Latest Project Updates
Rs.2850 Million New PVC Pipes Mfg. Project in Kathua, Jammu and Kashmir
Executive Summary: A new manufacturing facility for PVC, CPVC, and DWC pipes is planned in Chak Gadhadar, Kathua, Jammu and Kashmir. The project, with an annual production capacity of 30,000 MT of PVC pipes and 10,000 MT of CPVC and DWC pipes, is estimated to cost ₹2,850 million. As of November 2024, environmental consent has been granted.
Rs.761 Million New Corrugated Box Mfg. Project in Kathua, Jammu and Kashmir
Executive Summary: A new corrugated box manufacturing project is planned in Forelain, Kathua, Jammu and Kashmir, with an annual production capacity of 54,750 MT for mono and other cartons. The ₹761 million project has received consent from state pollution control authorities as of November 2024, paving the way for the establishment of the facility to meet growing packaging demands.
Rs.220 Million Customized Passive Fiber Optics Products Mfg. Project in Belagavi, Karnataka
Executive Summary: A new project for manufacturing customized passive fiber optics products is underway in Kanagala Industrial Area, Belagavi, Karnataka, with an investment of ₹220 million. Approved by the State Level Single Window Clearance Committee in August 2024, the project commenced in November 2024, aiming to enhance the supply of advanced optical components for various industries.
Grinding Media Balls Mfg. Unit Expansion Project in Durg, Chhattisgarh
Executive Summary: A grinding media balls manufacturing unit expansion is planned in Engineering Park, Hathkhoj, Bhilai, Chhattisgarh, increasing capacity from 20,000 to 52,800 tonnes annually by adding advanced quad-track furnaces. As of November 2024, the ₹227.561 million project has received state pollution control approval, enabling its establishment to meet rising industrial demand.
Fully automatic Machine Installation Project in Kolkata, West Bengal
Executive Summary: A fully automatic machine installation project is planned in Sarsuna, Kolkata, West Bengal, involving advanced equipment like compressing machines, cap sealing machines, labeling machines, a DM water plant, air-conditioning systems, and CCTV cameras. Estimated at ₹77.991 million, the project has received state pollution control consent as of November 2024, enabling its establishment.
Rs.227 Million Plastic Flakes / Granules Reprocessing Project in 24 Pgs (N), West Bengal
Executive Summary: A plastic flakes and granules reprocessing project is planned in Bagband Saiberia, Madhyamgram, 24 Parganas (North), West Bengal. The ₹227.561 million initiative focuses on sustainable recycling and resource optimization. As of November 2024, the project has received approval from state pollution control authorities, enabling its establishment and promoting eco-friendly practices in the plastics industry.
Rs.4800 Million New Refrigerator Mfg. Unit in Rajasthan
Executive Summary: A new refrigerator manufacturing unit is planned in Ghiloth, Rajasthan, with a production capacity of 14 lakh units annually. Estimated at ₹4,800 million, the project aims to meet growing consumer demand and boost local economy. As of November 2024, it has received consent from state pollution control authorities, allowing the establishment to move forward.
Rs.264 Million New Polycarbonate/PMMA Solid Sheet Mfg. Project in Jammu and Kashmir
Executive Summary: A new manufacturing facility for polycarbonate and PMMA solid sheets is planned in Forelain, Kathua, Jammu and Kashmir, with an annual capacity of 4,800 MT. The project will produce various plastic sheets, including solid, corrugated, and decorative types. Estimated at Rs. 264 million, the project has received consent from the state pollution control authorities as of November 2024.
Pet Preform Mfg. Project in Paschim Bardhaman, West Bengal
Executive Summary: A PET preform manufacturing unit is planned in Durgapur, Paschim Bardhaman, West Bengal, with a capacity of 103 MT per month. The estimated cost of the project is ₹38.17 million. As of November 2024, the company has received consent from the state pollution control authorities, allowing the project to proceed with its establishment.
Rs.160 Million Machine Tools and Components Mfg. Project in Karnataka
Executive Summary: A new machine tools and components manufacturing project is planned in Banashankari 6th Stage, Tumakuru, Bengaluru, Karnataka, with an estimated investment of ₹160 million. The facility aims to meet growing demand in the engineering sector. As of November 2024, the project has received consent from the state pollution control authorities to proceed with establishment.