Polyisobutylene Succinic Anhydride Mfg. Expansion Project in Siddipet, Telangana
Executive Summary: A manufacturing unit in Vantimamidi GP, Chinna Thimmapur, Mulugu, Siddipet, Telangana, plans to expand its Polyisobutylene Succinic Anhydride production capacity from 300 TPA to 600 TPA. The project, estimated at Rs. 12.9 million, has received consent from the state pollution control authorities as of May 2025, allowing the company to proceed with its expansion plans.
Rs.100 Million Heavy Structural MS Items Galvanizing and Fabrication Project in Telangana
Executive Summary: A new project is planned in Gudur, Bibinagar, Yadadri Bhuvangiri, Telangana, for galvanizing and fabricating heavy structural MS items (4,500 TPA) and operating a roll forming mill (6,000 TPA). With an estimated cost of Rs. 100.1 million, the project received consent to establish from the state pollution control board as of May 2025, allowing development to proceed.
Herbal Extract Mfg. Expansion Project in Medchal-Malkajgiri, Telangana
Executive Summary: A herbal extract manufacturing unit in IDA Nacharam, Medchal-Malkajgiri, Telangana, is set to expand its production capacity from 400 kg/day to 2,400 kg/day. The project, estimated at Rs. 35.918 million, has received consent to establish from the state pollution control board as of May 2025, paving the way for further development and implementation.
Rs.6500 Million New Formulation Products Mfg. Project in Medchal-Malkajgiri, Telangana
Executive Summary: A pharmaceutical manufacturing unit is set to be established in MN Park, Phase-II, Kolthur, Muduchintalapalli, Medchal-Malkajgiri, Telangana, with a planned capacity of 291.67 million tablets and capsules per month. The project, estimated to cost Rs. 6,500 million, received consent to establish from the state pollution control board as of May 2025, enabling the commencement of project development.
Rs.1863 Million New Industrial Park in Mahabubnagar, Telangana
Executive Summary: A new industrial park is being developed in Polepalli, Rajapur, Jadcherla, Mahabubnagar, Telangana, covering 386.2 hectares at an estimated cost of Rs. 1863.78 million. Construction began in January 2007 and is expected to conclude by December 2025. As of May 2025, the project has been submitted for environmental clearance to the State Level Environment Impact Assessment Authority.
Rs.589 Million Synthetic Organic Chemicals Mfg. Expansion Project in Medchal Malkajgiri, Telangana
Executive Summary: A synthetic organic chemicals manufacturing facility in Jeedimetla, Telangana is set for expansion, merging existing units and increasing production capacity from 23,612 MT/year to 75,264 MT/year. The project, estimated at Rs.589.5 million, includes the addition of a new plot. Construction is scheduled from November 2025 to February 2026, with environmental clearance under review as of May 2025.
New Research and Development Facility in Medchal-Malkajgiri, Telangana
Executive Summary: A new Research and Development facility is planned for Biotech Park, Phase-II Extension, Lalgadi Malakpet, Telangana. The project, estimated at Rs. 75 million, will focus on advancing biotech and healthcare innovations. As of May 2025, the necessary consent has been received from state pollution control authorities to proceed with the establishment of the facility.
Rs.150 Million New Research and Technology Unit in Medchal-Malkajgiri, Telangana
Executive Summary: A new Research and Technology Unit is planned at Shapoorji Pallonji Bioteck Park, Phase-I, in Turkapally, Shameerpet, Telangana. The project, estimated at ₹150 million, aims to establish a unit for advanced research and technology development. As of May 2025, consent has been received from the state pollution control authorities to proceed with the project.
Rs.170 Million New Research and Development Unit in Medchal-Malkajgiri, Telangana
Executive Summary: A new ductile iron pipe manufacturing unit with a capacity of 283,200 metric tonnes per year is planned in Rakha Jungle, PS Kharagpur, Paschim Medinipur, West Bengal. The project, estimated at Rs. 1,614.3 million, has received consent from the state pollution control authorities as of May 2025, enabling the establishment process to move forward.
Rs.50000 Million New Data Center Complex in Ranga Reddy, Telangana
Executive Summary: A new data center complex is planned in Chandanvelli, Machanpalle, Shabad, Ranga Reddy, Telangana, covering 161,851.9 sq.m of land with a built-up area of 455,546.64 sq.m. It includes a GIS building and six data center blocks. Estimated at ₹50,000 million, construction will run from June 2025 to May 2029. The project is currently awaiting environmental clearance.