New Joining, Fixing Rails Materials Mfg. Project in Durg, Chhattisgarh
Executive Summary: A new railway infrastructure component manufacturing facility is slated for development at Plot No.- 12, Rail Park, Hathkhoj, Durg, Chhattisgarh. The site will manufacture specialized track elements including 2,400 glued insulated rail joints and 1,200 switch expansion joints annually. The engineering project advanced into its setup phase in June 2026 after securing state pollution control authority consent.
Rolling Mill Expansion Project in Raigarh, Chhattisgarh
Executive Summary: A metallurgical expansion project in Taraimal, Raigarh, Chhattisgarh, is scaling total rolling mill capacities to 1,15,700 TPA. The development integrates hot-charged mill expansions, a new reheating furnace mill with a 4,800 Nm3/hr coal gasifier, and a 4 MW waste heat recovery power plant. The heavy industry infrastructure secured state pollution control authority consent in June 2026.
Rs.627 Million New Manganese Beneficiation Unit in Keonjhar, Odisha
Executive Summary: An iron powder manufacturing project is underway in Keonjhar, Odisha, featuring a 7,200 TPA capacity. It includes a 19,000 TPA Manganese Beneficiation Unit across 1.65 acres, backed by a ₹627 million investment. With pollution control consent secured and environmental clearance pending, construction is slated to run from September 2026 to August 2027 to boost the steel supply chain.
Rs.5500 Million Coal Washery Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: An industrial facility in Durgapur, West Bengal, is planning a Rs. 5,500 million expansion to scale its coal washery, DRI, induction furnace, SAF, rolling mill, and power plant capacities. Incorporating new steel-refining infrastructure, a briquette unit, and a metal recovery plant, construction is slated from October 2027 to October 2029 following environmental clearance.
New Medium and Heavy Steel Components Mfg. Project in Cuttack, Odisha
Executive Summary: A Construction Company is establishing a 3,000 MT/Annum structural fabrication facility in Kulailo, Athagarh, Cuttack, Odisha. The specialized greenfield asset is engineered to manufacture medium and heavy steel components tailored for the power and heavy civil infrastructure markets. The project has formally received its institutional Consent to Establish from state pollution control authorities.
Rs.8000 Million Integrated Mini Steel Plant Expansion Project in Satara, Maharshtra
Executive Summary: A prominent metallurgical company is executing an Rs. 8,000 million mini steel plant expansion and modernization in Satara, Maharashtra. The infrastructure initiative scales production to 0.5 MTPA, implements a new 0.3 MTPA coke oven plant, and expands a waste heat recovery power facility to 30 MW. Construction runs from May 2027 to April 2028, pending state environmental clearance.
Rs.827 Million Steel Plant Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: A metallurgical facility is undergoing a multi-tiered rolling mill and billet production expansion in Durgapur, West Bengal. Backed by a targeted Rs. 827.9 million optimization investment, the project upgrades existing induction setups to 11-Ton and 9-Ton capacities while lengthening operations to 350 working days. The plant modifications have received formal state pollution control board clearances.
Rs.13005 Million New Aluminium Downstream Product Mfg. Project in Rayagada, Odisha
Executive Summary: An upcoming industrial manufacturing venture is setting up a Rs. 13,005.7 million greenfield aluminum downstream products facility in Rayagada, Odisha. The plant will transform primary metals into high-value industrial profiles, plates, and extrusions. Backed by the state's High-Level Clearance Authority approval, the high-investment manufacturing node is moving into immediate infrastructural deployment phases.
Rs.4610 Million Steel Melting Shop Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: A massive Rs. 4,610 million metallurgy expansion project is underway in Paschim Bardhaman, West Bengal. The initiative scales steel melting capacity to 8,25,000 TPA using new induction and electric arc furnaces, while adding a 50 MW power plant and upgrading rolling mills. Environmental clearance has been filed with state regulatory authorities.
Rs.24000 Million New Integrated Steel Plant in Sambalpur, Odisha
Executive Summary: A new Steel, Iron, and Ferro Alloys manufacturing unit is planned in Sambalpur, Odisha, with an estimated investment of Rs. 8,710 million. The project aims to boost production capacity and support industrial growth. As of January 2025, it has received approval from the 134th State Level Single Window Clearance Authority (SLSWCA).