Galvanized Structure From Expansion Project in Raipur, Chhtiisgarh
Executive Summary: A galvanized structure manufacturing expansion project is planned in Kanhera, Raipur, Chhattisgarh, increasing capacity from 18,000 MTPA to 30,000 MTPA. The project aims to boost efficiency, support infrastructure development, and create jobs. As of February 2025, it has received approval from the state pollution control authorities for establishment.
Rs.2400 Million New DRI based Steel Mfg. Plant in Raigarh, Chhattisgarh
Executive Summary: A new DRI-based steel manufacturing plant is planned in Pali, Chhattisgarh. The project includes two 200 TPD DRI kilns, 10 MW WHRB boilers, two submerged arc furnaces, and a 20 MW AFBC captive power plant. Additionally, a facility for fly ash bricks production will be established. The estimated project cost is Rs. 2400 million. Environmental clearance is being sought from the Ministry of Environment, Forest and Climate Change.
Rs.6200 Million DRI Plant Expansion Project in Sundargarh, Odisha
Executive Summary: A significant expansion of a Direct Reduced Iron (DRI) plant in Kalunga Industrial Estate, Odisha, is underway. The project aims to increase DRI plant capacity, upgrade the captive power plant, and enhance several plant facilities. With an investment of Rs. 3,111.2 million, construction will begin in May 2025 and finish by January 2027, pending environmental clearance.
Rs.540000 Million New Integrated Steel Plant in Koppal, Karnataka
Executive Summary: A new integrated steel plant is being planned in Koppal, Karnataka, with an annual production capacity of 10.50 million tonnes. The project is estimated to cost Rs.540,000 million and is expected to significantly enhance steel production in the region. As of February 2025, the company has officially announced the project.
Rs.125 Million Hot Charged Rolling Mill Expansion Project in Raipur, Chhattisgarh
Executive Summary: Expanding a hot charged rolling mill in Chhattisgarh with an estimated cost of Rs. 125 million. Annual capacity: 57,670 tons, plus eco-friendly initiatives.
MS Black Pipe/Sections Fabrication Project in Raipur, Chhattisgarh
Executive Summary: A Leading Steel Company is planning to take up steel plant expansion project Raipur, Chhattisgarh. The project involves expanding m.s. ingot / billets (through induction furnaces) and/or wire rod (through hot charging of ms billet in rolling mill) (from 70000 TPA to 157500 TPA),etc.
Steel Melting Plant Expansion Project in Tiruvallur, Tamil Nadu
Executive Summary: A steel melting plant and rolling mill expansion project is planned in Peddikuppam, Tiruvallur, Tamil Nadu, with an investment of Rs. 50.61 million. It includes a 12 T/Heat induction furnace and a 15 MT billet caster, increasing production capacity. Construction is set from May 2025 to May 2026, pending environmental clearance.
Rs. 15974 Million Integrated Steel Plant Expansion Project in Jalna, Maharahtra
Executive Summary: A steel manufacturing company is expanding its integrated steel plant in Jalna, Maharashtra, with an investment of Rs. 15,974 million. The project includes 6,000 TPD billets, 4,000 TPD TMT bars, a 500 TPD strip rolling mill, and a ferro-alloy unit. Construction begins in August 2025, with completion by December 2027, pending environmental clearance.
New Iron Alloys & Ferrero Silicon Products Mfg. Project in Bari Brahmna, Jammu & Kashmir
Executive Summary: A new manufacturing project for iron alloys and ferro silicon products is set to commence in Jammu & Kashmir, with a planned capacity of 4,620 MT per year. With an investment of Rs. 195.6 million, the project has received approval from state pollution control authorities as of January 2025, marking a key step in its establishment.
Ferro Vanadium Mfg. Expansion Project in Raigarh, Chhattisgarh
Executive Summary: A Ferro Vanadium manufacturing expansion in Rabo, Tehsil-Tamnar, Raigarh, Chhattisgarh, will enhance production of Ferro Vanadium (10,000 MT/Y), Ferro Molybdenum (10,000 MT/Y), and Calcined Petroleum Coke (24,000 MT/Y). Approved by state pollution authorities as of February 2025, the project aims to strengthen the steel and alloy supply chain, boost employment, and drive regional industrial growth.