Latest Project Updates
Washer Windshield Tank and Motor Pump Assembly Project in Pune, Maharashtra
Executive Summary: A new manufacturing project is planned in Chakan Industrial Area, Pune, Maharashtra, to produce 1.5 lakh units annually of washer windshield tanks, motor pump assemblies, and washer fluid hose assemblies, along with 3 lakh insert water jackets. Estimated at ₹66.8 million, the project received consent from state pollution control authorities as of June 2025 for establishment.
Rs.3365 Million New Multi Modal Logistic Park in Nashik, Maharashtra
Executive Summary: A new Multi Modal Logistics Park is planned near Niphad Sugar Factory in Niphad Taluka, Nashik, Maharashtra. The ₹3,365.5 million project involves development, operation, and maintenance under the PPP model. Construction is scheduled from May 2025 to April 2027. As of June 2025, the project is in the tendering stage, aiming to enhance regional logistics infrastructure.
Rs.29405 Million New Ambegaon Pumpued Storage Project in Pune, Maharashtra
Executive Summary: A 600 MW off-stream, open-loop pumped storage project is planned in Kanase, Mahalunge Tarf Ghoda, Phulvade, Ambegaon, Pune, Maharashtra. With an estimated cost of Rs. 29,405.5 million, construction is scheduled to begin in April 2026 and conclude by March 2030. As of May 2025, the project awaits environmental clearance from the State Level Environment Impact Assessment Authority.
Rs.2800 Million New Painted & Non-Painted Plastic Molded Auto Exterior Components Mfg. Facility in Maharashtra
Executive Summary: A new manufacturing facility for painted and non-painted plastic molded auto exterior components is under development in Badhalawadi, Mawal, Pune, Maharashtra. The project, with an estimated investment of Rs. 2,800 million, began construction in November 2023 and is expected to be completed by December 2025. Environmental clearance is currently under review by the State Level Environment Impact Assessment Authority.
Rs.241 Million New Pharma Products Mfg. Project in Palghar, Maharashtra
Executive Summary: A new pharmaceutical manufacturing project is planned in Aliyali, Palghar, Maharashtra, involving the production of liquids (1.2 lakh litres/month), dry syrup (1.2 lakh litres/month), tablets (2 kg/month), and capsules (1.6 kg/month). With an estimated investment of ₹241.5 million, the project has received environmental clearance from state pollution control authorities as of May 2025 for establishment.
New Corrugated Boxes Mfg. Project in Palghar, Maharashtra
Executive Summary: A new corrugated box manufacturing project is planned in Sajjan Pada, Chahade, Palghar, Maharashtra, with a proposed production capacity of 1,000 tonnes per month. The project entails an estimated investment of ₹25.5 million. As of May 2025, the company has received consent from the state pollution control authorities, allowing it to proceed with establishing the facility.
New Injection Moulded Components Mfg. Project in Navi Mumbai, Maharashtra
Executive Summary: A new manufacturing project for injection moulded components with a capacity of 10 tons per month is planned in Navi Mumbai, Maharashtra. The project’s estimated investment is Rs.48.925 million. As of May 2025, consent from state pollution control authorities has been secured, allowing the project to proceed with establishment and development.
Rs.17850 Million New Malt Distillery Unit in Nagpur, Maharashtra
Executive Summary: A state-of-the-art malt distillery project is underway in Nagpur, Maharashtra, featuring a 70 KLPD malt distillery, malt spirit maturation plant, and 6 MW cogeneration power plant. With an investment of ₹17,850 million, the facility will produce 13 million liters annually. Approved by the state government, construction began in December 2024, showcasing a commitment to innovation and growth.
Rs.46790 Million Lube Modernization & Bottom Upgradation Project in Mumbai, Maharashtra
Executive Summary: A major lube modernization and bottom upgradation project is underway in Mumbai, Maharashtra, with an estimated cost of Rs. 46,790 million. Scheduled to run from December 2024 to March 2028, the project aims to enhance refining efficiency and output. As of May 2025, it has reached the "Notice to Proceed" stage and is being executed via the EPC route.
Rs.43730 Million New Gondia-Balharshah Railway line Project in Maharashtra
Executive Summary: A railway infrastructure enhancement project has been proposed in Maharashtra, entailing the doubling of a 240 km track between Gondia and Chanda Fort. The alignment, adjacent to the existing single line, spans multiple districts and requires 25.31 hectares of land. It includes significant civil works—one important bridge, 35 major bridges, and 338 minor bridges—with station upgrades planned throughout the corridor.