Latest Project Updates
New Grain Based Distillery Unit in Udham Singh Nagar, Uttarakhand
Executive Summary: A company is planning to establish a grain-based distillery unit with a capacity of 180 KLPD in Kashipur, Uttarakhand. The project has been approved by the board of directors, and an additional unit of 200 KLD with a 7 MW co-generation power plant is also under development with an investment of Rs. 1000 million. Environmental clearance for the project is pending as of April 2022.
New ACSR Conductor Mfg. Project in Dehradun, Uttarakhand
Executive Summary: A new ACSR conductor manufacturing project is being planned in Dehradun, Uttarakhand. The project includes the manufacturing of ACSR/AAA/AA Conductor/Stay Wire with a capacity of 32584 M Ton. An industrial entrepreneurs' memorandum was filed in January 2022, and as of April 2022, the project is in the planning stage.
New Electronic And Electric Wires And Cables Mfg. Project in Uttarakhand
Executive Summary: A new manufacturing unit is planned by Tibrewala Electromech in Haridwar for producing electronic and electric wires and cables with a capacity of 1000 Ton. The project is in planning stage since Jan 2022 and expected to boost the local economy and cater to the rising demand for wires and cables.
New Integrated Municipal Solid Waste Processing Facility in Pithoragarh, Uttarakhand
Executive Summary: The State Government is planning to take up new integrated municipal solid waste processing facility in Pithoragarh, Uttarakhand. The project involves establishment of Integrated Municipal Solid Waste Processing Facility
Rs.152 Million New Solid Waste Management and Disposal Facility in Pauri Garhwal, Uttarakhand
Executive Summary: A local government entity is planning to construct a solid waste management and disposal facility with a 43 TPD compost plant and 11,800 MT landfill with a design period of 5 years. The estimated cost of the project is Rs.152.16 million and environment clearance is underway as of March 2022.
Welding Electrodes Mfg. Project in Haridwar, Uttarakhand
Executive Summary: A Company is planning to take up welding electrodes manufacturing project in Haridwar, Uttarakhand. The project involves manufacturing of welding electrodes of capacity 36000 Tons.
Denatured Anhydrous Ethanol Mfg. Project in Nainital, Uttarakhand
Executive Summary: A company plans to set up a manufacturing plant in Nainital, Uttarakhand to produce denatured anhydrous ethanol with a capacity of 21000 KL. The project is in the planning stage, with the company filing an industrial entrepreneurs' memorandum in December 2021 to obtain necessary clearances and approvals. The production of denatured anhydrous ethanol involves removing water from ethanol, creating highly concentrated alcohol with various industrial applications.
Rs.8610 Million New Four Laning Project in Uttarakhand
Executive Summary: A new four-laning project is planned in Uttarakhand, India at an estimated cost of Rs.8610 million. The project will upgrade and four-lane the Haridwar bypass Package-1. The lowest bidder in January 2022 formed a subsidiary for executing the project on Hybrid Annuity Mode to reduce traffic congestion.
Rs.145 Million Tiwari Goan-Ghangreti Bridge Project in Uttarakhand
Executive Summary: The Government of Uttarakhand is planning to build a 160-meter Tiwari Goan-Ghangreti bridge in Nainital at a cost of Rs. 145 million. The project is under development, and the DPR/feasibility study is in progress. The project aims to provide better connectivity, promote tourism and boost the local economy. TPF Getinsa Euroestudios is the project management consultant. The construction of the bridge is expected to create job opportunities and improve the overall infrastructure of the region.ss
New LED Drivers Mfg. Project in Udhamsingh Nagar, Uttarakhand
Executive Summary: A company is planning to set up a new project in Udhamsingh Nagar, Uttarakhand to manufacture 6 million LED drivers. The project is currently in the planning stage as of November 2021, and the company has filed an industrial entrepreneurs' memorandum in September 2021.