Latest Project Updates
Rs.2000 Million New Industrial Shed Construction Project in Raisen, Madhya Pradesh
Executive Summary: A leading electrical component manufacturer is constructing a 49,246 sq. meter industrial shed in Raisen, Madhya Pradesh. The ₹2,000 million expansion aims to boost production capacity for high-tension insulators. Currently awaiting environmental clearance, the project is slated for construction between June 2026 and August 2028, marking a significant milestone for regional industrial development.
Rs.680 Million New Industrial Warehouse Shed Construction Project in Bharuch, Gujarat
Executive Summary: A major ₹680 million industrial warehousing project is coming up in Kaladara, Bharuch. The facility aims to bolster regional supply chain infrastructure and inventory efficiency for neighboring industrial hubs. Following its environmental clearance application in April 2026, construction is scheduled to span from August 2026 to July 2028, enhancing the logistics capabilities of the Gujarat industrial corridor.
Rs.1875 Million Industrial Shed Construction Project in Dhar, Madhya Pradesh
Executive Summary: A major textile and footwear manufacturing facility is being developed in Pithampur, Madhya Pradesh. The project involves constructing a 51,338 sq. meter industrial shed with a ₹1,875.2 million investment. Following environmental clearance filing in April 2026, construction is scheduled from June 2026 to June 2027, significantly expanding regional production capacity for garments and shoes.
Rs.9396 Million New Access Controlled Greenfield 4 Lane in Chitrakoot, Uttar Pradesh
Executive Summary: A ₹9,396.7 million greenfield expressway project is being developed in Chitrakoot, Uttar Pradesh. The 4-lane access-controlled highway is designed for future expansion to 6 lanes. Currently under environmental review as of April 2026, construction is slated to begin in October 2026 and conclude by March 2028, enhancing regional connectivity and industrial logistics.
Rs.2260 Million New Integrated Manufacturing & Logistic Cluster in Etawah, Uttar Pradesh
Executive Summary: A strategic industrial and logistics cluster is being developed in Etawah to stimulate regional economic expansion. The project involves building essential infrastructure, including roads, drainage, power, and water systems. With an investment of Rs. 2,260 million, the development is awaiting environmental clearance as of April 2026, with construction planned for completion between April 2027 and March 2028.
Rs.8000 Million New Viksit Bharat Mumbai Marina Development Project in Mumbai, Maharashtra
Executive Summary: A major maritime tourism project is being developed in Mumbai Harbour to host world-class yachting facilities and shore-side amenities, including a sailing school and hotel. Utilizing a hybrid public-private model with an investment of approximately Rs. 8.87 billion, the project aims to boost the blue economy. Pending environmental clearance as of April 2026, construction is scheduled through late 2029.
Rs.200 Million Water Aerodrome Development Project in Lakshadweep
Executive Summary: The UT administration is developing a Rs. 200 million water aerodrome at Kiltan Island to enable seaplane connectivity. Currently awaiting environmental clearance as of April 2026, the project features a one-year construction timeline from September 2026 to September 2027. This initiative will significantly boost local tourism and provide faster transit across the archipelago.
Rs.8322 Million New Outer Container Terminal Develeopment Project in Kolkata, West Bengal
Executive Summary: A Rs. 8,322.5 million project is transforming the Khidderpore Dock System in Kolkata through the development of an outer container terminal and the upgrade of five berths. Managed via a PPP model, construction is set for 2027–2028. Currently, the initiative is awaiting state environmental clearance to modernize regional maritime logistics and vessel handling capacity.
Rs.46097 Million New Road Construction Project in Kerala
Executive Summary: A major 40.4 km road infrastructure project is currently under implementation on NH-66 between Kasaragod and Kannur, Kerala. The ₹46,097 million project involves constructing a six-lane highway to enhance regional connectivity. Having commenced in October 2021, the development is currently in the construction phase and is expected to be fully operational by March 2027.
Rs.45788 Million New 4 Laning Project in Madhya Pradesh
Executive Summary: A major highway expansion is underway in Madhya Pradesh, converting the 80 km Badnawar–Timarwani stretch into a four-lane corridor. This ₹45,788 million project links NH-752D to the Delhi–Mumbai Expressway via the Hybrid Annuity Mode. Currently in the implementation stage as of April 2026, it aims to drastically reduce transit times and improve industrial logistics connectivity.