Rs.200 Million New Onshore Oil & Gas Exploration Project in Tripura
Executive Summary: A new onshore oil and gas exploration project is planned in Tripura, focusing on drilling and testing at Location OSTA in Mouja Kalsi Area. The project aims for a depth of 3500 meters TVD, with an estimated cost of Rs. 200 million. Construction starts in March 2025, ending by April 2026, pending state-level environmental clearance as of June 2024.
Rs.81100 Million New Oil and Gas Exploration Project in Andhra Pradesh
Executive Summary: A new onshore oil and gas exploration project is planned in Andhra Pradesh, covering 172 wells across eight blocks in Konaseema, West Godavari, and Krishna districts. With an estimated investment of ₹81,100 million, construction is set to begin in September 2025 and conclude by August 2026. Environmental clearance is currently under review by the central ministry.
New Onshore Crude Oil Processing and Storage Facility in Dibrugarh, Assam
Executive Summary: A new onshore crude oil processing and storage facility is planned in Naoholia, Dibrugarh, Assam, with an estimated cost of ₹40 million. The project includes an intermediate tank farm for crude oil receipt, processing, and dispatch. Construction is set to begin in January 2026 and conclude by July 2028. Environmental clearance is currently under review as of June 2025.
Rs.5200 Million New Grain Based Distillery Mfg. Project in Tirupati, Andhra Pradesh
Executive Summary: Company plans to establish a grain-based distillery in Andhra Pradesh, with a manufacturing capacity of 500 KLPD. The project costs Rs. 5200 million and construction is scheduled from September 2023 to December 2024. As of July 2023, the Ministry of Environment, Forest, and Climate Change has requested essential details for environmental clearance consideration.
Rs.17000 Million New Sustainable Aviation Fuel Plant in Jagatsinghpur, Odisha
Executive Summary: A ₹17,000 million Sustainable Aviation Fuel unit in Jagatsinghpur, Odisha, will produce 2,00,000 MTPA of SAF annually, offering an eco-friendly alternative to traditional aviation fuel. Investment approval was secured in December 2024.
Rs.2400 Million New Treated Distillate Aromatic Extraction Project in Mumbai, Maharashtra
Executive Summary: A new project is underway in Mumbai, Maharashtra, involving the construction of a 24 KTPA demonstration plant for Treated Distillate Aromatic Extract (TDAE) at a refinery. With an estimated cost of ₹2,400 million, construction began in June 2024 and is set to finish by April 2026. As of June 2025, it is in the "Notice to Proceed" stage via the EPC route.
New Green Hydrogen Generation Unit in Panipat, Haryana
Executive Summary: A new green hydrogen generation unit with a capacity of 10,000 tonnes per annum is planned at a refinery and petrochemical complex in Panipat, Haryana. The project aims to support clean energy goals and is scheduled for commissioning by December 2027. As of June 2025, the levelized cost of hydrogen (LCoH) has been finalized for implementation.
Steel Gast Pipeline Laying Project in Jajpur, Odisha
Executive Summary: A steel gas pipeline project is planned in Jajpur, Odisha, involving the laying of an 8-inch diameter pipeline over 21.499 km to supply 400,000 cubic meters of natural gas per day. The pipeline will connect Balipasi to an industrial facility. As of June 2025, the project has received consent to establish from the state pollution control authorities.
Rs.315 Million New Oil and Gas Exploratory Project in Sivasagar, Assam
Executive Summary: An oil and gas exploratory project is planned in Parijat Gaon Salaguri, Laiplingaon, Bokota, Nemuguri, Sivasagar, Assam, targeting well LPEV at specified coordinates. With an estimated cost of Rs. 315 million, the project aims to assess hydrocarbon potential. As of June 2025, it has received consent from the state pollution control authorities to proceed with establishment.
Rs.1930 Million New HP Trijet Unit in Visakhapatnam, Andhra Pradesh
Executive Summary: A new 7.4 KTPA demonstration plant is being developed at a refinery in Visakhapatnam, Andhra Pradesh, to produce Synthetic Aviation Fuel (SAF) from Used Cooking Oil using in-house TriJet technology. The project, estimated at Rs. 1,930 million, began construction in July 2024 and will complete by July 2027. As of June 2025, it is in the Notice to Proceed stage.