Latest Project Updates
Rs.10508 Million Ramagundam Opencast Coal Mining Expansion Project in Peddapalli, Telangana
Executive Summary: A company is planning to expand the Ramagundam opencast coal mining project in Telangana. The expansion aims to increase the mining capacity to 9.52 MTPA, covering an area of 2070.10 hectares. With an estimated cost of Rs. 10508.6 million, the project has received consent from state pollution control authorities as of May 2023.
New Rubber Oil Mfg. Unit in Medak, Telangana
Executive Summary: A new rubber oil manufacturing unit is planned in Kamaram, Shankarampet, Medak, Telangana, with a capacity of 6 TPD and an estimated cost of Rs.65 million. Consent from state pollution control authorities has been obtained as of May 2023.
Rs.6717 Million Ramagundam Opencast Coal Mining Expansion Project in Peddapalli, Telangana
Executive Summary: A new opencast coal mining expansion project is planned in Julapalli, Ramagiri, Peddapalli, Telangana. The project aims to expand the capacity of Ramagundam opencast coal mining to 5.3 MTPA. The estimated cost is Rs. 6,717.3 million. As of May 2023, the company has obtained consent from state pollution control authorities for the project.
Rs.141 Million New Pellets and Granulations Mfg. Unit in Mahbubnagar, Telangana
Executive Summary: A pharmaceutical company plans to establish a new manufacturing unit in Pollepally, Jadcherla, Telangana. The project aims to produce pellets, granulations, tablets, capsules, syrups, and injectables. The manufacturing capacities include 2000 kg/day for pellets and granulations, 500 kg/day for tablets and capsules, 0.5 KL/day for syrups, and 200,000 nos/day for injectables. Consent from state pollution control authorities has been obtained as of May 2023.
Rs.100 Million M.S Billets/Ingots Mfg. Expansion Unit in Rangareddy, Telangana
Executive Summary: A steel manufacturing company plans to establish an M.S billets/ingots manufacturing expansion unit in Telangana. The project involves expanding the capacity for M.S billets/ingots to 1000 TPD and producing various rolled products. The estimated cost is Rs.100 million. Consent from state pollution control authorities has been obtained as of May 2023.
Rs.254 Million New Bulk and Intermediates Mfg. Unit in Siddipet, Telangana
Executive Summary: A pharmaceutical company plans to establish a bulk and intermediates manufacturing project in Telangana. The project includes capacities for probiotics, enzymes, nutraceutical ingredients, capsules, sachets, and pellets. Estimated at Rs. 254.4 million, the company has obtained consent from pollution control authorities as of May 2023.
Rs.940 Million New Electronic Manufacturing Cluster in Rangareddy, Telangana
Executive Summary: Telangana plans to establish an electronic manufacturing cluster in Kongara Kalan Village, Rangareddy. Spread across 303.50 acres, the project aims to boost the electronics industry with an estimated cost of Rs. 940.5 million. Construction is set to begin in September 2023 and end in September 2024. Environmental clearance is currently underway.
Rs.1008 Million New Prototyping Facility Expansion Unit in Rangareddy, Telangana
Executive Summary: A prototyping facility expansion project is planned in Knowledge City, Rangareddy, Telangana. The project involves increasing the capacity of the facility, covering an area of 78,000 square meters, with advanced equipment for welding, machining, sheet metal operations, and more. The estimated cost is Rs. 1008 million. Consent from state pollution control authorities has been obtained as of May 2023.
New Fluxes Mfg. Expansion Unit in Medak, Telangana
Executive Summary: A company plans to establish a fluxes manufacturing unit in Telangana's Manoharabad. The project involves setting up a unit for manufacturing fluxes, diecoats, and related products. The estimated cost is Rs. 58 million. Consent from state pollution control authorities was obtained in July 2020. As of May 2023, the project includes expanding fluxes and diecoats production with an investment of Rs. 54.5 million.
Recovery of Organics Mfg. Expansion Unit in Medchal-Malkajgiri, Telangana
Executive Summary: A company plans to expand its organic recovery project in Medchal, Telangana. The project involves establishing the recovery of piperazine anhydrous, sodium methoxide, trityl chloride, and L-menthol. The estimated cost is Rs.63.15 million. Consent from pollution control authorities has been obtained as of May 2023.