Latest Project Updates
New Telecommunication Equipments/Spares Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new manufacturing project in Raipur, Chhattisgarh, will produce telecommunication and transmission towers, railway equipment/spares, and iron and steel structures with a capacity of 40,000 MT per year. The facility will use modern fabrication and quality control technologies. As of November 2025, the project has received consent from the state pollution control authorities for establishment.
Chrome Metal Production Expansion Project in Durg, Chhattisgarh
Executive Summary: A company plans to expand its chrome metal production facility in the Industrial Estate, Bhilai, Durg, Chhattisgarh, increasing capacity to 10,000 metric tonnes per year. The ₹project includes advanced furnaces, pollution control systems, and modern infrastructure to boost efficiency and quality. As of November 2025, the project has received consent from state pollution authorities.
Rs.2650 Million New Sponge Iron, MS Billet Mfg. Facility in Bemetara, Chhattisgarh
Executive Summary: A company plans to develop a steel manufacturing facility in Boriya Village, Bemetara, Chhattisgarh, with capacities of 231,000 TPA sponge iron, 232,848 TPA billets, 225,863 TPA rerolled steel, and 34,600 TPA fly ash bricks. The ₹2,650.5 million project includes a 25 MW captive power plant and awaits SEIAA clearance, with construction from Dec 2025–Nov 2027.
New Bridges, Bridge Sections, Towers Mfg. Project.in Bemetara, Chhattisgarh
Executive Summary: A company plans to set up a new manufacturing project in Chhattisgarh for producing bridges, bridge sections, towers, and lattice masts made of iron or steel, with a capacity of 48,000 MT per year. As of November 2025, the proposal has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance.
Vegetables Oils and Fats Refined Project in Raigarh, Chhattisgarh
Executive Summary: A company in the oil extraction sector plans to expand its operations in Chhattisgarh with a new facility for processing vegetable oils and fats. The project includes refining 12,000 MT/year of crude vegetable oils and producing 48,000 MT/year of oil cake. Estimated at significant capacity, it has received state pollution control consent as of November 2025.
Rs.1100 Million Steel Plant Expansion Project in Raipur, Chhattisgarh
Executive Summary: A company is expanding its steel plant in Raipur, Chhattisgarh, increasing sponge iron capacity from 60,000 to 75,000 TPA, induction furnace from 50,000 to 260,900 TPA, and rolling mill from 50,000 to 264,000 TPA. The ₹1,100 million project adds a 0.4 MTPA pellet plant, a 22,000 bricks/day fly ash unit, and upgrades the WHRB power plant to 6 MW. Environmental and pollution control approvals have been secured, with construction set for June 2025 to August 2028.
Rs.420 Million Steel Plant Expansion Project in Raipur, Chhattisgarh
Executive Summary: An expansion project is planned in Raipur, Chhattisgarh, to enhance steel production capacities, including sponge iron, billets, TMT bars, ferro alloys, and captive power generation. The ₹420 million project aims to boost efficiency through hot charging and renewable fuel use. Construction is scheduled from November 2026 to November 2028, with environmental clearance under review by the national ministry.
Galvanized Octagonal Steel / Iron Poles /Pipes Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: An industrial expansion project is planned in Raipur, Chhattisgarh, to increase production of galvanized steel poles, transmission towers, and metal structures from 30,000 to 59,500 tonnes annually. It also adds facilities for aluminum and copper cables (46,000 tonnes) and LED lights and transformers (1,500 tonnes). The project obtained state pollution control consent in November 2025.
Brownfield Expansion Project in Rajnandgaon, Chhattisgarh
Executive Summary: A steel manufacturer plans a brownfield expansion in Rajnandgaon, Chhattisgarh, adding two 3.5 MVA furnaces to produce ferro alloys and pig iron while replacing existing cast iron output. The project, costing Rs.95.9 million, also involves switching the power plant fuel from biomass to coal and dolochar. Construction is scheduled from December 2025 to August 2026, pending environmental clearance.
New Railway Siding Project in Bilaspur, Chhattisgarh
Executive Summary: An energy and mineral company plans to develop a new railway siding facility in Ghutku, Bilaspur, Chhattisgarh. The project is designed to handle 28,800 metric tonnes per day. As of November 2025, it has obtained consent from the state pollution control authorities to establish the project.