Rs.150 Million Special Steel Ingot Mfg. Unit Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: A primary metals manufacturer is expanding its secondary steel production capabilities through a Rs. 150 million investment in Raniganj, West Bengal. Located inside the Mangalpur Industrial Complex, the project will scale the production of Special Steel Ingots to 30,200 Metric Tonnes annually. The site has secured formal state pollution control board clearances to begin construction.
Rs.3120 Million Blast Furnace Gas Fired Boiler Instalation Project in Angul, Odisha
Executive Summary: A major Indian metal conglomerate is executing a Rs. 3,120 million clean energy thermal utility project in Angul, Odisha. The infrastructure establishes a Blast Furnace Gas Fired Boiler over 3.71 acres inside an operational complex. Having secured state environmental clearance in May 2026, the facility will optimize industrial byproduct gases for efficient captive power.
New Metal Recovery Unit in Jhargram, West Bengal
Executive Summary: A prominent mineral and steel conglomerate is building a new Rs. 88 million byproduct metal recovery and processing plant in Jhargram, West Bengal. Using a 60 Metric Tonnes/Day jigging unit and dual high-capacity jaw-and-cone crushing circuits, the facility localizes extraction from ferroalloy slag. The project secured state pollution control board clearances to commence on-site works.
Rs.650000 Million Integrated Greenfield Steel Plant in Paradip, Odisha
Executive Summary: A leading multi-sector conglomerate is establishing a ₹650,000 million mega-scale integrated greenfield steel complex (13.2 MTPA) in Paradip, Odisha. The self-sustained industrial footprint features an integrated 900 MW captive power asset, a 10 MTPA cement grinding installation, and a private captive shipping jetty. On-site structural engineering and foundation works are mobilizing for immediate construction commencement.
New Shafts / Flats / Wheels Mfg. Unit in Howrah, West Bengal
Executive Summary: An established mechanical engineering component manufacturer is setting up a new ₹88.108 million production plant in Panchla, Howrah, West Bengal. Operating out of the Balaji Industrial Complex, the facility will produce 450 Metric Tonnes per month of specialized metal shafts, flats, and industrial wheels. Having secured state pollution control clearances in May 2026, immediate machinery procurement is underway.
Rs.8400 Million New Rolled Grain Oriented Electrical Steel Mfg. Project in Aurangabad, Maharashtra
Executive Summary: A new project is underway in Aurangabad, Maharashtra, involving the manufacturing of rolled grain-oriented electrical steel with a capacity of 64,000 tonnes per year. The project is in the planning stage and has obtained consent from the state pollution control authorities.
Rs.25000 Million New Sponge Iron Plant in Gadchiroli, Maharashtra
Executive Summary: A massive Rs. 25,000 million integrated steel and sponge iron plant is planned in Gadchiroli, Maharashtra. The facility features a 6,12,000 TPA sponge iron unit, extensive induction furnaces, rolling mills, and an 80 MW captive thermal power plant setup. Scheduled for construction between August 2026 and September 2028, the project is currently undergoing state environmental clearance reviews.
Rs.608 Million Sponge Iron Plant in Bilaspur, Chhattisgarh
Executive Summary: The brownfield project in Bilaspur, Chhattisgarh involves expanding an existing sponge iron plant's capacity from 30,000 to 96,000 TPA. It includes installing a 7 MW WHRB and a 7 MW AFBC/CFBC power plant with a Rs. 608.56 million investment. Construction runs from December 2026 to May 2027, following pending environmental clearance.
Rs.145 Million New Steel Rolling Mill Project in Paschim Bardhaman, West Bengal
Executive Summary: A steel company is planning to set up a new steel rolling mill in West Bengal with an estimated cost of Rs.145 million. The project involves producing Round & Rebar, Wire Rod & Structurals, Strips & Flats 120000 TPA. Environment clearance for the project is underway as of May 2022.
Rs.700 Million Chrome Ore Beneficiation Unit Expansion Project in Bhadrak, Orissa
Executive Summary: A company in Bhadrak, Orissa, is expanding its chrome ore beneficiation unit from 18,500 TPA to 360,000 TPA. The project includes installing submerged arc and electric arc furnaces for producing various ferro alloys, with a total production capacity of 115,000 TPA. The estimated cost is Rs. 700 million, with construction set to begin in March 2026. Environmental clearance is under review.