Rs.105000 Million New Solar Wafer and Module Mfg. Unit in Nagpur, Maharashtra
Executive Summary: A renewable energy company plans a new solar wafer and module manufacturing unit in Butibori, Nagpur, Maharashtra, with an estimated cost of ₹105,000 million. As of August 2025, the company has signed a memorandum of understanding with the state government.
Rs.17200 Million New Non Leather Footwear Mfg. Unit in Tamil Nadu
Executive Summary: A non-leather footwear manufacturing unit is planned in Tuticorin, Tamil Nadu, with an estimated investment of Rs. 17,200 million. As of August 2025, a memorandum of understanding has been signed with the state government to advance the project.
Rs.220 Million New Precision Components Mfg. Unit in Bangalore, Karnataka
Executive Summary: A new precision components manufacturing unit is planned in Devanahalli, Karnataka, focusing on CNC-based production and assembly for aerospace and defense parts. The project is estimated at Rs. 220 million. Approved by the State High-Level Clearance Committee in June 2025, construction work has commenced as of August 2025.
Rs.517 Million New Electronics Systems and its Parts Mfg. Project in Bengaluru, Karnataka
Executive Summary: A new electronics systems and parts manufacturing project is coming up at Hi-Tech Defence and Aerospace Park Phase-II, Bengaluru, Karnataka, with an investment of ₹517 million. The facility will cater to aerospace and defence applications. The proposal was approved by the State High Level Clearance Committee in June 2025, and by August 2025, project work had commenced.
Rs.6770 Million Pre Laminated Fiber Board Mfg. Project in Bhind, Madhya Pradesh
Executive Summary: A new manufacturing project is planned in Malanpur Industrial Area, Bhind, Madhya Pradesh, for producing MDF, HDF, pre-laminated fiberboards, and laminated wooden flooring with 150,000 cubic meters annual capacity. Estimated at Rs.6,716 million, it received pollution control consent in November 2024. By August 2025, expansion includes a 150 TPD resin plant worth Rs.6,770 million, with construction scheduled from December 2025 to November 2026, pending environmental clearance.
New Plastic Processing Plant in Ujjain, Madhya Pradesh
Executive Summary: A new plastic processing plant with a Common Biomedical Waste Treatment Facility is planned in Kaliyadeh, Ujjain, Madhya Pradesh. Equipped with a 300 kg/hour incinerator, it will handle 2,400 TPA of waste. The project, costing Rs.56.15 million, has received state pollution control consent as of August 2025, enabling its establishment and implementation.
Rs.230 Million Lamination Unit Expansion Unit in Rangareddy, Telangana
Executive Summary: A lamination unit in Elikatta, Farooqnagar, Telangana, is set for expansion, adding new products—High Pressure Decorative Laminates and Compact Laminates (5,000 units/day)—while continuing existing production of Paper Based Laminated Sheets (10,000 units/day) and Electrical Insulation Sheets (1,500 units/day). The project, costing Rs.230 million, has received state pollution control approval as of August 2025.
Rs.648 Million New Faster Mfg. Unit in Jhargram, West Bengal
Executive Summary: A new manufacturing unit is planned in Gobindapur, Jhargram, West Bengal, to produce screws, nuts, bolts, anchor bolts, and studs in various sizes and materials, with a capacity of 1,500 metric tonnes per month. The project, estimated at Rs.648 million, has received consent from state pollution control authorities as of August 2025, ensuring regulatory compliance.
New Electrical Panel Board Mfg. Unit in East Godavari, Andhra Pradesh
Executive Summary: A new Electrical Panel Board manufacturing unit is planned in Pidimgoyyi Village, Rajamahendravaram Rural, East Godavari, Andhra Pradesh. The project, with an estimated investment of Rs. 26.5 million, has received approval from the state pollution control authorities as of August 2025. It aims to support industrial growth and generate local employment opportunities.
Printing Inks Mfg. Expansion Project in Mahaboobnagar, Telangana
Executive Summary: A printing inks manufacturing expansion project is planned in Burgul, Farooqnagar, Mahaboobnagar, Telangana, increasing capacity from 6.57 TPD to 7.39 TPD. The project is estimated to cost Rs.62.775 million. As of August 2025, it has received consent from the state pollution control authorities, ensuring compliance with environmental regulations before establishment.