 2025.
Rs.192 Million Consumer Product Mfg. Expansion Project in Parwanoo, Himachal Pradesh
Executive Summary: A consumer product manufacturing expansion project is planned in the Industrial Area, Khadeen, Parwanoo, Solan, Himachal Pradesh, to increase soap production capacity from 7,500 MT/Y to 11,500 MT/Y. The project involves an estimated investment of Rs. 124 million. As of July 2025, environmental clearance and consent to establish have been granted by the state pollution control authorities.