Latest Project Updates
New MS Fabricated Metal Products Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new MS Fabricated Metal Products manufacturing project is planned in the Industrial Area Urla, Raipur, Chhattisgarh. The project will produce 14,400 M.T. of MS Fabricated Metal Products annually. As of April 2025, necessary consent from state pollution control authorities has been obtained, allowing the company to proceed with construction and development.
New Conveyor Belt Mfg. Project in Durg, Chhattisgarh
Executive Summary: A new manufacturing project is planned in Bhilai, Durg, Chhattisgarh, involving the production of 20,000 meters of conveyor belts annually, along with pully blocks, roller rubber, synthetic rubber sheets, vulcanizing material, and iron/steel wire mesh. The project has received approval from the state pollution control authorities as of April 2025 and is set to enhance local industrial capabilities.
Hospital Expansion Project in Raipur, Chhattishgarh
Executive Summary: A hospital expansion project in Raipur, Chhattisgarh, aims to increase bed capacity from 188 to 220 beds. The project is designed to meet growing healthcare demand in the region. As of April 2025, approval has been granted by the state pollution control authorities to proceed with construction and development of the facility.
Rs.3500 Million New Cane Juice/Grain Based Distillery Project in Mungeli, Chhattisgarh
Executive Summary: A new Cane Juice/Grain-Based Distillery project is planned in Kaith Nawagaon, Mungeli, Chhattisgarh, with a production capacity of 600 KLPD of RS/ENA/Ethanol and a 12.0 MW co-generation power plant. Estimated at Rs. 3,500 million, construction is scheduled from September 2025 to October 2027. As of April 2025, the project awaits environmental clearance from the state authority.
Re-Rolled Product Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new Rolling Mill is planned in Siltara Phase II Industrial Area, Raipur, Chhattisgarh, with a capacity of 30,000 MTPA of Re-Rolled Products via Induction Furnace, costing Rs. 29 million. Construction began in April 2024, scheduled for completion by April 2025. The project awaits clearance from the State Level Environment Impact Assessment Authority as of April 2024.
Emulsion Matrix Storage Project in Surajpur, Chhattisgarh
Executive Summary: A new Emulsion Matrix Storage Project is planned in Marhata, Surajpur, Chhattisgarh, focusing on the storage of emulsion matrix for manufacturing site-mix explosives with a capacity of 24,000 MT per annum. The project has received consent from the state pollution control authorities as of April 2025, allowing the company to proceed with its development.
New Hospital Project in Raipur, Chhattisgarh
Executive Summary: A new hospital project is planned in Tikarapara, Raipur, Chhattisgarh, near Colours Mall on New Dhamtari Road. The project involves constructing a hospital with 200 beds. As of April 2025, the necessary consent from the state pollution control authorities has been received, enabling the establishment of the project to enhance healthcare infrastructure in the region.
New Material Recovery Facility in Bastar, Chhattisgarh
Executive Summary: A new Material Recovery Facility is being planned in Burandwada Semra, Tehsil Jagdalpur, Bastar, Chhattisgarh, with a processing capacity of 1,200 tonnes per year. As of April 2025, the necessary consent from the state pollution control authorities has been granted, enabling the establishment of the facility aimed at improving waste management and recycling operations.
New Harrows, Scarifiers, Cultivators, Weeders and Hoes Mfg. Project in Durg, Chhattisgarh
Executive Summary: A new manufacturing project for agricultural tools, including harrows, scarifiers, cultivators, weeders, and hoes, is planned in Kandarka, Durg, Chhattisgarh, with a production capacity of 1050 MTPA. As of April 2025, the project has received consent from the state pollution control authorities for establishment, ensuring compliance with environmental regulations.
Rs.1800 Million Hospital Expansion Project in Raipur, Chhattisgarh
Executive Summary: A new 500-bedded hospital expansion project is planned in Raipur, Chhattisgarh, including a nursing college, hostel, doctor housing, and a guest house across 61,000.19 sqm. With an estimated cost of ₹1,800 million, construction is set to begin in November 2025 and finish by December 2025. Environmental clearance is currently under review.