Latest Project Updates
New Rolling Mill Expansion Project in Bilha, Bilaspur
Executive Summary: A steel plant project in Chhattisgarh by Mangal Sponge and Steel comprises setting up a plant for steel ingots/billets (144,000 TPA) and a rolling mill for rolled and structural products (105,000 TPA), expanding an existing facility. Environmental clearance process initiated in October 2012 continues. Expansion includes induction furnace (72,000 TPA) and rolling mill (105,000 TPA), with consent from state pollution control authorities obtained as of May 2024.
New Barbed Wire of Iron Steel Mfg. Project in Durg, Chhattisgarh
Executive Summary: A new manufacturing project in Heavy Industrial Area, Bhilai, Chhattisgarh, involves producing barbed wire of iron steel at a capacity of 2000 MTPA, wire ropes galvanized iron and steel with gasifier at 14,000 MTPA, and M S wire at 7500 MTPA. As of May 2024, the project has secured consent from state pollution control authorities.
New Ferro Alloys Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new ferro alloys manufacturing project in Industrial Area Bhanpuri, Raipur, Chhattisgarh, aims to produce 364 MTPA of ferro alloys and 50 MTPA of refractory monolithies. As of May 2024, the project has obtained consent from state pollution control authorities for establishment.
Steel Structures Mfg. Expansion Project in Bhilai, Chhattisgarh
Executive Summary: A manufacturing expansion project in Light Industrial Area, Bhilai, Chhattisgarh, is planned by Classic Technomech (Unit II). It includes producing 2,000 MTPA of steel structures and 3,500 MTPA of fabricated metal products. Consent from state pollution control authorities has been secured as of May 2024.
New Cable Tray Assembling Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A cable tray assembly manufacturing project is planned in Urla Industrial Area, Raipur, Chhattisgarh, by Element Industries. It aims to produce 1,000,000 cable tray assemblies annually and 2,000 electrical panel assemblies per year. Consent for the project establishment has been obtained from state pollution control authorities as of May 2024.
Rs.3512 Million New Greenfield Steel Plant in Bilaspur, Chhattisgarh
Executive Summary: A New Greenfield Steel Plant project in Bilaspur, Chhattisgarh, includes DRI Kilns, Ferro Alloy Unit, Briquetting Plant, and power generation units. Estimated at Rs. 3512 million, construction began in July 2024, scheduled for completion by June 2029. As of April 2024, the project awaits environmental clearance from the Ministry of Environment, Forest, and Climate Change of India.
Re-Rolled Steel Products Mfg. Expansion Projects in Raipur, Chhattisgarh
Executive Summary: A steel company is expanding its operations in Guma Village, Raipur, Chhattisgarh, aiming to increase manufacturing capacity for re-rolled steel products, M.S. Billets, and slag-based bricks. With approval from state pollution authorities as of April 2024, the project is set to move forward, enhancing production levels significantly.
Rs.450 Million MS Billets/ Ingots Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A project to expand MS billets/ingots manufacturing is planned for Village Charoda, Raipur, Chhattisgarh. It involves increasing production capacity from 29,500 TPA to 3,26,500 TPA for MS billets/ingots and rerolled steel. Construction starts in November 2024, ending by December 2025, with an estimated cost of Rs.450 million. As of April 2024, the project awaits examination in the environmental clearance process by the Ministry of Environment, Forest, and Climate Change of India.
Induction Furnace Expansion Project in Raipur, Chhattisgarh
Executive Summary: A steel manufacturer intends to expand an induction furnace project in Raipur, Chhattisgarh, increasing capacity from 29,500 to 59,500 metric tonnes per annum. By April 2024, approval has been granted by state pollution control authorities for the project located in Village - Charouda, Block - Dharsiwa.
Oxygen Gas Mfg. Expansion Project in Durg, Chhattisgarh
Executive Summary: A company plans to expand oxygen gas manufacturing in Durg, Chhattisgarh, producing industrial oxygen gas (24,00,000 CMPA), medical oxygen gas (6,00,000 CMPA), nitrogen gas (5,00,000 CMPA), liquid nitrogen (20,000 liters per annum), carbon dioxide gas (1,500 MTPA), and nitrous oxide gas (300 MTPA). By April 2024, state pollution control authorities have granted consent for the project at Industrial Growth Center, Borai.