Latest Project Updates
New PVC Pipe Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new PVC pipe manufacturing project is planned in Tendua, Dharsiwa, Raipur, Chhattisgarh, with an annual production capacity of 1,800 metric tons. The project aims to meet the growing demand for PVC pipes in various industries. As of April 2025, the necessary consent from state pollution control authorities has been obtained for its establishment.
New M.S. Ingots/Billets Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new manufacturing project is planned in Rawabhata, Raipur, Chhattisgarh, focusing on M.S. Ingots/Billets (59,400 tons/year), re-rolled products (56,430 tons/year), fabricated metal products (40,000 tons/year), and slag crushing (5,000 tons/year). As of April 2025, the project has received consent from state pollution control authorities for establishment, ensuring environmental compliance before operations begin.
New Lime Stone Mining Project in Sarangarh-Bilaigarh, Chhattisgarh
Executive Summary: A new limestone mining project is planned in Dhourabhata, Chhattisgarh, with an annual production capacity of 61,500 metric tonnes. The project has received approval from state pollution control authorities to proceed as of April 2025. It aims to support regional mining and industrial activities while supplying limestone for use in construction and manufacturing sectors.
Rs.488 Million MS Billet/ Ingots Expansion Project in Raipur, Chhattisgarh
Executive Summary: A company in Raipur, Chhattisgarh is planning to expand their MS billets/ingots production capacity. The project aims to manufacture 158,400 TPA of MS billets and 50,480 TPA of rerolled steel products with an estimated cost of Rs. 310.1 million. As of June 2018, the project is awaiting environment clearance.
New Coal Mining Project in Raigarh, Chhattisgarh
Executive Summary: A new coal mining project is planned in Rodopali, Mudgaon, Dholnara, Chitwahi, and Bhalumuda, Tehsil - Tamnar, Raigarh, Chhattisgarh. The project includes the Gare Palma Sector-II Coal Mine with a capacity of 23.60 MTPA (22.0 MTPA open-cast, 1.6 MTPA underground) over 30.243 hectares. As of March 2025, it has received state pollution control approval for establishment.
New Floating Structures Mfg. Project in Mahasamund, Chhattisgarh
Executive Summary: A new floating structures manufacturing project is planned in Industrial Area Birkoni, Mahasamund, Chhattisgarh, with a production capacity of 7,000 metric tonnes per year. The project aims to support renewable energy and water-based infrastructure. As of March 2025, it has received approval from the state pollution control authorities, enabling its establishment and future operations.
New MS Billets Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new MS Billets manufacturing project is planned in Industrial Area Siltara, Raipur, Chhattisgarh, involving the installation of a 12 MT Induction Furnace to produce 36,000 TPA. The expansion aims to enhance production capacity and industrial growth. As of March 2025, state pollution control authorities have granted approval for project establishment.
Steel Melting Shop Expansion Project in Durg, Chhattisgarh
Executive Summary: A steel manufacturing expansion project is planned in Rasmada, Industrial Growth Centre, Borai, Durg, Chhattisgarh, to increase steel melting capacity from 1,44,000 to 3,96,000 tonnes per year and rolling mill capacity from 1,20,000 to 4,50,000 tonnes per year. The FBC power plant will expand from 10 MW to 16 MW. As of March 2025, state pollution control authorities have approved the project
Rs.1150 Million Grain Based Distillery Expansion Project in Raipur, Chhattisgarh
Executive Summary: A grain-based distillery expansion project in Arang, Raipur, Chhattisgarh aims to increase production capacity from 360 KLPD to 430 KLPD, including ethanol, ENA/RS, and malt spirit plants, along with a bottling facility and an existing 12 MW cogeneration power plant. With an investment of Rs. 1,150 million, construction is planned from January to July 2026, pending environmental clearance.
Coal Washery Expansion Project in Raigarh, Chhattisgarh
Executive Summary: A coal washery expansion project in Raigarh, Chhattisgarh, aims to increase coal processing capacity from 0.96 MTPA to 5.2 MTPA. The project will enhance fuel efficiency and reduce impurities, supporting industrial growth. As of March 2025, it has received approval from state pollution control authorities, ensuring compliance with environmental regulations before commencing operations.