Latest Project Updates
Rs.400 Million Composite Airframe Assembly Unit in Bangalore, Karnataka
Executive Summary: An aerospace materials firm is setting up a new Rs. 400 million composite airframe assembly facility in the Adinarayanahosalli Industrial Area, Bengaluru. The unit will manufacture composite tooling, specialized machinery, and advanced aviation materials. Approved by the State Review Committee in August 2025, active on-site structural project work has officially commenced as of June 2026.
New 1.2 GW TOPCon Solar Cell mfg. Unit in Uttar Pradesh
Executive Summary: A prominent clean energy enterprise is establishing a new 1.2 GW TOPCon solar cell manufacturing facility in Amroha, Uttar Pradesh. Utilizing high-efficiency tunnel oxide passivated contact technology, the greenfield line is designed to streamline domestic solar component supply chains. As of June 2026, the company has finalized multiple global technology MoUs to execute industrial deployment.
Rs.273 Million New Moulded Plastic Products Mfg. Unit in South 24 Parganas, West Bengal
Executive Summary: An industrial plastic component manufacturer is setting up a new Rs. 273.62 million production unit in Maheshtala, South 24 Parganas. The facility will produce cable ties and insulating liners with a monthly capacity of 200 MT. As of June 2026, the project has advanced past key regulatory hurdles, receiving state pollution control consent to establish.
Iron and Steel Mfg. Expansion Project in Bemetara, Chhattisgarh
Executive Summary: A heavy engineering firm is executing a structural steel manufacturing plant expansion in Bemetara, Chhattisgarh. The project elevates capacities for railway bridges (up to 62,500 TPA), standard bridge sections (up to 25,000 TPA), and prefabricated civil components. As of June 2026, the company has obtained formal state pollution control consent to establish the expanded setup.
Rs.100 Million Battery Mfg. Unit Expansion Project in Vizianagaram, Andhra Pradesh
Executive Summary: An energy storage systems manufacturer is executing a Rs. 100 million plant expansion in Vizianagaram, Andhra Pradesh. The project introduces specialized high-volume assembly lines for Nickel-Cadmium batteries, establishing a production capacity of 40 million Ampere Hours monthly. As of June 2026, the unit has secured state pollution control consent to establish.
Rs 350 Million New HDPE/PP Recycling Facility in Jalgaon, Maharashtra
Executive Summary: A new HDPE and PP recycling facility is being planned at Additional Jalgaon MIDC in Maharashtra with an investment of over Rs 350 million. The project will feature advanced extrusion and granulation technology along with deep-vacuum deodorisation systems for producing industrial-grade recycled plastic granules. The plant will initially process 1,100 tonnes per month and forms part of a larger Rs 5,000 million recycling and circular manufacturing programme in the state. Commissioning is targeted between October and December 2026 with support from the Government of Maharashtra for land allotment and approvals.
Synthetic Organic Chemicals Mfg, Expansion Project in Chhatrapati Sambhajinagar, Maharashtra
Executive Summary: A chemical manufacturer is executing an expansion project at MIDC Waluj, Chhatrapati Sambhajinagar, to establish a 188 TPA Synthetic Organic Chemicals facility within its existing plant. Financed via a Rs. 72.6 million investment, the construction phase will span January to June 2027. Environmental clearance documentation is actively under assessment by state authorities.
Rs.4500 Million Billets Mfg. Expansion Project in Jalna, Maharashtra
Executive Summary: A metallurgical expansion project is underway in Jalna, Maharashtra, involving a Rs. 4,500 million investment to upgrade an existing scrap unit. The project adds 6,93,000 TPA billet capacity via three induction furnaces and 7,93,000 TPA of TMT/rolled products. Construction runs from April to December 2027, with state environmental clearance currently pending.
Rs.2100 Million New Hospital Construction Project in Gautam Buddha Nagar, Uttar Pradesh
Executive Summary: A new 300-bedded healthcare facility is planned for Greater Noida, Uttar Pradesh, featuring an investment of Rs. 2,100 million. Situated in Knowledge Park V, civil construction is scheduled to span from October 2026 to August 2027. The project has been formally submitted to the state authority for mandatory environmental clearance.
Rs.1217 Million New Cardiac Hospital Construction Project in Vadodara, Gujarat
Executive Summary: A Ground + 5 floor cardiac and multi-specialty hospital expansion featuring 289 beds is planned for development in Vadodara, Gujarat. Funded via a Rs. 1,217.56 million capital outlay, physical building operations are slated from August 2026 through February 2028. The comprehensive project blueprint currently awaits mandatory state environmental clearance.