Latest Project Updates
Rs.9396 Million New Chitrakoot Link Expressway Project in Chitrakoot, Uttar Pradesh
Executive Summary: UPEIDA is executing the Rs. 9,396.7 million greenfield Chitrakoot Link Expressway from Bharatkoop (Chainage 0+000) to Ahmad Ganj, Karwi (Chainage 15.172) in Uttar Pradesh. The 15.17-km access-controlled, 4-lane asset expands to 6 lanes and includes 5 bridges and 17 underpasses. Construction spans December 2026 to May 2028, with SEIAA environmental appraisal currently underway.
Rs.450 Million New Industrial and Logistic Park in Ahmadabad, Gujarat
Executive Summary: A Notable Developers is establishing a Rs. 450 million greenfield Industrial and Logistic Park across 98,229.75 square meters in Moraiya, Sanand, Ahmedabad, Gujarat. The layout offers specialized industrial storage and multi-modal transit yards. Construction runs from December 2026 to June 2028, and is currently undergoing state environmental clearance.
Rs.58000 Million New Coal Bed Methane Production Project in Madhya Pradesh
Executive Summary: A premier energy corporation is launching a Rs. 58,000 million unconventional gas drilling and production initiative across Shahdol and Anuppur, Madhya Pradesh. The upstream project spans the Sohagpur East Block, developing 188 wells and three Gas Gathering Stations. Scheduled to undergo phased drilling between December 2026 and November 2036, state environmental clearance is pending.
Rs.15000 Million New Integrated Specialty Chemicals Mfg. Project in Bharuch, Gujarat
Executive Summary: A prominent chemicals conglomerate is launching a Rs. 15,000 million greenfield advanced battery materials and specialty fluorochemicals manufacturing node in Bharuch, Gujarat. The layout will yield 60,000 TPA of LFP, 25,000 TPA of Lithium Hydroxide, and 300 TPD of Caustic Soda. Slated for structural construction between December 2026 and January 2028, state environmental clearance is pending.
Rs.8000 Million Integrated Mini Steel Plant Expansion Project in Satara, Maharshtra
Executive Summary: A prominent metallurgical company is executing an Rs. 8,000 million mini steel plant expansion and modernization in Satara, Maharashtra. The infrastructure initiative scales production to 0.5 MTPA, implements a new 0.3 MTPA coke oven plant, and expands a waste heat recovery power facility to 30 MW. Construction runs from May 2027 to April 2028, pending state environmental clearance.
New Construction Chemicals Mfg. Project in Cuttack, Odisha
Executive Summary: A new construction materials plant is under development at Baranga, Cuttack, Odisha. The specialized facility features a monthly capacity of 9,800 MT for construction chemicals and 300 KL for liquid waterproofing agents to feed regional infrastructure needs. The development has officially secured formal Consent to Establish from the state pollution control board.
Rs.27880 Million New Data Center in Anakapalli, Andhra Pradesh
Executive Summary: A premier digital infrastructure provider is establishing a Rs. 27,880 million hyperscale data center in Anakapalli, Andhra Pradesh. The specialized facility will support a massive 100 MW IT load capacity tailored for cloud colocation and high-performance AI processing. Backed by formal June 2026 cabinet clearance, the project is transiting into active site development phases.
New Resort Project in Odisha
Executive Summary: A premier hospitality brand is entering the Odisha market with a boutique 30-key lakeside resort project at Chilika Lake. Developed in collaboration with a diversified industrial partner, the eco-resort features curated all-day dining, a bar, meeting rooms, and wellness facilities. The nature-led greenfield asset focuses entirely on capturing the high-end experiential tourism segment.
Rs.4955 Million New Group Gathering Station in Sivasagar, Assam
Executive Summary: A state-owned energy enterprise is building a Rs. 4,955.9 million hydrocarbon facility in Sivasagar, Assam. The installation integrates a 2,000 KLPD Oil Collecting Station, a 1,000 KLPD effluent treatment unit, and a 1,500 KLPD reservoir water injection system. Moving under a strict EPC route since October 2025, the project holds an active Notice to Proceed status.
Rs.7500 Million New Solar Power Project in Phalodi, Rajasthan
Executive Summary: A renewable energy developer is completing a Rs. 7,500 million utility-scale solar asset in Phalodi, Rajasthan. The 150 MW generation layout is engineered to feed power directly into the national grid via the Bhadla-III Grid Sub-Station. Having started construction in May 2025, the facility is currently in its final under-implementation phase.