Latest Project Updates
Synthetic Organic Chemicals Mfg. Expansion Project in Bharuch, Gujarat
Executive Summary: A chemical manufacturer is executing a ₹55 million synthetic organic specialty chemicals expansion project at the GIDC Mega Industrial Estate in Jhagadia, Bharuch, Gujarat. The installation modifies an existing facility to introduce a new 3,600 TPA intermediate production line. Pending final state environmental clearances, on-site mechanical construction will span from December 2026 to November 2027.
Rs.5390 Million Formaldehyde Mfg. Unit Expansion Project in Anakapalli, Andhra Pradesh
Executive Summary: A chemical manufacturing unit expansion project in Anakapalli, Andhra Pradesh, costing Rs. 5,390.1 million, has received state pollution control clearance. The site will produce 200 TPD of Formaldehyde alongside industrial adhesive resins, featuring daily capacities of 150 tons for Urea Formaldehyde, 120 tons for Melamine Urea Formaldehyde, and 80 tons for Melamine Formaldehyde.
Rs.633 Million New Construction Chemical Powder Mfg. Project in Bhojpur, Bihar
Executive Summary: A new construction chemical powder manufacturing project costing Rs. 633.8 million is launching in Behea, Bhojpur, Bihar. Engineered for an industrial capacity of 168,000 MTPA, the facility focuses on specialized dry-mix adhesives and waterproofing powders. Having submitted its proposal in October 2025, the project has officially secured formal state investment board approval to begin active site development.
API and API Intermediate Mfg. Expansion Project in Palghar, Maharashtra
Executive Summary: An expansion project for manufacturing APIs and API Intermediates is planned at MIDC Tarapur, Palghar, Maharashtra. The development will scale production capacity from 888 to 4,128 TPA. Backed by an investment of Rs. 48 million, construction is scheduled from January to December 2027. The project currently awaits mandatory environmental clearance from the state authority.
Rs.330 Million New Synthetic Organic Chemicals Mfg. Project in Ahmadabad, Gujarat
Executive Summary: A new chemical manufacturing plant in Sanand, Gujarat, is being developed to produce 1,800 TPA of Synthetic Organic Chemicals. Backed by an investment of Rs. 330 million, construction will begin in October 2026 and conclude in October 2027. The project was submitted for environmental clearance in May 2026.
Rs.2500 Million New Inorganic Pigments Mfg. Project in Tiruchirappalli, Tamil Nadu
Executive Summary: A new ₹2,500 million greenfield manufacturing facility is planned for construction within the SIPCOT Industrial Park in Manapparai, Tiruchirappalli, Tamil Nadu. The project, which recently secured formal board approval, will establish an inorganic pigments production capacity of 2,500 MT. Implementation will execute across dual phases spanning fiscal years 2027–28 and 2028–29 utilizing internal funds and commercial loans.
Rs.174 Million New Pharmaceutical Products Mfg. Project in Darbhanga, Bihar
Executive Summary: A specialized pharmaceutical formulation company is setting up a Rs. 174.3 million manufacturing plant in the Donar Industrial Area, Darbhanga, Bihar. The greenfield unit features an annual capacity exceeding 69 million ampoules along with 62 million combined liquid and dry vials. Following initial investment proposal clearances from the SIPB Secretariat, the asset has received final board approval to start onsite civil deployment.
Rs.4623 Million New Chemical Mfg, Unit in Anakapalli, Andhra Pradesh
Executive Summary: A leading domestic pharmaceutical manufacturer is setting up a new Rs. 4,623.3 million chemical production facility within the APSEZ De-notified Area in Anakapalli, Andhra Pradesh. The plant will feature a production capacity of 447.22 MTPM for specialized bulk intermediates. Having secured formal state pollution control board clearances, the greenfield project is transitioning into active onsite civil construction.
New Bulk drugs and Intermediates Project in Yadgir, Karnataka
Executive Summary: A new Rs. 65 million greenfield bulk drugs and intermediates manufacturing plant with a capacity of 1,380 TPA is coming up in Badal, Yadgir, Karnataka. The project entered the regulatory pipeline in May 2026 upon submission to the SEIAA for mandatory environmental clearance. On-site construction is scheduled to run from August 2026 to January 2027.
Rs.200 Million Synthetic Resins Mfg. Expansion Project in Mahesana, Gujarat
Executive Summary: A major Rs. 200 million chemical plant expansion is planned in Mahesana, Gujarat, to boost synthetic resin manufacturing from 350 MT to 1,300 MT per month, alongside adding a new product line. Submitted to the SEIAA for mandatory environmental clearance as of May 2026, physical construction and equipment installation is scheduled to run from August 2026 to November 2026.