Latest Project Updates
New Formulation Unit in Sangareddy, Telangana
Executive Summary: A company is planning to set up a new formulation unit in the Notified Industrial Area, Sangareddy, Telangana. The project will manufacture ceiling fans (230,000 units/year) and table fans (50,000 units/year), with an estimated cost of Rs. 21 million. The company has received consent from state pollution control authorities to establish the project as of March 2025.
Rs.188 Million New Research and Development Project in Medchal-Malkajgiri, Telangana
Executive Summary: A new Research and Development (R&D) unit is planned for Lalgadi Malakpet, Shamirpet, Telangana, with an investment of Rs. 188.2 million. The project will focus on advancing scientific research and innovation across various sectors. As of March 2025, the company has received consent from state pollution control authorities to move forward with the R&D facility.
Rs.850 Million New Industrial Park in Rangareddy, Telangana
Executive Summary: A new industrial park is planned in Kancha Gachilbowli, Seringampally, Rangareddy, Telangana, covering 122.63 acres. The project, estimated to cost Rs. 850 million, will feature a multi-use zone. As of March 2025, the necessary consent from the state pollution control authorities has been obtained, allowing the project to proceed.
Rs.170 Million Rolling Mill Expansion Project in Rangareddy, Telangana
Executive Summary: A rolling mill expansion project is planned in Kothur, Rangareddy, Telangana, aimed at increasing steel rod, bar, and coil production from 290 TPD to 636 TPD. The estimated project cost is Rs. 170.8 million. As of March 2025, consent has been received from the state pollution control authorities to establish the project.
Hospital Building Construction Project in Hyderabad, Telangana
Executive Summary: A new hospital building project is planned in Banjara Hills, Hyderabad, featuring a single block with three basements, a ground floor, and six upper floors, covering 23,572.6 sqm. With an estimated cost of Rs. 1,800 million, construction is set to begin in May 2025 and finish by November 2027. Environmental clearance has been obtained.
Rs.8330 Million New Manufacturing Unit in Telangana
Executive Summary: A new manufacturing unit is being set up in Telangana with an estimated cost of Rs. 8330 million. A joint venture with a European pharmaceutical company has been formed for the project. The board has approved the initiative, which aims to enhance production capacity and strengthen market presence. The project is set to commence by March 2025.
Rs.253 Million New Steel Door Mfg. Unit in Sangareddy, Telangana
Executive Summary: A new steel door manufacturing unit is planned in Macherla, Hathnoor, Sangareddy, Telangana, with a capacity of 3 TPD. The project is estimated to cost Rs. 253.8 million. As of March 2025, the company has received approval from the state pollution control authorities to establish the unit, which will contribute to local manufacturing and job creation.
New PNG/FO Fired Boiler Installation Project in Sangareddy, Telangana
Executive Summary: A beverage manufacturing company is installing a new PNG/FO-fired 6 TPH boiler at its facility in Telangana, replacing the existing briquette-fired boiler. The upgrade aims to enhance production efficiency for juices, soft drinks, and syrups, totaling 169,654 cases/day. With an investment of Rs. 35 million, the project has received environmental clearance as of March 2025.
Rs.303 Million New Pre Engineering Building Materials Mfg. Unit in Sangareddy, Telangana
Executive Summary: A new Pre-Engineering Building Materials Manufacturing Unit is planned in IDA Pashamylaram, Patancheru, Sangareddy, Telangana, with an installed capacity of 1590 TPM. The project will produce components like columns, rafters, and beams. Estimated at Rs. 303.3 million, the project has received consent from state pollution control authorities as of February 2025.
New Sewage Treatment Plant Construction Project in Rangareddy District, Telangana
Executive Summary: A new Sewage Treatment Plant (STP) is planned in Attapur, Rajendranagar, Rangareddy District, Telangana, with a capacity of 40 MLD to improve wastewater management and environmental sustainability. The project, with an investment of Rs. 637.2 million, aims to enhance sewage treatment infrastructure. As of January 2025, consent from state pollution control authorities has been secured to proceed with the project.