Rs.461 Million New Electrical and Electronics Products Mfg. Unit in Uttar Pradesh
Executive Summary: A new electrical and electronics products manufacturing facility is planned for the YEIDA region in Uttar Pradesh. The project establishes mass production lines for consumer home appliances and equipment backed by an investment of Rs. 461.7 million. The development has secured its official land allotment letter from the state government to proceed with immediate phase-one site planning.
Rs.371 Million New Electronic Products Mfg. Unit in Uttar Pradesh
Executive Summary: A new consumer electronics manufacturing facility is slated for development in the YEIDA region of Uttar Pradesh. The greenfield unit is designed to streamline modern assembly and electronics hardware production lines. Financed through an estimated capital allocation of Rs. 371.9 million, the infrastructure project has officially received its formal land allotment letter from the state government to initiate on-site mobilization.
Rs.590 Million Kraft Paper Mfg. Expansion Project in Krishna, Andhra Pradesh
Executive Summary: A kraft paper manufacturing facility in Bapulapadu, Krishna district, Andhra Pradesh, is expanding its production capacity from 200 TPD to 380 TPD. The expansion project involves a fresh capital injection of Rs. 590 million, building on the initial Rs. 376.6 million investment. The state pollution control authorities have granted official consent to establish the expanded setup.
Recycle Polyster Chips Processing Expansion Project in Solan, Himachal Pradesh
Executive Summary: A textile manufacturing facility is expanding its recycling plant in Baddi, Solan, Himachal Pradesh. The Rs. 75.726 million brownfield project adds an annual capacity of 2,400 MT of recycled polyester chips and 24,000 MT of washing flakes. The state pollution control board granted official consent to establish in June 2026, moving the project into immediate execution.
Rs.513096 Million Semiconductor Wafer Fabrication Expansion Project in Ahmadabad, Gujarat
Executive Summary: A major semiconductor wafer fabrication expansion project is underway in Dholera, Ahmedabad, Gujarat. The massive ₹5,13,096 million project will expand an integrated circuit manufacturing facility’s output from 32,000 to 70,000 wafers monthly, increasing its total built-up footprint to over 4,77,000 square meters. Environmental clearance processing began in June 2026, with construction phased until February 2032.
Rs.4846 Million New Machine Tools Mfg. Unit in Pune, Maharashtra
Executive Summary: A new Rs. 4,846.3 million industrial facility is coming up at the Ranjangaon MIDC Area in Pune, Maharashtra. The development entails constructing a massive machine tools manufacturing unit featuring a total built-up area of 61,585.10 square meters. Environmental clearance was sought in June 2026, and civil construction is slated to run from August 2026 through September 2027.
Rs.660 Million New Electronic Products Mfg. Unit in Uttar Pradesh
Executive Summary: A new Rs. 660 million manufacturing facility dedicated to heavy electrical infrastructure and clean-tech components is being developed in Uttar Pradesh's YEIDA zone. The plant will produce power transformers, switchgears, and EV charging units. As of June 2026, the project has transitioned into active design planning following official state land allotment clearances.
Rs.910 Million New Domestic Appliances, Personal Care Mfg. Unit in Uttar Pradesh
Executive Summary: A new domestic appliances, electrical products, and personal care manufacturing facility is being established in Uttar Pradesh's YEIDA zone. Backed by an investment of Rs. 910 million, the project reached a major milestone in mid-2026 after receiving its official land allotment from the state government. Basic engineering design layouts and structural clearances are currently being compiled.
Rs.279300 Million New Glass Core Substrate Mfg. Facility in Odisha
Executive Summary: An advanced $3.3 billion semiconductor packaging glass-core substrate manufacturing facility is coming to the Bhubaneswar–Khurda region, Odisha. Formally initiated via a state government MoU in May 2026, the project will be built in phases over five to six years. It will create over 1,800 high-skilled jobs and establish a localized tech supply chain.
Rs.25420 Million New Electrolyser Manufacturing Gigafactory in Vadodara, Gujarat
Executive Summary: A massive Rs. 25,420 million greenfield Electrolyser Manufacturing Gigafactory is planned over 129,279 m² at GIDC PCC Area, Vadodara, Gujarat. Designed to build core green hydrogen infrastructure, the project was submitted for SEIAA environmental clearance in June 2026. Fast-track construction is scheduled to span from July 2026 to June 2027.