Featured Petroleum

New Gas Suspension Absorber Project in Jagatsinghpur, Odisha

State: Odisha
Investment: Less than 100 Million
Updated: 09 October 2023

Executive Summary: A project to build a gas suspension absorber plant for SO2 emission control in Jagatsinghpur, Odisha, is planned by a company. As of October 2023, they have obtained approval from state pollution control authorities for the project.

Featured Petroleum

Motor Spirit, Superior Kerosene and Bio Diesel Mfg. Expansion Project in Jagatsinghpur, Odisha

State: Odisha
Investment: NA
Updated: 09 October 2023

Executive Summary: A project for manufacturing motor spirit, superior kerosene, bio diesel, and other petroleum products is planned in Paradeep, Odisha, without specifying the company name. The project aims for significant production capacity in various categories. As of October 2023, they have obtained consent from state pollution control authorities for the project.

Featured Metallurgical Industries

New Enhancement Of Testing Of Coal, Coke, Mineral Project in Khordha, Odisha

State: Odisha
Investment: NA
Updated: 06 October 2023

Executive Summary: A company is planning to enhance coal, coke, and mineral testing in Mancheswar, Khordha, Odisha. The project aims to increase testing capacity for various samples, including lime stone, chrome ore, iron ore, dolomite, bauxite, etc., from 50 Kg to 3000 samples per month on a commercial basis. As of October 2023, the project has received approval from state pollution control authorities.

Featured Hospitality and Healthcare

New Multi Specialty Hospital in Angul, Odisha

State: Odisha
Investment: NA
Updated: 06 October 2023

Executive Summary: A multi-specialty hospital with 200 beds is set to be constructed in Angul, Odisha. In October 2023, agreements were signed with the Health & Family Welfare department, marking a significant step towards enhancing healthcare in the region. This endeavor aims to provide advanced medical services and promote community well-being through education and outreach programs.

Featured Petroleum

Rs.2252 Million New Grain Based Distillery Mfg. Project in Boudh, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 05 October 2023

Executive Summary: A grain-based distillery project in Biramchandrapur, Odisha, with a capacity of 200 KLD ethanol production, alongside a 5.0 MW co-generation power plant and 2*500 KVA DG set spanning over 19 Ha. The project is budgeted at Rs. 2,250.4 million and has secured approval from state pollution control authorities as of October 2023.

Featured Food Processing

Rs.2921 Million New Carbonated Soft Drinks Mfg. Project in Khordha, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 05 October 2023

Executive Summary: A carbonated soft drinks manufacturing project in Khordha, Odisha, involving an additional production line for 1050 BPM carbonated soft drinks in PET packaging, along with a 2*2250 KVA DG set, within their existing 57.78-acre premises. The estimated project cost is Rs. 2,921.8 million, and as of October 2023, they have secured approval from state pollution control authorities for project establishment.

Featured Metallurgical Industries

New Aluminium Production Unit in Angul, Odisha

State: Odisha
Investment: NA
Updated: 04 October 2023

Executive Summary: A new aluminum production unit is planned in Nalco Nagar, Odisha. The project aims to increase aluminum production from 4.6 LTPA to 4.8 LTPA using the NIPL route, all within the existing premises and without incurring additional project costs. As of October 2023, the project has secured consent from state pollution control authorities.

Featured Food Processing

Rs.6243 Million New Beverages Mfg. Facility in Khordha, Odisha

State: Odisha
Investment: From 5000 Million to 49999 Million
Updated: 04 October 2023

Executive Summary: A new beverages manufacturing facility is planned in Mundaamba, Odisha. The project will include the production of various beverages, packaged drinking water, syrups, PET preforms, and a 3.0 MW captive rooftop solar power plant and and installation of DG sets of capacity 4x2000 KVA & 2x1010 KVA, with an estimated cost of Rs. 6240 million. In January 2023, the company obtained consent from state pollution control authorities. As of October 2023, the project involves various manufacturing capacities and a 3 MW solar power investment of Rs. 6243 million.

Featured Mining

Rs.1104 Million New Iron Ore Beneficiation Plant in Keonjhar, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 03 October 2023

Executive Summary: A new iron ore beneficiation plant in Odisha's Barbil. The project aims to optimize the raw material mix and auxiliary equipment to utilize low-grade iron ore fines while maintaining a throughput of 4.75 MTPA and a production capacity of 4.02 MTPA iron ore concentrate. The estimated cost is Rs. 1104.18 million, and as of October 2023, the company has obtained consent from state pollution control authorities for the project.

Featured Metallurgical Industries

Rs.997 Million New Ferro Alloys Plant in Khordha, Odisha

State: Odisha
Investment: From 100 Million to 999 Million
Updated: 28 September 2023

Executive Summary: A new ferro alloys plant in Sarua Industrial Estate, Odisha, with a maximum production capacity of 52,400 TPA ferro alloys through 2x9 MVA SAF or 35,000 TPA LC/MC Ferro-alloys through 2x3.6 MVA EAF, along with other production units. The project, costing Rs. 997 million, will commence construction in December 2024 and conclude in March 2025. As of September 2023, the project is under examination for environmental clearance by the Ministry of Environment, Forest, and Climate Change of India.