Latest Project Updates
Rs.2040 Million New Ice Cream Mfg. Facility in Shamirpet, Telangana
Executive Summary: A new ice cream manufacturing facility is planned in Shamirpet, Telangana, with an estimated cost of Rs. 2040 million. As of September 2024, consent has been granted by state pollution control authorities, allowing the project to move forward. This facility aims to enhance production capabilities, meet growing consumer demand, and contribute to local employment and the regional economy.
Rs.2200 Million New Hospital Project in Hyderabad, Telangana
Executive Summary: A new hospital project is underway in Kondapur, Hyderabad, focused on women's and children's healthcare. The facility will have a capacity of 300 beds and span 300,000 square feet, with an estimated cost of Rs. 2200 million. Pre-project activities are currently in progress, aiming for completion and operation of the first phase by mid-FY 2026.
Rs.218 Million New Grain Based Distillery Unit in Komarambheem Asifabad, Telangana
Executive Summary: A new grain-based distillery unit is planned in Metpalle Village, Komarambheem Asifabad, Telangana, with a capacity of 100 Kilo Litres per Day (KLPD) and a 3 Megawatt captive power plant. The project, estimated at Rs. 218 million, aims to produce high-quality alcohol and generate electricity for internal use. Construction is currently underway, with operations expected to start in April 2025.
Rs.343 Million New R & D Unit in Sangareddy, Telangana
Executive Summary: A new research and development unit focused on bulk drugs and drug intermediates is planned in Bollaram, Jinnram, Sangareddy, Telangana, with an estimated project cost of Rs. 343 million. As of September 2024, consent from state pollution control authorities has been obtained, allowing the project to proceed and contributing to local economic growth and innovation in pharmaceutical development.
Rs.540 Million New Sewage Treatment Plant in Medchal-Malkjagiri, Telangana
Executive Summary: A new sewage treatment plant is set to be established in Ramacheruvu, Mallapur, Medchal-Malkajgiri, with a capacity of 30 million liters per day (MLD). The project, estimated to cost Rs. 540.8 million, has received necessary approvals from state pollution control authorities as of September 2024. This initiative aims to improve wastewater management and public health standards in the region.
New Shining Powder and Liquid Formulation Unit in Rangareddy, Telangana
Executive Summary: A new formulation unit is planned for Inmulnarva, Kothur, Rangareddy, Telangana, with production capacities including shining powder (13,973 kg/day), shining liquid (384 kg/day), combo shining pack (845 kg/day), dishwash liquid (187 kg/day), drain cleaner (158 kg/day), floor cleaner (100 kg/day), and metal polish (240 kg/day). The ₹44 million project has received state pollution control authority consent as of September 2024.
Rs.412 Million New Packaging Material Mfg. Unit in Mahbubnagar, Telangana
Executive Summary: A new packaging material manufacturing unit is being set up in Polepalle, Jedcheria, Mahbubnagar, Telangana, with an estimated cost of Rs. 412.6 million. The facility will produce ABL/PBL tubes (21 lakhs kg/month), flexible packaging (60 tons/month), and aluminum tubes (21 lakhs units/month). As of September 2024, state pollution control authorities have approved the project.
Rs.413 Million New R & D and Biotech Facility in Telangana
Executive Summary: A new Research and Development (R&D) and Biotech Facility is planned for MN Park, Turkapally, Shamirpet (M), Medchal Malkajgiri, Telangana. The project, costing ₹413.582 million, will focus on advanced research and biotech innovations, including drug development. As of September 2024, it has received environmental clearance from the state pollution control authorities, allowing construction to proceed.
Rs.118 Million Pharma Products Mfg. Project in Sangareddy, Telangana
Executive Summary: A new pharmaceutical manufacturing project in Telangana will establish a facility for producing hospital HVAC systems and UV sterilizers, among other products. With an investment of Rs. 118.5 million, the project has received state pollution control authorities' consent as of September 2024, and is set to enhance production capabilities in the healthcare sector.
New Steel Alloy Castings Mfg. Unit in Sangareddy, Telangana
Executive Summary: A new steel alloy castings manufacturing unit is planned for Pashamailaram, Patancheru, Sangareddy, Telangana, with a capacity of 4 tons per day and an estimated cost of Rs. 75.1 million. As of July 2024, the project has received consent from state pollution control authorities, enabling it to proceed with construction and setup.