Latest Project Updates
Rs.172 Million New Packaging Products Mfg. Unit in Bangalore, Karnataka
Executive Summary: A new manufacturing unit for commercial packaging products is being set up at Adinarayanahosahalli Phase II in Bangalore, Karnataka. The project involves a total capital investment of Rs.172 million, which was approved by the State Level Single Window Clearance Committee in August 2025. On-site structural development and initial project work have officially commenced as of May 2026.
Rs.145 Million New Steel Rolling Mill Project in Paschim Bardhaman, West Bengal
Executive Summary: A steel company is planning to set up a new steel rolling mill in West Bengal with an estimated cost of Rs.145 million. The project involves producing Round & Rebar, Wire Rod & Structurals, Strips & Flats 120000 TPA. Environment clearance for the project is underway as of May 2022.
Rs.450 Million New Industrial Building Construction Project in Satara, Maharashtra
Executive Summary: A new electronic components and cable assembly manufacturing complex is planned for construction in Shindewadi, Satara District, Maharashtra. The project involves building a 27,994.78 square meter industrial facility with a capital investment of Rs.450 million. Structural construction is slated to run from August 2026 to August 2027, currently awaiting state environmental clearance as of May 2026.
Rs.2500 Million New Inorganic Pigments Mfg. Project in Tiruchirappalli, Tamil Nadu
Executive Summary: A new ₹2,500 million greenfield manufacturing facility is planned for construction within the SIPCOT Industrial Park in Manapparai, Tiruchirappalli, Tamil Nadu. The project, which recently secured formal board approval, will establish an inorganic pigments production capacity of 2,500 MT. Implementation will execute across dual phases spanning fiscal years 2027–28 and 2028–29 utilizing internal funds and commercial loans.
Rs.11000 Million Electronics Components Mfg. Expansion Project in Noida, Uttar Pradesh
Executive Summary: A domestic mobile handset and hardware manufacturer is executing a Rs. 11,000 million electronics component expansion project in Noida, Uttar Pradesh. The development establishes localized production facilities for camera modules, display tracks, enclosures, and multi-layer PCBs. The developer has formally filed for fiscal clearances under central and state-level component manufacturing incentive schemes to begin physical machinery deployment.
New Waste to Compressed Biogas Project in Tamil Nadu
Executive Summary: A renewable energy developer is setting up two localized waste-to-compressed biogas plants in Coimbatore and Salem, Tamil Nadu, with capacities of 12.5 TPD and 10 TPD respectively. Processing a combined 550 tonnes of municipal organic waste daily using specialized CSTR anaerobic digestion, the green energy assets will prevent landfill methane escape under an active turnkey EPC development framework.
Rs.1000000 Million New Nuclear Energy Project in Maharashtra
Executive Summary: A state-owned energy conglomerate is planning a new Rs. 1,000,000 million, 7,200 MW nuclear power generation facility in Maharashtra. The mega-infrastructure asset is designed to scale low-carbon baseload power across western industrial grids. Having executed a formal MoU with the state government for site allocation and resources, pre-project engineering workflows are actively underway.
New Resort Project in Rajasthan
Executive Summary: A premium hospitality asset owner has partnered with an international hotel operator to construct a 225-key luxury resort across 16 acres in Achrol, along the Delhi–Jaipur highway. Featuring 36 private villas, 189 premium rooms, and extensive ballroom venues, the development targets premium leisure and destination weddings. The project operates under a long-term management framework aiming for a 2030 launch.
Rs.60000 Million New Integrated Manufacturing Hub in Karnataka
Executive Summary: An aerospace and defense infrastructure firm is establishing a Rs. 60,000 million Integrated Manufacturing Hub in Devanahalli, Bengaluru. Implemented across three phases, the facility will support manufacturing, testing, and MRO lines for defense, semiconductors, and AI sectors. Having cleared initial state pollution control regulatory approvals, the 200-acre project targets substantial regional job creation.
Rs.56240 Million New Velimalai Pumped Storage Hydro Electric Project in Kanniyakumari, Tamil Nadu
Executive Summary: An 1,100 MW Pumped Storage Hydro Electric Project is planned across 159.25 hectares in Alur and Velimalai villages, Tamil Nadu, costing Rs. 56,240 million. Featuring an underground powerhouse with four 275 MW units, the venture recently secured central Terms of Reference (ToR) clearance. This permits detailed environmental impact assessments and public hearings for the off-stream peak-power recycling facility