Latest Project Updates
Rs.100000 Million New Renewable Energy Equipment Mfg. Plant in Narmadapuram, Madhya Pradesh
Executive Summary: A major renewable-energy equipment plant is planned in the Mohasa–Babai Industrial Area, Madhya Pradesh, spanning 185 acres in Phase 2 with an estimated cost of ₹100,000 million. As of December 2025, the wider Phase 2 cluster has attracted ₹39,210 crore in investments, with this project as the largest contributor alongside several other large solar-manufacturing ventures.
Rs.71048 Million New Green Energy and Solar Equipment Mfg. Unit in Shajapur, Madhya Pradesh
Executive Summary: A company plans to establish a green energy and solar equipment manufacturing unit in Madhya Pradesh. The project, costing ₹71,048.9 million, had its foundation stone laid in November 2025 and is scheduled to be operational by July 2026. It aims to contribute to renewable energy production and local industrial development in the Ujjain-Shajapur Green Hub.
Rs.12660 Million New Multi Types of Cool Drinks Mfg. Project in Ujjain, Madhya Pradesh
Executive Summary: A major beverage company is investing Rs. 12,250 million in a 22-acre facility in Narwar, Ujjain, Madhya Pradesh, to produce multiple iconic drink concentrates. The project includes thousands of metric tons of various beverages, with construction starting in 2025 and operations expected by Q1 2026, aiming to enhance production capacity, quality, and innovation in India’s beverage sector.
Rs.620 Million New Insulin Syringes Mfg. Unit in Ujjain, Madhya Pradesh
Executive Summary: A medical device company plans a new manufacturing unit for blood collection systems and insulin syringes in the Medical Devices Park, Vikram Udyogpuri, Ujjain, Madhya Pradesh. The project, estimated at Rs.620 million, has commenced construction as of December 2025.
New Orthopaedic Implants Mfg. Unit in Ujjain, Madhya Pradesh
Executive Summary: A medical device company is setting up a new orthopaedic implants manufacturing unit in the Medical Devices Park, Vikram Udyogpuri, Ujjain, Madhya Pradesh. The project, with an estimated cost of Rs.50 million, has begun construction as of December 2025.
Rs.30000 Million New Greenfield Formulations Facility in Madhya Pradesh
Executive Summary: A company is planning a major greenfield formulations manufacturing facility in Madhya Pradesh, with an estimated investment of Rs. 30,000 million. The project aims to expand large-scale pharmaceutical production capacity. As of December 2025, the company’s board has formally approved the investment, enabling the project to proceed toward its development phase.
New Common Bio-Medical Waste Treatment Facility in Guna, Madhya Pradesh
Executive Summary: A new bio-medical waste treatment facility is planned in Mahu, Raghogarh, Guna, with an estimated cost of Rs.70 million. Construction is scheduled from July to October 2026. The project aims to establish a centralized treatment system for medical waste. As of November 2025, it has been submitted to the state environmental authority and is awaiting clearance.
New Hotel Construction Project in Bhopal, Madhya Pradesh
Executive Summary: A new hotel project is planned in Bhopal, Madhya Pradesh, featuring 50 well-appointed rooms along with a restaurant, banquet facility, meeting room, and conference hall. As of November 2025, the project is in the pre-construction activity stage.
Rs.3500 Million Grain Based Ethanol Plant Expansion Project in Neemuch, Madhya Pradesh
Executive Summary: A grain-based ethanol plant in Jhanjharwada, Neemuch, Madhya Pradesh is set for expansion, boosting ethanol capacity from 325 KLPD to 700 KLPD and power generation from 6.3 MW to 15 MW. Backed by a ₹2,400 million investment, construction is planned from June to December 2025, and the project is currently awaiting environmental clearance.
Rs.5700 Million Bina Refinery Township Expansion Project in Sagar, Madhya Pradesh
Executive Summary: A major refinery township in Madhya Pradesh is set for expansion across 112.99 hectares, increasing built-up area from 1,23,258 sq. m to 3,08,715 sq. m. The project, costing Rs. 5700 million, will run from November 2025 to November 2028. Environmental clearance has been submitted to the State Level Environment Impact Assessment Authority as of November 2025.