Latest Project Updates
Rs.14100 Million Steel Plant Expansion Project in Bankura, West Bengal
Executive Summary: A steel manufacturing company plans a major plant expansion in Bankura, West Bengal, including DRI kilns, induction furnaces with CCM & LRF, rolling mills, electric arc furnace, ferroalloy units, WHRB and FBC-based power plants, and I/O beneficiation and pellet plants. The total investment is ₹18,650 million, with construction from January 2026 to January 2028. Environmental clearance has been submitted as of September 2025.
Rs.236880 Million Integrated Steel Plant Expansion Project in Raigad, Maharashtra
Executive Summary: A company plans to expand an integrated steel plant in Raigad, Maharashtra, increasing capacity from 10 MTPA to 15 MTPA. The project, costing Rs. 236,880 million, is scheduled from June 2024 to June 2027 and has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance as of September 2025.
Rs.200000 Million New Integrated Steel Plant in Gadchiroli, Maharashtra
Executive Summary: A company plans a new steel products manufacturing unit in Gadchiroli, Maharashtra, with an investment of Rs. 165,800 million. The integrated steel plant will have a capacity of 4.2 MTPA, producing 3 MTPA of hot-rolled coils and 1.2 MTPA of wire rods, with the wire rod mill commissioning by September 2026 and full operations expected by mid-2027. Pollution consent has been obtained.
Rs.20450 Million Integrated Steel Plant Expansion Project in Raigarh, Chhattisgarh
Executive Summary: A company plans an integrated steel plant expansion in Jamgaon, Raigarh, Chhattisgarh, including DRI, steel melting, rolling mill, coal washery, captive power, sinter and blast furnace, and oxygen plant expansions. The pellet plant capacity will increase from 1.25 MTPA to 1.75 MTPA in two phases (Rs. 350 million). Construction is scheduled from April to October 2026, with environmental clearance underway.
Rs.5500 Million New Greenfield Plant in Giridih, Jharkhand
Executive Summary: A new Greenfield industrial plant is planned in Manjhiladih, Giridih, Jharkhand, to produce 123,000 TPA Ferro Alloy, 154,000 TPA Pig Iron, or 31,000 TPA Metallurgical Grade Silicon Metal. The facility will include a 6 MW captive power plant, a 20 TPH jigging plant, and a 240,000 TPA fly ash brick unit. Construction (Rs. 5,500 million) runs July 2025–Dec 2027; environmental clearance is under review.
Rs.9650 Million New Steel Plant in Paschim Bardhaman, West Bengal
Executive Summary: A company plans to establish a new steel plant in West Bengal with capacities including 429,000 TPA sponge iron, 412,500 TPA MS billets, 396,000 TPA MS rolled products, various ferroalloys, briquettes, sinter, and an 80 MW captive power plant. Estimated at Rs. 9,650 million, construction is scheduled from December 2026 to December 2028. Environmental clearance is under review as of September 2025.
Rs.977 Million New Fabrication and Galvanising Unit in Mayurbhanj, Odisha
Executive Summary: A company plans to set up a new fabrication and galvanising unit in Mayurbhanj, Odisha, with an estimated cost of Rs. 977.6 million. As of September 2025, the project has received investment approval from the State Level Single Window Clearance Authority (SLSWCA).
Rs.1400 Million New Heavy Steel Casting Foundry in Khordha, Odisha
Executive Summary: A company plans a new heavy steel casting foundry in Khordha, Odisha, with an estimated cost of ₹1,400 million. As of September 2025, the project has received investment approval from the State Level Single Window Clearance Authority (SLSWCA).
Rs.4972 Million New Metallurgical Unit in Dhule, Maharashtra
Executive Summary: A company plans to set up a new metallurgical unit in Dhule, Maharashtra, with a total capacity of 0.174 MTPA (pickling: 0.126 MTPA; non-pickling: 0.048 MTPA). The project, costing ₹4972.1 million, is scheduled for construction from January 2026 to December 2027. As of September 2025, it has been submitted to the State Environment Authority for clearance.
New Powder Coated Aluminum Channel Mfg. Project in Paschim Bardhaman, West Bengal
Executive Summary: A company plans a new aluminum channel manufacturing project in Paschim Bardhaman, West Bengal, producing 100 MT/month of powder-coated, 400 MT/month of anodized, and 100 MT/month of electro-coated anodized aluminum channels. The project is estimated at ₹59.271 million. As of September 2025, the company has obtained state pollution control consent to establish the facility.