Latest Project Updates
Rs.1238 Million New Warehousing Unit in Unnao, Uttar Pradesh
Executive Summary: A new logistics and warehousing facility with a storage capacity of 49,663.765 square meters is planned for Village Mehnora, Hasanganj, Unnao, Uttar Pradesh. Estimated at Rs. 1,238.2 million, the supply chain asset is scheduled for a construction timeline running from December 2026 to November 2028. The proposal is currently under state-level environmental review.
Rs.55002 Million New Link/Connector Corridor Construction Project in Uttar Pradesh
Executive Summary: A 43.218 km connector corridor is planned along the River Varuna to link National Highway-31 with the Varanasi Ring Road, bypass routing congestion away from Varanasi city. Built under the Hybrid Annuity Mode for Rs. 55,002.4 million, structural construction runs from December 2026 through December 2029. The regional infrastructure development has successfully received central environmental clearance.
Rs.1975 Million New Factory Building Construction Project in Gautam Buddha Nagar, Uttar Pradesh
Executive Summary: A massive home appliance manufacturing factory spanning 102,007.20 square meters is slated for development at Sector-28, YEIDA, in Gautam Buddha Nagar, Uttar Pradesh. Estimated at Rs. 1,975.8 million, the infrastructure project is scheduled to begin construction in September 2026 and finish by October 2030. The proposal is currently under environmental clearance review.
Rs.1500 Million New 2G Ethanol Biorefinery Unit in Dhanaura, Uttar Pradesh
Executive Summary: A new 91 KLPD Second Generation (2G) Ethanol Biorefinery project is planned at Wave Sugar complex in Dhanaura, Uttar Pradesh. Estimated at Rs. 1,500 million, the eco-friendly plant converts biomass waste into fuel using high-end thermal integration. In June 2026, the clean-tech development secured financial support approval via the Ministry of Petroleum & Natural Gas' PM JI-VAN Yojana.
Rs.39099 Million New 4 Lane Highway Construction Project in Uttar Pradesh
Executive Summary: A new 4-lane highway construction project valued at Rs. 39,099 million is underway across Bahraich and Barabanki in Uttar Pradesh. Part of the NH-927 corridor (Package 2), the alignment connects Mustfabad to Biswariya. As of June 2026, the development is in the active implementation stage, with an independent consulting firm overseeing project engineering guidelines.
Rs.82000 Million New Integrated Solar Manufacturing Hub in Uttar Pradesh
Executive Summary: A new Integrated Solar Manufacturing Hub is planned along the Yamuna Expressway, Uttar Pradesh, with a solar cell production capacity of 5 GW. The project, estimated at Rs. 82,000 million, aims to boost domestic solar manufacturing, reduce import dependence, and generate regional employment. As of November 2025, land allotment from the state government has been received.
Rs.39324 Million New 4 Lane Highway Construction Project in Barabanki, Uttar Pradesh
Executive Summary: A public highway authority is executing a 43.030-km, four-lane expansion on the NH-927 section from Barabanki to Mustafabad in Uttar Pradesh under the Hybrid Annuity Mode. Managed by a designated independent engineering consultant and valued at Rs. 39,324 million, the access-controlled logistics corridor has transitioned into its structural implementation stage as of June 2026.
Rs.9396 Million New Chitrakoot Link Expressway Project in Chitrakoot, Uttar Pradesh
Executive Summary: UPEIDA is executing the Rs. 9,396.7 million greenfield Chitrakoot Link Expressway from Bharatkoop (Chainage 0+000) to Ahmad Ganj, Karwi (Chainage 15.172) in Uttar Pradesh. The 15.17-km access-controlled, 4-lane asset expands to 6 lanes and includes 5 bridges and 17 underpasses. Construction spans December 2026 to May 2028, with SEIAA environmental appraisal currently underway.
Rs.2883 Million New Integrated Manufacturing & Logistic Cluster in Budaun, Uttar Pradesh
Executive Summary: A state-backed infrastructure agency is launching a Rs. 2,883.6 million greenfield Integrated Manufacturing & Logistic Cluster across 269 acres in Sadar, Budaun, Uttar Pradesh. Situated near the Ganga Expressway, the hub caters to manufacturing and freight logistics. Planned for construction between April 2027 and March 2028, the industrial node currently awaits state environmental clearance.
Rs.4677 Million New Grain based Ethanol Distillery Plant in Gorakhpur, Uttar Pradesh
Executive Summary: An industrial expansion project is planned for the Dhuriyapar Industrial Area, Gorakhpur, Uttar Pradesh. It features a 750 KLD grain-based ethanol plant, a 20 KLD malt distillery, and a 15 MW co-generation power unit. Costing Rs. 4,677.5 million, environmental clearance is pending, with construction targeted to run from September 2026 to September 2027.