Rs.498 Million New Chemical Pipe Line Mfg. Project in Purba Medinipur, West Bengal

Top Banner

Project Basic Details

Updated on: 02 December 2024

Basic Details Information
Project Promoter Subscribers Only
Ownership Type Private Sector
Industry Chemicals
Subcategory Oil & Gas / Refinery
Products & Capacity Nitrogen line (Length :2.148 km, Size :6 inch, Pipeline ROU width of 20 m)shall be laid parallel to the Sulphuric Acid (H2SO4) pipeline for cleaning & purging purposes for the Sulphuric acid pipeline. The nitrogen quantity required for pigging operation is considered at the rate of ~2850 Nm3/hr for ~ 4 hours (3145 Cubic Meters/Hour), Sulphuric Acid Pipeline (Length :2.148 km, Size :16 inch, Operating Temp: 40 deg C, Operating Pressure : 6-4 kg/cm2, Pipeline ROU width of 20 m) (525 Cubic Meters/Hour)
Location Haldia, P.O-Haldia Oil Refinery
District Purba Medinipur
State West Bengal
Investment From 100 Million to 999 Million
Status Pre Project Stage
Endproduct Oil & Gas / Refinery

Want full details and key decision makers?

Get access to complete project information including address and contact details.