New & Upcoming Projects In India

A complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India.

Latest Project Updates

Featured Metallurgical Industries

Rs.950 Million New Greenfield Steel Plant in Puruliya, West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 25 September 2024

Executive Summary: A new greenfield steel plant is planned in Lachhyara, Raghunathpur, West Bengal, focusing on producing Ferro Alloys, Fe-Mn, billets, rolled products, and hard coke. With an estimated cost of Rs. 950 million, construction is set to begin in March 2025 and conclude in January 2026. Environmental clearance is currently under examination.

Featured Petroleum

Rs.6000 Million Chemical Mfg. Unit Expansion Project in Purba Medinipur, West Bengal

State: West Bengal
Investment: From 5000 Million to 49999 Million
Updated: 18 September 2024

Executive Summary: A chemical manufacturing unit in P.O. & P.S. Durgachak, Purba Medinipur, West Bengal, is set to expand its production capacities. The project will include a 25 Megawatt BPSTG unit and increase annual outputs of phenol (40,000 MT), propylene (75,000 MT), and acetone (24,000 MT). Estimated costs are Rs. 6000 million, with necessary approvals secured as of September 2024.

Featured Manufacturing

New Leather Product Mfg. Project in Kantatala, West Bengal

State: West Bengal
Investment: Less than 100 Million
Updated: 16 September 2024

Executive Summary: A new leather manufacturing facility is planned in West Bengal to produce 6,000 gents' wallets and 2,000 ladies' bags daily, catering to domestic and international markets. The Rs. 61.611 million project is in the pre-project phase as of September 2024. It will boost production capacity, create jobs, and support the company’s long-term growth in the leather industry.

Featured Manufacturing

Rs.560 Million New PP Woven Sacks Mfg. Project in Paschim Bardhaman, West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 16 September 2024

Executive Summary: A new polymer manufacturing facility is planned in West Bengal, focusing on diverse products, including 300 metric tonnes per month of PP Woven Sacks, 63.17 MTPM of PP Scrap, and various masterbatches. The Rs. 560.3 million project is in the pre-project phase as of September 2024. It aims to enhance production capacity, create jobs, and support local suppliers.

Featured Infrastructure

Rs.576 Million New Business cum Mercantile Building Construction Project in West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 13 September 2024

Executive Summary: A new Business cum Mercantile Building is being constructed in Mauza-Gopalpur, Maheshtala, South 24 Parganas, West Bengal, with a built-up area of 33,295.197 square meters and an estimated cost of Rs. 576 million. Construction is set to proceed following consent from state pollution control authorities, received as of September 2024.

Featured Chemicals

New Herbicides and Insecticides Products Mfg. Project in Paschim Medinipur, West Bengal

State: West Bengal
Investment: Less than 100 Million
Updated: 12 September 2024

Executive Summary: A new manufacturing project for herbicides and insecticides is planned in Jakpur, Paschim Medinipur, West Bengal. The facility will produce solid and liquid herbicides and insecticides, with capacities of 120 MT/M and 120 KL/M, respectively, and biological products at 50 MT/M. Estimated at Rs. 93 million, the project has received state pollution control authorities' consent as of September 2024.

Featured Manufacturing

High Density Polythene Pipe Mfg. Project in Birbhum, West Bengal

State: West Bengal
Investment: Less than 100 Million
Updated: 12 September 2024

Executive Summary: A new High-Density Polyethylene (HDPE) pipe manufacturing project is planned for Mouza-Shibpur, Sibtala Surotheswar, Bolpur, Birbhum, West Bengal. The facility will produce 200,000 pipes annually, with an estimated cost of Rs. 97.7 million. As of September 2024, the project has received consent from state pollution control authorities to proceed.

Featured Textiles

Rs.114 New Nonwoven Fabric Mfg. Project in Howrah, West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 11 September 2024

Executive Summary: A new project at Sudhara Food Park in Howrah, West Bengal, will produce nonwoven fabric using virgin PP granules with a capacity of 358 MTPM. The Rs. 114.633 million venture has received state pollution control approval as of September 2024.

Featured Food Processing

Rs.160 Million New Oil Mfg. Unit in Hooghly, West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 10 September 2024

Executive Summary: A new facility is planned in Kalachara, Hooghly, West Bengal, with a monthly production capacity of 3,000 Metric Tons for Physically Refined Vegetable Oil, 30 Metric Tons for Spent Earth, and other products including Rice Vax, Gums, Interesterified/Hydrogenated Vegetable Oil, and Margarine. The project, costing ₹1,160.744 million, has received state pollution control consent and aims to boost production and local employment. _

Featured Environment

New Waste Management Project in Paschim Medinipur, West Bengal

State: West Bengal
Investment: Less than 100 Million
Updated: 09 September 2024

Executive Summary: A new waste management project is planned for Dharma, Harishpur, Kotwali, Paschim Medinipur, West Bengal. The facility will process 405 MT/month of compost, 162 MT/month of recyclables, and 600 MT/month of RDF. The project, costing ₹74.813 million, has received state pollution control authority consent as of September 2024, enabling its development.