Rs.2150 Million New Steel Fabrication Unit in Jajpur, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 10 June 2026

Executive Summary: A joint-venture structural steel specialist is establishing a new ₹2,150 million steel fabrication unit in Jajpur, Odisha. The facility will cater to regional industrial downstream demand. As of June 2026, the strategic project has officially secured investment approval from the State-Level Single Window Clearance Authority, clearing the path for site development and local procurement.

Featured Textiles

Rs.1455 Million New Knitted Garments Unit in Sambalpur, Odisha

State: Odisha
Investment: From 1000 Million to 4999 Million
Updated: 10 June 2026

Executive Summary: A leading apparel exporter is setting up a new ₹1,455 million knitted garments manufacturing unit in Sambalpur, Odisha. Aimed at scaling export-grade fabric processing, the strategic project officially secured investment approval from the State-Level Single Window Clearance Authority in June 2026, paving the way for immediate site development, plant infrastructure setup, and regional supply chain integration.

Featured Textiles

Rs.160 Million Embroidery Coding, Staring and Stiching Project in Bangalore, Karnataka

State: Karnataka
Investment: From 100 Million to 999 Million
Updated: 10 June 2026

Executive Summary: A textile specialist is setting up a ₹160 million automated embroidery coding, starching, and stitching facility in Doddaballapura, Bangalore, Karnataka. Approved by the SLSWCC in August 2025, structural construction and machinery installation have actively commenced as of June 2026. The plant will supply specialized downstream finishing services to the regional commercial garment industry.

Featured Manufacturing

Rs.165 Million New Electriacl Control Panel Mfg. Unit in Bangalore, Karnataka

State: Karnataka
Investment: From 100 Million to 999 Million
Updated: 10 June 2026

Executive Summary: An automation specialist is setting up a new ₹165 million electrical control panel and PLC manufacturing facility in Doddaballapura, Bangalore, Karnataka. Approved by the SLSWCC in August 2025, structural civil works and site setup have actively commenced as of June 2026. The plant will provide localized manufacturing and servicing for high-demand industrial power distribution networks.

Featured Manufacturing

Rs.252243 Million Rapid Test Kit Mfg. Unit Expansion Project in Nadia, West Bengal

State: West Bengal
Investment: More than 49999 Million
Updated: 10 June 2026

Executive Summary: A medical diagnostics manufacturer is executing a rapid test kit manufacturing unit expansion in Kalyani, Nadia, West Bengal. The facility will produce 50,000 test kits per month to address point-of-care demands. As of June 2026, the project has officially received its Consent to Establish from state pollution control authorities, initiating immediate facility engineering and equipment procurement.

Featured Metallurgical Industries

Rs.300 Million DI Pipes Mfg. Expansion Project in Paschim Medinipur, West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 10 June 2026

Executive Summary: A heavy metals manufacturer is executing a ₹300 million expansion project in Paschim Medinipur, West Bengal, to boost DI pipe and fittings capacity from 26,000 TPA to 59,400 TPA. The upgrade includes adding manhole cover manufacturing and installing an advanced 9-ton induction furnace. The project secured state pollution control board consent in June 2026.

Featured Food Processing

Rs.2337 Million New Spray Dried Coffee Processing Unit in Tirupati, Andhra Pradesh

State: Andhra Pradesh
Investment: From 1000 Million to 4999 Million
Updated: 10 June 2026

Executive Summary: A beverage exporter is establishing a new ₹2,337.3 million spray-dried coffee processing facility in the APIIC Industrial Park at Mambattu, Tirupati, Andhra Pradesh. The plant will specialize in advanced soluble coffee extraction and processing. As of June 2026, the strategic project has secured official investment approval from the state government, initiating immediate site mobilization and equipment sourcing.

Featured Manufacturing

Rs.20000 Million New Consumer Healthcare Products Mfg. Unit in Pithampur, Madhya Pradesh

State: Madhya Pradesh
Investment: From 5000 Million to 49999 Million
Updated: 10 June 2026

Executive Summary: A leading healthcare multinational is setting up its first standalone ₹20,000 million consumer healthcare products manufacturing plant in Pithampur, Madhya Pradesh. Announced in June 2026, the mega facility will specialize in high-speed, automated formulation and packaging to anchor the company's domestic supply chain and cater to growing regional wellness product demands.

Featured Manufacturing

Rs.5255 Million Std Termination Assembly Project in Maharashtra

State: Maharashtra
Investment: From 5000 Million to 49999 Million
Updated: 10 June 2026

Executive Summary: A telecom infrastructure specialist is executing a ₹5,255 million component manufacturing facility in MIDC Waluj, Chhatrapati Sambhaji Nagar, Maharashtra. The plant will annually produce over 315 lakh total units of optical termination assemblies, MPO connectors, and distribution boxes. The project secured state pollution control authority consent in June 2026, initiating immediate production line setup.

Featured Metallurgical Industries

New Fabricated Metal Products Mfg. Project in Durg, Chhattisgarh

State: Chhattisgarh
Investment: NA
Updated: 10 June 2026

Executive Summary: A metallurgical firm is setting up a new fabricated metal products plant in Bhilai, Durg, Chhattisgarh. The unit will produce 57,600 MT/A of fabricated products, 29,400 MT/A of zinc-coated sections, and 6,000 MT/A of railway track construction material. The project secured state pollution control authority consent in June 2026, initiating immediate site engineering.