Thermal Power Expansion Plant in Jharsuguda, Odisha

State: Odisha
Investment: NA
Updated: 19 January 2024

Executive Summary: A thermal power expansion project is in Bhurkamubda, Kalimandir, Jharsuguda, Odisha. The project includes doubling the capacity from 328,440 MT to 656,880 MT and utilizing 5.17 acres of land. In January 2024, the company secured consent from state pollution control authorities to proceed with the establishment of the project.

Featured Metallurgical Industries

Rs.3561 Million Integrated Steel Plant Expansion Project in Sundergarh, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 15 January 2024

Executive Summary: A leading steel firm in Odisha plans a phased Rs.3561.9 million expansion, including DRI production, induction furnace, rolling mill, and power plant. With state pollution control consent secured, the project emphasizes sustainability and regional economic growth.

Featured Metallurgical Industries

New Chrome Ore Beneficiation Plant in Cuttack, Odisha

State: Odisha
Investment: Less than 100 Million
Updated: 04 January 2024

Executive Summary: In Cuttack, Odisha, a new Chrome Ore Beneficiation Plant is planned by a mining company. The project, valued at Rs.36.088 million, aims to set up the plant over a 3.020-acre area with a throughput capacity of 19,000 TPA. Construction is slated to begin in April 2024, concluding by June 2024. As of January 2024, the project awaits environmental clearance, underscoring a commitment to regulatory compliance in mining activities.

Featured Hospitality and Healthcare

Rs.1000 Million New Hi-tech Medical College & Hospital in Sundargarh, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 27 December 2023

Executive Summary: A hi-tech medical college and hospital with 470 beds in Raurkela Town, Sundargarh, Odisha, at an estimated cost of Rs.1000 million. Construction commenced in January 2011 and is scheduled to end in January 2025. As of December 2023, the project has been submitted to the Ministry of Environment, Forest, and Climate Change for examination of the environmental clearance process.

Featured Hospitality and Healthcare

Rs.1486 Million Rukmani Birla Hospital & Research Institute Expansion Project in Rajasthan

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 22 December 2023

Executive Summary: In Rajasthan, a substantial healthcare expansion project is progressing. Priced at Rs.1486.8 million, the initiative includes adding a new building block. Construction spans from March 2024 to December 2026, with the project awaiting environmental clearance as of December 2023, showcasing a commitment to responsible development in the healthcare sector.

Featured Metallurgical Industries

New Chrome Ore Beneficiation Plant in Bhadrak, Odisha

State: Odisha
Investment: Less than 100 Million
Updated: 20 December 2023

Executive Summary: A company in Odisha plans a chrome ore beneficiation plant in Bhadrak. The project, costing Rs. 51.95 million, aims to establish a plant within the existing Chrome monolithic unit with a throughput capacity of 18,500 Tons Per Annum. Construction is set to begin in February 2024 and conclude by December 2024. As of December 2023, the project awaits environmental clearance, having been submitted to the State Level Environment Impact Assessment Authority.

Featured Power Generation

New Thermal Power Plant in Sundargarh, Odisha

State: Odisha
Investment: NA
Updated: 18 December 2023

Executive Summary: A thermal power plant in Talsara, Odisha, with a 47000 MT capacity and an area of 4.85 acres. Estimated at Rs.82.939 million, the project has obtained consent from state pollution control authorities for establishment as of December 2023.

Featured Manufacturing

New Furniture Products Mfg. Project in Ganjam, Odisha

State: Odisha
Investment: Less than 100 Million
Updated: 15 December 2023

Executive Summary: A furniture manufacturing project in Ganjam, Odisha, involving the production of doors, beds, dining sets, sofa sets, office tables, dressing tables, epoxy furniture, HDHMR doors, and other interior products. The project, with an estimated cost of Rs.82.939 million, has received consent from state pollution control authorities for establishment as of December 2023.

Featured Food Processing

Rs.2378 Million New Grain-Based Ethanol Plant in Nuapada, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 15 December 2023

Executive Summary: A progressive project is unfolding as Vaswani Steel invests Rs.2378 million in a grain-based ethanol plant with a 200 KLPD capacity and a 5MW co-gen power plant. The initiative, validated by an investment proposal from the State Level Single Window Clearance Authority as of December 2023, underscores the company's commitment to sustainable energy practices and efficient regulatory processes in this transformative endeavor.

Featured Metallurgical Industries

Rs.8640 Million New Aluminium Battery Foil Mfg. Unit in Sambalpur, Odisha

State: Odisha
Investment: From 5000 Million to 49999 Million
Updated: 14 December 2023

Executive Summary: A new aluminum battery foil manufacturing unit is slated for development in Rengali, Sambalpur, Odisha, at an estimated cost of Rs. 8640 million. This forward-looking project reflects a commitment to cutting-edge technology. As of October 2023, the project has received approval from the State Level Single Window Clearance Authority (SLSWCA) meeting, marking a significant milestone in its progress.