Rs.5000 Million New Chemical Mfg. Unit in Kakinada, Andhra Pradesh
Executive Summary: A new specialty chemicals manufacturing facility is planned for development on a 50-acre industrial campus within the Kakinada Special Economic Zone in Andhra Pradesh. Budgeted at Rs. 5,000 million, the export-focused plant will manufacture high-value performance chemicals. The developer formalized land integration in June 2026 by signing a strategic Memorandum of Understanding.
Rs.55002 Million New Link/Connector Corridor Construction Project in Uttar Pradesh
Executive Summary: A 43.218 km connector corridor is planned along the River Varuna to link National Highway-31 with the Varanasi Ring Road, bypass routing congestion away from Varanasi city. Built under the Hybrid Annuity Mode for Rs. 55,002.4 million, structural construction runs from December 2026 through December 2029. The regional infrastructure development has successfully received central environmental clearance.
Rs.110 Million Dyes & Dyes Intermediates Mfg. Expansion Project in Ahmadabad, Gujarat
Executive Summary: A chemical expansion project at Phase I, GIDC Estate in Vatva, Ahmedabad, will increase dyes and dye intermediates manufacturing capacity from 170 TPM to 320 TPM. Budgeted at Rs. 110 million, construction on the facility is slated to run from October 2026 to March 2027. The project is currently undergoing state-level environmental clearance reviews.
Rs.1975 Million New Factory Building Construction Project in Gautam Buddha Nagar, Uttar Pradesh
Executive Summary: A massive home appliance manufacturing factory spanning 102,007.20 square meters is slated for development at Sector-28, YEIDA, in Gautam Buddha Nagar, Uttar Pradesh. Estimated at Rs. 1,975.8 million, the infrastructure project is scheduled to begin construction in September 2026 and finish by October 2030. The proposal is currently under environmental clearance review.
New Cold Storage Unit in Guntur, Andhra Pradesh
Executive Summary: A new Rs. 70.3 million cold storage unit is coming up at Sy.No. 601, Bypass Road, Ankireddypalem, Guntur. The facility features a capacity of 65,000 bags per annum, specializing in preserving agricultural products like red chilies. As of June 2026, state pollution control authorities have granted the crucial Consent to Establish.
Rs.425 Million Adhesives Mfg. Unit Expansion Project in Satara, Maharashtra
Executive Summary: An industrial adhesives manufacturing facility in Satara, Maharashtra, is executing a Rs. 425 million expansion project. The site will add massive capacities for Flex Pack, Pressure Sensitive Hygiene, Hot Melt, and Water-based adhesives alongside engineering variants. Backed by central environmental clearance, construction activities are scheduled to begin in October 2026, with full operations targeted for September 2029.
Rs.37702 Million New Oil and Gas Production Project in Gujarat
Executive Summary: A major energy corporation is investing Rs 37,702.4 million to develop 656 onshore oil and gas wells across 52 blocks in Gujarat’s Kheda, Gandhinagar, Mehsana, and Ahmedabad districts. Aiming for a 3,810,000 MT capacity, the project is scheduled for execution between June 2026 and March 2029. Environmental clearance is currently being sought from state authorities.
New Joining, Fixing Rails Materials Mfg. Project in Durg, Chhattisgarh
Executive Summary: A new railway infrastructure component manufacturing facility is slated for development at Plot No.- 12, Rail Park, Hathkhoj, Durg, Chhattisgarh. The site will manufacture specialized track elements including 2,400 glued insulated rail joints and 1,200 switch expansion joints annually. The engineering project advanced into its setup phase in June 2026 after securing state pollution control authority consent.
Rolling Mill Expansion Project in Raigarh, Chhattisgarh
Executive Summary: A metallurgical expansion project in Taraimal, Raigarh, Chhattisgarh, is scaling total rolling mill capacities to 1,15,700 TPA. The development integrates hot-charged mill expansions, a new reheating furnace mill with a 4,800 Nm3/hr coal gasifier, and a 4 MW waste heat recovery power plant. The heavy industry infrastructure secured state pollution control authority consent in June 2026.
Rs.641 Million Beverages Mfg. Unit Expansion Project in Kolkata, West Bengal
Executive Summary: A beverage manufacturing facility in Taratala, Kolkata, is executing a dual-phase expansion to produce 10,440 KL/month of bottled water and 829 KL/month of boxed juices. Backed by a new Rs. 641.6 million investment, the site is adding a 2,808 KL/month canned carbonated soft drink line. State pollution control authorities have granted full consent for operations.