Updated on: 02 December 2024
| Basic Details | Information |
|---|---|
| Project Promoter | Subscribers Only |
| Ownership Type | Private Sector |
| Industry | Chemicals |
| Subcategory | Oil & Gas / Refinery |
| Products & Capacity | Nitrogen line (Length :2.148 km, Size :6 inch, Pipeline ROU width of 20 m)shall be laid parallel to the Sulphuric Acid (H2SO4) pipeline for cleaning & purging purposes for the Sulphuric acid pipeline. The nitrogen quantity required for pigging operation is considered at the rate of ~2850 Nm3/hr for ~ 4 hours (3145 Cubic Meters/Hour), Sulphuric Acid Pipeline (Length :2.148 km, Size :16 inch, Operating Temp: 40 deg C, Operating Pressure : 6-4 kg/cm2, Pipeline ROU width of 20 m) (525 Cubic Meters/Hour) |
| Location | Haldia, P.O-Haldia Oil Refinery |
| District | Purba Medinipur |
| State | West Bengal |
| Investment | From 100 Million to 999 Million |
| Status | Pre Project Stage |
| Endproduct | Oil & Gas / Refinery |