Rs.373 Million Clutches Mfg. Unit Expansion Project in Khairthal-Tijara, Rajasthan
Executive Summary: An automotive clutches manufacturing expansion is planned for the RIICO Industrial Area in Tapukara, Rajasthan. The project involves constructing an industrial shed, bringing the total built-up area to 27,861.11 sq. m. With a budget of Rs. 373 million, construction is slated for May 2026 to November 2027, following environmental clearance submitted to state authorities as of March 2026.
Rs.1700 Million New Synthetic Resin Adhesives Mfg. Plant in Jodhpur, Rajasthan
Executive Summary: A new chemical manufacturing plant is planned for Jodhpur, Rajasthan, focusing on emulsions (100,000 KL/A), synthetic resin adhesives (50,000 KL/A), and powder products (75,000 KL/A). Costing Rs. 1,700 million, the facility aims to bolster regional supply chains. Construction is scheduled from September to December 2026, following environmental clearance submission to state authorities as of March 2026.
New Zinc Alloy Manufacturing Facility in Bhilwara, Rajasthan
Executive Summary: A new manufacturing facility for producing high-quality, low-emission zinc alloys is planned at Zinc Park in Rajasthan. The project will support downstream value addition of zinc and cater to sectors such as automotive, die-casting, infrastructure, and consumer goods. The unit will leverage assured raw material supply from Hindustan Zinc and operate within the integrated industrial ecosystem being developed at the park. The initiative was formalized through an MoU signed in March 2026 and is aimed at strengthening sustainable metal processing and domestic manufacturing capabilities.
Rs.28180 Million Industrial Shed Expansion Project in Chittaurgarh, Rajasthan
Executive Summary: A massive ₹28,180 million industrial expansion is planned for Chittaurgarh, Rajasthan. The project will nearly triple the existing built-up area to 288,367.33 sq.m at the RIICO Industrial Area. Construction is set for April 2026 with a January 2027 completion. Currently, the proposal is under review by the State Level Environment Impact Assessment Authority for environmental clearance.
Rs.119 Million Hospital Expansion Project in Jaipur, Rajasthan
Executive Summary: A major ₹119.3 million hospital expansion is planned for Chomu, Jaipur, near NH-52. The project covers 27,214.87 sq. m. across multiple plots to enhance regional medical services. Construction is scheduled for completion by December 2027. As of March 2026, the proposal is awaiting environmental clearance from the State Level Environment Impact Assessment Authority.
Rs.3407 Million Blades System & Disposables Mfg. Expansion in Khairtal-Tijara, Rajasthan
Executive Summary: An industrial shed expansion is underway in Bhiwadi, Rajasthan, to increase manufacturing capacity for blade systems and disposables. The Rs.3,407.1 million project will expand the built-up area to 30,376.83 sq. m. Construction is scheduled from March to December 2026, pending environmental clearance. The facility aims to modernize production and logistics within a 51,807.23 sq. m site.
Rs.530 Million Chemical Fertilizer Mfg. Unit Expansion Proect in Udaipur, Rajasthan
Executive Summary: A chemical fertilizer manufacturer is expanding its Udaipur facility to reach a 132,000 TPA capacity. This ₹530.2 million project in Rajasthan aims to boost regional agricultural supplies. As of March 2026, the proposal is under SEIAA environmental review, with construction scheduled to run from April 2027 to March 2028.
Rs.1102 Million New Industrial Shed Unit in Khairthal-Tijara, Rajasthan
Executive Summary: A premier bath and lighting manufacturer is developing a ₹1,102.7 million industrial unit in Bhiwadi, Rajasthan. Spanning a 25,700 sqm built-up area, the project aims for a rapid construction timeline from April to December 2026. As of March 2026, the facility is awaiting SEIAA environmental clearance to begin high-volume production in the Khairthal-Tijara industrial belt.
Rs.1459 Million New Electricity Transmission Project in Bikaner, Rajasthan
Executive Summary: A major utility is executing a ₹1,459.8 million power transmission upgrade in Bikaner, Rajasthan. The project adds two 500 MVA transformers and 220 kV bays at the Bikaner-IV station. Currently in the Notice to Proceed stage via the EPC route, construction began in May 2025 and is scheduled for completion by February 2027.
Rs.12000 Million E-Bus Mfg. Plant in Rajasthan
Executive Summary: A leading energy corporation is converting 16 exploratory wells into development wells across six blocks in Golaghat, Assam. The ₹1,600 million project aims to transition from discovery to commercial crude oil and gas extraction. Currently awaiting environmental clearance, the decade-long operational phase is scheduled to run from February 2027 to February 2037.