Coated Electrode of Base Metal Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A manufacturing expansion project in Bhanpuri, Raipur, Chhattisgarh, is underway, focusing on coated electrode production for arc welding. The project aims to produce 14,000 M.T./Year of coated electrodes, along with M.I.G./M.A.G. welding wire (3,700 M.T./Year) and EQMS wire & HB wire (2,700 M.T./Year). Consent for establishment has been obtained from state pollution control authorities as of April 2024.
Rs.130000 Million New Godhna Thermal Power Station in Janjgir - Champa, Chhattisgarh
Executive Summary: A new thermal power station is planned in Godhna, Janjgir - Champa, Chhattisgarh, by Karnataka Power Corporation. The project involves installing a pit head thermal power plant with a capacity of 2 x 800 MW, costing Rs.130,000 million. Construction is scheduled from March 2025 to September 2029. As of April 2024, environmental clearance is pending from the Ministry of Environment, Forest, and Climate Change of India.
New Plastic Pipes of PVC, CPVC and HDPE Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new project for manufacturing plastic pipes (PVC, CPVC, HDPE) and various plastic products like water tanks, road stoppers, furniture, and pots is planned in Arang, Raipur, Chhattisgarh. The project includes capacities of 15000 MTPA for pipes and 4500 MTPA for other products, with consent obtained from state pollution control authorities as of April 2024.
Rs.58900 Million Rawan Clinker Line - IV & Line-V Expansion Project in Balodabazar-Bhatapara, Chhattisgarh
Executive Summary: A Cement company plans to expand its Rawan plant, increasing Clinker Line - II capacity from 2.72 to 3.1 MTPA. The project, initiated in April 2015 and evolved by December 2023, targets boosting cement production to 6.5 MTPA and clinker to 8.1 MTPA. Additionally, the waste heat recovery-based power plant capacity will rise to 43 MW. The Rs.58900 million project awaits environmental clearance as of March 2024.
Ferro Alloy Expansion Plant in Raipur, Chhattisgarh
Executive Summary: A sponge iron production expansion plant is planned in Raipur, Chhattisgarh. The project includes the installation of a 1500 KW / 2100 Kg ferro melt induction furnace to process Si-Mn/Fe-Mn fines particles from the final product of SAF. Estimated at Rs.5.988 million, construction begins in December 2024, ending in November 2025. Environmental clearance is under examination by the Ministry of Environment, Forest, and Climate Change as of March 2024.
Rs.220 Million New Fly Ash Based FALG Aggregate Plant in Korba, Chhattisgarh
Executive Summary: A new Fly Ash Based FALG Aggregate Plant in Korba, Chhattisgarh, with a project cost of Rs. 220 million, is underway. It aims to utilize fly ash for sustainable construction materials. As of March 2024, the project has commenced with the laying of the Foundation Stone.
New Heavy Machinery for Fabrication Unit in Durg, Chhattisgarh
Executive Summary: A heavy machinery fabrication unit in Engineering Park, Hathkhoj, Bhila, Durg, Chhattisgarh. The project entails manufacturing heavy machinery for fabrication (3600 MTPA), casting machines (1200 MTPA), and link forging (1200 MTPA). Consent from state pollution control authorities has been secured as of March 2024.
New HDPE Pipes and Coils Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A project for manufacturing HDPE pipes and coils, including sprinkler irrigation systems, is slated for Urla Industrial Area, Chhattisgarh. With an annual capacity of 9000 M.T., the project has secured approval from state pollution control authorities as of March 2024.
New Lime Stone Mining Project in Sarangarh-Bilaigarh, Chhattisgarh
Executive Summary: A mining company plans to initiate a new limestone project in Timarlaga, Sarangarh-Bilaigarh, Chhattisgarh, with an annual capacity of 34926 MT. The project, valued at Rs. 49.206 million, has secured approval from state pollution control authorities as of March 2024.
New Ferro Alloys Production Expansion Unit in Raipur, Chhattisgarh
Executive Summary: A new ferro alloys production expansion unit is planned in Urla Industrial Area, Achholi, Raipur, Chhattisgarh, with a capacity of 30,000 MTPA. The project, estimated at Rs. 40 million, begins construction in November 2024, concluding by November 2025. As of March 2024, the project awaits environmental clearance from the Ministry of Environment, Forest and Climate Change of India.