Latest Project Updates
Rs.850 Million New Food Products Mfg. Project in Solan, Himachal Pradesh
Executive Summary: A new Food Products Manufacturing Project in Industrial Area Plasra, Nalagarh, Baddi, Solan, Himachal Pradesh, will produce various items like Maida, Atta, Frozen Foods, resort food, and canned food. Estimated at Rs.850.728 million, the project has received consent from state pollution control authorities as of April 2024, showcasing commitment to environmental compliance and diverse food production.
Rs.558 Million HDPE Closure Cap Mfg. Project in Solan, Himachal Pradesh
Executive Summary: A HDPE Closure Cap Manufacturing Project in Damowala, PO Barotiwala, Himachal Pradesh, will produce 302,400,000 caps annually, costing Rs.558.874 million. As of April 2024, the project has received approval from state pollution control authorities, emphasizing commitment to sustainable manufacturing practices.
Rs.675 Million New Cosmetics and Toiletries Mfg. Project in Solan, Himachal Pradesh
Executive Summary: A new Cosmetics and Toiletries Manufacturing Project in HPSIDC IA Baddi, Solan, Himachal Pradesh, will produce 15,000 metric tons annually, costing Rs.675 million. As of April 2024, the project has secured approval from state pollution control authorities, highlighting a commitment to sustainable production practices.
New Bulk Drug Mfg. Project in Una, Himachal Pradesh
Executive Summary: A new 59 API manufacturing venture in Himachal Pradesh's Tahliwal Industrial Area. With a capacity of 10 M.T./Year and an estimated cost of Rs.82.63 million, the project has secured approval from state pollution control authorities as of March 2024.
Rs.457 Million Watch Dials Mfg. Expansion Project in Solan, Himachal Pradesh
Executive Summary: A watch manufacturer plans expansion in Himachal Pradesh's Parwanoo, increasing watch dial production to 900,000 per year. Project costs estimate Rs. 457.9 million. State pollution control authorities have granted consent for the project as of March 2024.
Rs.386 Million Non Woven Fabrics Expansion Project in Sirmour, Himachal Pradesh
Executive Summary: A textiles unit in Himachal Pradesh plans to expand operations, boosting spunbond non-woven fabric production to 9800 Tonnes/Annum. New products include non-woven fabric bags, laminated printed BOPP bags, and printed BOPP woven sack bags. Project costs estimate Rs. 228.974 million. Further, non-woven disposable caps and waste bags manufacturing capacities have increased. The initiative aims to stimulate regional economy and employment. Total investment stands at Rs. 386.111 million.
Rs.211 Million New Probiotics and Enzymes Formulation Mfg. Unit in Sirmaur, Himachal Pradesh
Executive Summary: A new liquid injection/dry injection unit is planned in Himachal Pradesh's Sirmaur area. With a capacity of 60,000,000 units/year, the project's estimated cost is Rs.211.396 million. As of March 2024, the company has secured approval from state pollution control authorities for the project's establishment.
Rs.26145 Million New Sunni Dam Hydro Electric Project in Shimla, Himachal Pradesh
Executive Summary: A new hydroelectric project is planned near Khaira Village, Shimla, Himachal Pradesh by Satluj Jal Vidyut Nigam. The project aims to develop the Sunni Dam hydroelectric project with a capacity of 1381.77 MU, at an estimated cost of Rs. 26,145.1 million. The project is currently in the Notice to Proceed stage and is being executed through the EPC route.
Rs.1000 Million Floating Solar PV Power Project in Bilaspur, Himachal Pradesh.
Executive Summary: A company plans to develop a 15 MW grid-connected floating solar PV power project in Neilla, Bilaspur, Himachal Pradesh. The project aims to promote renewable energy infrastructure and is estimated to cost around Rs. 1000 million. The project has been awarded through an e-reverse auction held by the Solar Energy Corporation of India.
Rs.34000 Million Integrated Cement Plant Expansion Project in Bilaspur, Himachal Pradesh
Executive Summary: An expansion project in Himachal Pradesh aims to increase cement production capacities, including clinker and cement output, and implement Waste Heat Recovery Systems. Construction begins in February 2025, targeting completion by June 2026. Project cost is estimated at Rs. 34,000 million. Environmental clearance process with the Ministry of Environment, Forest, and Climate Change is ongoing as of February 2024.