New & Upcoming Projects In India

A complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India.

Latest Project Updates

Featured Manufacturing

New Electrical Equipment Mfg. Unit in Khordha, Odisha

State: Odisha
Investment: NA
Updated: 30 March 2026

Executive Summary: An electrical equipment manufacturing unit in Khordha, Odisha, secured SLSWCA investment approval as of March 2026. This facility focuses on producing high-demand components to strengthen India’s power sector and infrastructure value chains. Strategically located to serve Eastern India, the project will drive technological localization, industrial growth, and employment while supporting the region’s expanding energy distribution network.

Featured Manufacturing

Rs.140 Million New PET Flakes Mfg. Project in Hooghly; West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 30 March 2026

Executive Summary: A new integrated plastic recycling project in Hooghly, West Bengal, received Consent to Establish in March 2026. With a Rs. 140 million investment, the facility will produce 841 Metric Tonnes monthly of PET flakes and recycled PP/HDPE granules. This strategic unit bolsters the regional circular economy, providing high-quality sustainable raw materials for the packaging and textile sectors.

Featured Manufacturing

Rs.700 Million Machined Bearing Rings Mfg. Project in Tirupati, Andhra Pradesh

State: Andhra Pradesh
Investment: From 100 Million to 999 Million
Updated: 30 March 2026

Executive Summary: A new Machined Bearing Rings manufacturing project in Sri City, Andhra Pradesh, received Consent to Establish in March 2026. With a Rs. 700 million investment, the facility will produce 15,000 units monthly. Strategically located in the Domestic Tariff Zone, the unit will utilize advanced CNC machining to serve automotive and industrial sectors, boosting regional high-end manufacturing.

Featured Manufacturing

Explosives Mfg. Expansion Project in Yadadri Bhuvanagiri, Telangana

State: Telangana
Investment: Less than 100 Million
Updated: 30 March 2026

Executive Summary: An explosives manufacturing expansion in Yadadri Bhuvanagiri, Telangana, received Consent to Establish in March 2026. With a Rs. 93.8 million investment, the facility will scale production of high-energy materials like CL-20, shock tubes, and defense detonators. This strategic project strengthens India’s aerospace and defense supply chains, supporting critical missile systems and national security programs.

Featured Manufacturing

Rs.850 Million Lead Acis Battery Mfg. Expansion Project in Mahbubnagar, Telangana

State: Telangana
Investment: From 100 Million to 999 Million
Updated: 30 March 2026

Executive Summary: An electrical products manufacturer in Mahbubnagar, Telangana, is expanding its battery production capacity as of March 2026. With an increased investment of Rs. 850 million, the facility will now produce 3,500 lead-acid units daily and add a 1,000-unit lithium battery assembly line. This strategic move targets the growing electric vehicle and premium power backup sectors.

Featured Manufacturing

Rs.1640 Million New Agricultural Equipment Mfg. Unit in Khordha, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 27 March 2026

Executive Summary: A new agricultural equipment manufacturing unit in Khordha, Odisha, is set for development with a Rs. 1,640 million investment. As of March 2026, the project has secured investment approval from the State Level Single Window Clearance Authority. This facility will produce modern farming machinery, aimed at boosting regional agricultural productivity and creating specialized industrial employment.

Featured Manufacturing

Rs.2802 Million Semiconductor Packaging and Mfg. Unit in Khordha, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 25 March 2026

Executive Summary: A ₹280.25 crore advanced semiconductor packaging unit is planned for Jatni, Odisha, spanning 25 acres. The facility focuses on next-generation glass substrate-based manufacturing, a critical technology for high-performance computing. As of March 2026, the project is awaiting environmental clearance from SEIAA, with a fast-tracked construction timeline scheduled from October 2026 to July 2027.

Featured Manufacturing

Rs.5500 Million Medical Devices Manufacturing Unit Expansion Project in Tamil Nadu

State: Tamil Nadu
Investment: From 5000 Million to 49999 Million
Updated: 24 March 2026

Executive Summary: The project involves development of an advanced medical devices manufacturing facility over 4.45 acres at SIPCOT Medical Devices Park in Oragadam with an investment of Rs 5500 million. It will cater to growing demand as the existing plant is operating at full capacity and will manufacture high-precision medical devices. The project is supported by state facilitation and is expected to generate employment for around 100 engineers. Land has been secured on a long-term lease and development is expected to proceed in phases.

Featured Manufacturing

New Specialised Medical Facility in Khordha, Odisha

State: Odisha
Investment: NA
Updated: 24 March 2026

Executive Summary: A new specialized medical facility is planned for Khordha, Odisha, focusing on advanced diagnostic and healthcare services. As of March 2026, the project has achieved a major milestone by receiving formal investment approval from the State Level Single Window Clearance Authority (SLSWCA), paving the way for further development and improved medical accessibility in the region.

Featured Manufacturing

Rs.765 Million Electrical & Electronics Item Mfg. Project in Gautam Buddha Nagar, Uttar Pradesh

State: Uttar Pradesh
Investment: From 100 Million to 999 Million
Updated: 23 March 2026

Executive Summary: A power controls specialist is investing Rs. 765 million to establish a 32,338.5 sq. meter electrical and electronics manufacturing hub in Greater Noida’s Yamuna Expressway. Currently seeking environmental clearance, the project aims to scale production of high-precision equipment. Construction is scheduled to span three years, beginning in September 2026 and concluding by September 2029.