Latest Project Updates
Rs.248 Million New Water Treatment Plant in Chamba, Himachal Pradesh
Executive Summary: A new 1.9 MLD water treatment plant is planned in Bathri, Dalhousie, Chamba, Himachal Pradesh, to provide safe drinking water and enhance local water infrastructure. The project is estimated to cost Rs. 248 million. As of September 2025, the project has received consent from the state pollution control authorities, allowing construction and implementation to proceed.
Rs.1098 Million Pharma Products Mfg. Expansion Project in Solan, Himachal Pradesh
Executive Summary: A pharmaceutical manufacturer is expanding its facility in Village Kunjhal, PO Barotiwala, Tehsil Baddi, Solan, Himachal Pradesh. The project includes scaling production of tablets, capsules, liquids, ointments, dental gels, creams, lotions, gels, cosmetics, and toothpaste. With phased investments exceeding Rs. 2,200 million, approvals from state authorities and pollution control consents have been secured to establish and operate the expansions.
Rs.166 Million New Aluminium Extrusion Expansion Project in Una, Himachal Prdaesh
Executive Summary: A new aluminium extrusion expansion project is planned at Industrial Area Basal, Una, Himachal Pradesh, with a proposed capacity of 2,000 MT per year. The project, costing Rs.166.052 million, aims to boost production of aluminium extrusions and profiles. As of September 2025, it has secured consent from the state pollution control authorities for establishment.
Rs.311 Million Chemical Mfg. Unit Expanson Project in Solan, Himachal Pradesh
Executive Summary: A chemical manufacturing unit in Baddi, Himachal Pradesh, is being expanded to produce AOS (70,000 t), SLS (120,000 t), SLES (75,000 t), CAPB (8,400 t), and other products. The project, estimated at Rs. 311.7 million, received State High-Level Clearance in June 2025, and construction work has started as of August 2025.
Rs.230 Million Resort Expansion Project in Parwanoo, Himachal Pradesh
Executive Summary: A resort expansion project is planned at VPO Darwa, Kishangarh, Kasauli, Solan, Parwanoo, Himachal Pradesh, involving the addition of nine double-bed rooms to the existing hotel facilities. The project is estimated to cost ₹230 million. As of August 2025, the proposal has received consent to establish from the State Pollution Control Authorities, enabling implementation.
Pharma Products Mfg. Expansion Project in Solan, Himachal Pradesh
Executive Summary: A pharmaceutical manufacturing expansion project is planned in Saurigujaran, PO Panjrhra, Nalagarh, Solan, Himachal Pradesh, with an investment of ₹45.6 million. The project adds new product lines including tablets (75 million/year), capsules (37.5 million/year), and ointments (7.4 million/year). Approved by the State High Level Clearance Committee in June 2025, the project work has commenced as of August 2025.
Rs.583 Million TMT Bars Angle Channels Mfg. Expansion Project in Himachal Pradesh
Executive Summary: An integrated melting and rolling facility in Baliana Village, Solan, Himachal Pradesh is being expanded. The project initially targeted 92,500 MT/year, later revised to 235,000 MT/year, with environmental clearance granted. As of August 2025, it focuses on producing TMT bars, angles, and channels (92,500 MT/year) with an updated investment of ₹583.7 million, approved by the State High Level Clearance Committee.
LPG Stoves Mfg. Project in Parwanoo, Himachal Pradesh
Executive Summary: A new manufacturing project is coming up in Parwanoo, Himachal Pradesh, involving the production of LPG stoves (60,000 units annually), steel utensils (120,000 units/year), and pressure cookers (120,000 units/year). With an estimated cost of Rs.48.4 million, the project has received consent from the state pollution control authorities to establish operations as of August 2025.
Rs.408 Million Plastic Products Mfg. Expansion Project in Una, Himachal Pradesh
Executive Summary: ChatGPT said: A plastic products manufacturing expansion project is planned in the Industrial Area, Village Jeetpur Behri, Una, Himachal Pradesh, increasing capacity from 5,000 tonnes to 9,080 tonnes per year. The project is estimated to cost Rs.408.1 million, approved by the State High-Level Clearance Committee in June 2025. As of August 2025, project work has commenced.
Rs.160 Million Adhesive Mfg. Expansion Project in Solan, Himachal Pradesh
Executive Summary: An adhesive manufacturing expansion project is planned in HPSIDC Industrial Area, Baddi, Himachal Pradesh, adding a new monomer-based adhesive with 600 tonnes/year capacity alongside existing products. Estimated at Rs.160.8 million, the investment was approved by the State High-Level Clearance Committee in June 2025. As of August 2025, project work has commenced.