Tower Parts Fabrication Expansion Project in Medchal Malkajgiri, Telangana

State: Telangana
Investment: Less than 100 Million
Updated: 25 May 2026

Executive Summary: A tower parts fabrication and galvanizing facility is executing an industrial capacity expansion in Medchal, Telangana. The project aims to double production output, increasing processing capabilities from 40 MT/Day to 80 MT/Day. Budgeted at an estimated cost of Rs.70.9 million, the brownfield expansion secured official consent to establish from state pollution control board authorities as of May 2026.

Featured Research and Development

Rs.200 Million Research and Development Unit Expansion Project in Medchal Malkajgiri, Telangana

State: Telangana
Investment: From 100 Million to 999 Million
Updated: 25 May 2026

Executive Summary: A biotechnology research and development facility is undergoing a major brownfield lab expansion in Genome Valley, Shamirpet, Telangana. The project adds 6,825 square feet of advanced laboratory space to scale up process development for biologics. Supported by an incremental capital investment of Rs.200 million, the specialized expansion officially secured its state pollution control board regulatory clearance as of May 2026.

Featured Food Processing

Rs.5580 Million New Coffe Plant in Siddipet, Telangana

State: Telangana
Investment: From 5000 Million to 49999 Million
Updated: 21 May 2026

Executive Summary: A new ₹5,500 million ultra-modern freeze-dried instant coffee plant with a 5,500 TPA capacity is being developed in Wargal, Siddipet, Telangana. Equipped with advanced European technology, the export-led facility achieved a key developmental milestone in May 2026 by receiving formal "Consent to Establish" from state pollution control authorities to initiate on-site construction.

Featured Manufacturing

Decorated & Undecorated Plastic Containers Mfg. Project in Rangareddy, Telangana

State: Telangana
Investment: Less than 100 Million
Updated: 21 May 2026

Executive Summary: A new 10 TPD manufacturing facility for decorated and undecorated plastic packaging—including containers, bottles, jars, and closures—is coming up in Farooqnagar, Rangareddy, Telangana. Estimated at Rs. 87.4 million, the industrial project achieved a major milestone in May 2026 by securing formal "Consent to Establish" from state pollution control authorities to begin plant construction.

Featured Manufacturing

Rs.300 Million Explosives Products Mfg. Expansion Project in Nalgonda, Telangana

State: Telangana
Investment: From 100 Million to 999 Million
Updated: 21 May 2026

Executive Summary: A major Rs. 300 million explosives manufacturing expansion is underway in Chityal, Nalgonda, Telangana. The project significantly boosts production capacities, scaling PETN to 9.167 TPD and Slurry Cartridge Explosives to 225 TPD. As of May 2026, state pollution control authorities have granted formal "Consent to Establish," greenlighting immediate brownfield construction and equipment upgrades.

Featured Metallurgical Industries

Rs.129 Million New Aluminum Die Castings Products Mfg. Project in Rangareddy, Telangana

State: Telangana
Investment: From 100 Million to 999 Million
Updated: 19 May 2026

Executive Summary: An industrial manufacturer is setting up a new aluminum die castings and extrusion project at IP-EMC Maheshwaram, Rangareddy, Telangana. Budgeted at Rs. 129 million, the facility will produce 50,000 units annually. As of May 2026, the project has officially advanced after receiving mandatory environmental consent from the state pollution control authorities to commence establishment.

Featured Manufacturing

Rs.415 Million New Battery Energy Storage Systems Assembly Project in Rangareddy, Telangana

State: Telangana
Investment: From 100 Million to 999 Million
Updated: 19 May 2026

Executive Summary: An advanced mobility and electronics firm is setting up a new Battery Energy Storage Systems assembly facility in Ibrahimpatnam, Rangareddy, Telangana. Located within the MSME General Park, the Rs. 415 million project will feature a monthly capacity of 25 units. As of May 2026, the unit has secured official regulatory consent to establish from state pollution control authorities.

Featured Distillery

Rs.7500 Million New Grain-Based Distillery Plant in Nalgonda, Telangana

State: Telangana
Investment: From 5000 Million to 49999 Million
Updated: 18 May 2026

Executive Summary: A grain-based distillery project is proposed in Veerlapalem Village, Damarcherla Mandal, Telangana, with an investment of Rs.7,500 million. The project includes a 600 KLD ethanol/ENA production plant and a 15 MW co-generation power unit. Construction is planned between July 2026 and September 2027, while environmental clearance approval is currently under review by SEIAA.

Featured Infrastructure

Rs.38269 Million New 4 Laning Project in Telangana

State: Telangana
Investment: From 5000 Million to 49999 Million
Updated: 14 May 2026

Executive Summary: A Rs. 38,269 million project is upgrading 80.01 km of NH-167 to a 4-lane standard between Gudebellur and Mahabubnagar, Telangana. Part of the Hyderabad–Panaji corridor, the work includes major bridges and bypasses to ease congestion. Currently under implementation as of May 2026, the highway aims to significantly boost regional freight and passenger connectivity.

Featured Chemicals

Rs.325 Million Herbal Extracts Mfg. Expansion Project in Medchal-Malkajgiri, Telangana

State: Telangana
Investment: From 100 Million to 999 Million
Updated: 13 May 2026

Executive Summary: A specialized manufacturer is doubling its Herbal Extracts production to 200 kg/day at its Medchal-Malkajgiri facility in Telangana. The Rs. 325 million expansion includes dedicated lines for Colchicoside and Thiocolchicoside. Having secured state pollution control clearance in May 2026, the project is now moving into the formal establishment phase to bolster regional bioactive production.