Latest Project Updates
New Pre Engineered Building Construction Project in Raipur, Chhattisgarh
Executive Summary: A new pre-engineered building construction project is planned in Sankara, Tilda, Raipur, Chhattisgarh, with a production capacity of 36,000 MT per year. The company has received consent from the state pollution control authorities as of October 2024. The project aims to enhance manufacturing capabilities, support local employment, and contribute to industrial growth in the region.
Rs.4971 Million Missiles Assembling Unit in Rangareddy, Telangana
Executive Summary: A new missiles assembling unit is planned in Mamidipally, Maheshwaram, Rangareddy, Telangana, with a capacity of 1,000 units annually and an estimated cost of Rs. 4,971 million. The project has received consent from the state pollution control authorities as of October 2024, moving forward toward construction.
Rs.147 Million New Lead Acid Battery Mfg. Unit in Hooghly, West Bengal
Executive Summary: A new lead-acid battery manufacturing unit is planned in Gopalpur, Majinan, P.S. Gurap, Hooghly, West Bengal, aimed at meeting rising demand in various sectors. The project will utilize modern manufacturing technologies to ensure efficiency and environmental compliance. As of October 2024, the company has obtained consent from state pollution control authorities to proceed with the establishment.
Rs.2500 Million New Cable Mfg. Unit in Sagar, Madhya Pradesh
Executive Summary: A new cable manufacturing unit is being set up in Sagar, Madhya Pradesh, with an estimated investment of Rs. 2500 million. The facility will focus on producing various cables for industrial and infrastructure applications. As of October 2024, the project has received an investment proposal from the state government, supporting the company's expansion plans.
Rs.1900 Million New Manufacturing Plant in Odisha
Executive Summary: A new manufacturing plant is planned in Odisha with an investment of Rs. 1,900 million, aimed at boosting production capabilities and supporting regional industrial growth. As of September 2024, the project has received investment approval from the State Level Single Window Clearance Authority (SLSWCA), paving the way for further development and job creation in the area.
Rs.510 Million New Electrical Equipment Mfg. Plant in Odisha
Executive Summary: A new electrical equipment manufacturing plant is planned in Odisha, with an estimated investment of Rs. 510 million. The project aims to meet rising demand for electrical products and boost local industry. As of September 2024, the project has received investment approval from the State Level Single Window Clearance Authority (SLSWCA), paving the way for development and job creation.
Rs.15500 Million New Battery Anode Material Mfg. Plant in Ballari, Karnataka
Executive Summary: A new battery anode material manufacturing plant is planned in Haraginadoni, Ballari, Karnataka, with a production capacity of 514,398 TPA and an estimated cost of Rs. 15,500 million. Construction is expected to begin in July 2025 and finish by July 2026. As of September 2024, the project is awaiting environmental clearance from the State Level Environment Impact Assessment Authority (SEIAA).
New Printed Circuit Boards Mfg. Unit in Khurdha, Odisha
Executive Summary: A new Printed Circuit Boards manufacturing unit is set to be established in Khurdha, Odisha. The project has received approval from the High-Level Clearance Authority (HLCA) as of September 2024, paving the way for the development of this manufacturing facility.
Rs.2425 Million New HVAC Products Mfg. Facility in Alwar, Rajasthan
Executive Summary: A new HVAC products manufacturing facility is set to be established in the RIICO Industrial Area of Neemrana, Alwar, Rajasthan, with an estimated cost of Rs. 2,425 million. As of September 2024, the project has received consent from state pollution control authorities, ensuring compliance with environmental regulations and contributing to local economic growth and job creation.
Rs.12000 Million New Aircraft Part Mfg. Facility in Ahmednagar, Maharashtra
Executive Summary: A new Aircraft Part Manufacturing Facility is planned in MIDC Shirdi, Rahata, Ahmednagar, Maharashtra, focusing on key components like stabilizers, wings, jet engines, and fuselages. With an estimated investment of ₹12,000 million, the project aims to boost India’s aerospace manufacturing capabilities. As of September 2024, pre-project activities are underway to ensure a successful launch.