Latest Project Updates
Rs.3761 Million Onshore Exploration Project in Damoh, Madhya Pradesh
Executive Summary: An onshore energy exploration initiative in Damoh, Madhya Pradesh, is underway to develop 15 oil and gas wells within the VN-ONN-2009/3 block. The ₹3,761.1 million project includes exploration, development, and production phases. Scheduled for completion by January 2030, the project submitted its environmental clearance application in April 2026 to facilitate long-term resource extraction operations.
Rs.101 Million New Synthetic Organic Chemicals Mfg. Unit in Raigarh, Maharashtra
Executive Summary: A new chemical manufacturing facility is being developed in Panvel, Maharashtra, with an investment of ₹101.3 million. The unit will produce 49,785 TPA of foundry coatings and binders. Following its environmental clearance application in April 2026, construction is slated to run from October 2026 to November 2027, boosting the regional industrial chemical supply chain.
Rs.33010 Million New Chemical Cluster & Grain Based Distillery Unit in Paschim Bardhaman, West Bengal
Executive Summary: A mega-industrial project in Paschim Bardhaman, West Bengal, involves a ₹33,010 million investment for a chemical cluster and 500 KLPD grain-based distillery. The facility will produce acetic acid, starch derivatives, and bio-ethanol, supported by a 30 MW power plant. Construction is planned for December 2026 to December 2027, following environmental clearance from state authorities.
New Coal to Chemicals Plant in Odisha
Executive Summary: The project involves execution of a coal-to-chemicals plant with a capacity of 2000 tonnes per day in Odisha. The contract has been awarded for engineering, procurement and construction, marking a significant development in coal gasification-based chemical production. The project has received necessary approvals and is expected to be implemented as per scheduled timelines.
New Semiconductor Fabrication Unit in Gujarat
Executive Summary: A major semiconductor facility is coming to Dholera, Gujarat, following Union Cabinet approval in May 2026. The integrated unit focuses on compound semiconductor fabrication and ATMP for Mini/Micro-LED modules. Utilizing GaN technology, it will produce 72,000 sq. meters of display panels annually, strengthening India’s domestic chip ecosystem and high-tech manufacturing self-reliance.
Rs.4250 Million Aluminium Rolled and Extrusion Products Unit Expansion Project in Bengaluru Rural, Karnataka
Executive Summary: A leading aluminium manufacturer is expanding its Bengaluru-based facility with a Rs. 4,250 million investment. The project scales up production across rolled, extruded, and powder-coated product lines while expanding the facility's footprint. The proposal is currently undergoing environmental assessment, with construction planned for completion between late 2027 and late 2028.
Rs.2260 Million New Integrated Manufacturing & Logistic Cluster in Etawah, Uttar Pradesh
Executive Summary: A strategic industrial and logistics cluster is being developed in Etawah to stimulate regional economic expansion. The project involves building essential infrastructure, including roads, drainage, power, and water systems. With an investment of Rs. 2,260 million, the development is awaiting environmental clearance as of April 2026, with construction planned for completion between April 2027 and March 2028.
Rs.8000 Million New Viksit Bharat Mumbai Marina Development Project in Mumbai, Maharashtra
Executive Summary: A major maritime tourism project is being developed in Mumbai Harbour to host world-class yachting facilities and shore-side amenities, including a sailing school and hotel. Utilizing a hybrid public-private model with an investment of approximately Rs. 8.87 billion, the project aims to boost the blue economy. Pending environmental clearance as of April 2026, construction is scheduled through late 2029.
Rs.6369 Million Fortis Super Specialty Hospital Expansion Project in Sahibzada Ajit Singh Nagar, Punjab
Executive Summary: A premier healthcare provider is expanding its Mohali facility with a Rs. 6,369.2 million investment. The project adds 455 beds (830 total) across three new blocks, including a specialized mental health unit. Covering a built-up area of 1,11,447.03 sq.m, construction is slated for July 2026 to July 2031, following pending environmental clearances as of April 2026.
Rs.65000 Million New Solar PV Ingot and Wafer Mfg. Unit in Nellore, Andhra Pradesh
Executive Summary: A large-scale solar manufacturing project is being developed to produce PV ingots and wafers with a total capacity of 10 GW in two phases of 5 GW each. The project involves an investment of Rs 65000 million and will be located in Nellore, Andhra Pradesh. It aims to support backward integration, reduce import dependence, and align with domestic solar manufacturing policies. The facility is expected to leverage policy incentives and approvals, with phased implementation and strong financial returns anticipated.