Featured Manufacturing

Rs 7000 Million Semiconductor Mfg. Facility in Sanand, Gujarat

State: Gujarat
Investment: From 5000 Million to 49999 Million
Updated: 08 May 2026

Executive Summary: A new semiconductor manufacturing facility is being planned at Sanand in Gujarat with an investment of Rs 7000 million. The project will focus on semiconductor and electronic component manufacturing for domestic and export markets. The facility is expected to strengthen the semiconductor ecosystem emerging in Gujarat and support India’s electronics manufacturing expansion plans. State government support and industrial infrastructure at Sanand are expected to facilitate project implementation.

Featured Manufacturing

Rs.107 Million FFS Injections Ampoules Mfg. Expansion Project in Solan, Himachal Pradesh

State: Himachal Pradesh
Investment: From 100 Million to 999 Million
Updated: 07 May 2026

Executive Summary: A specialized pharmaceutical manufacturer in Solan, Himachal Pradesh, is expanding its FFS Injection Ampoule capacity from 220 million to 920 million units. The Rs. 107.5 million project, approved by state authorities, leverages advanced Blow-Fill-Seal technology. As of May 2026, construction and installation work have begun to significantly boost sterile liquid manufacturing output.

Featured Manufacturing

Rs.40000 Million New Solar Cell and BESS Mfg. Project in Gujarat

State: Gujarat
Investment: From 5000 Million to 49999 Million
Updated: 06 May 2026

Executive Summary: An integrated renewable energy hub is being established in Gujarat with a ₹40,000 million investment. The project includes a 5 GW solar cell facility (implemented in two phases) and a 10 GW BESS plant. Aimed at boosting domestic manufacturing and grid stability, this ecosystem will significantly enhance India’s clean energy infrastructure and industrial growth through large-scale technological integration.

Featured Manufacturing

New Semiconductor Fabrication Unit in Gujarat

State: Gujarat
Investment: NA
Updated: 06 May 2026

Executive Summary: A major semiconductor facility is coming to Dholera, Gujarat, following Union Cabinet approval in May 2026. The integrated unit focuses on compound semiconductor fabrication and ATMP for Mini/Micro-LED modules. Utilizing GaN technology, it will produce 72,000 sq. meters of display panels annually, strengthening India’s domestic chip ecosystem and high-tech manufacturing self-reliance.

Featured Manufacturing

Rs.8493 Million New Outsourced Semiconductor Assembly and Testing (OSAT) Plant in Gujarat

State: Gujarat
Investment: From 5000 Million to 49999 Million
Updated: 06 May 2026

Executive Summary: A new Outsourced Semiconductor Assembly and Testing (OSAT) plant is being set up in Surat, Gujarat, with a daily production capacity of 300,000 chips. Estimated at Rs. 8493.95 million, the project aims to enhance semiconductor capabilities. As of December 2024, the project is in the implementation stage, focusing on advanced technology for efficient chip assembly and testing.

Featured Manufacturing

Rs.3406 Million New Fans and Motors Mfg. Unit in Chennai, Tamil Nadu

State: Tamil Nadu
Investment: From 1000 Million to 4999 Million
Updated: 06 May 2026

Executive Summary: A new manufacturing unit for fans and motors is planned in Chennai, Tamil Nadu, with an estimated investment of Rs. 3400 million. The facility is expected to begin operations by the end of 2026. The company has received consent from the state pollution control authorities as of April 2025, marking a key step in the project.

Featured Manufacturing

Floral Foam Mfg. Expansion Project in Alwar, Rajasthan

State: Rajasthan
Investment: Less than 100 Million
Updated: 30 April 2026

Executive Summary: A manufacturing unit in Khairthal–Tijara, Rajasthan, is expanding to produce 1.8 million boxes of floral foam and 70,000 boxes of plastic ribbon annually. The ₹64.297 million upgrade includes a new 2,500 TPA Phenolic Resin facility. As of April 2026, the project is seeking environmental clearance to begin its next phase of industrial production and capacity building.

Featured Manufacturing

Rs.2500 Million New Integrated Display Electronics Mfg. Facility in Amaravati, Andhra Pradesh

State: Andhra Pradesh
Investment: From 1000 Million to 4999 Million
Updated: 29 April 2026

Executive Summary: A state-of-the-art electronics manufacturing facility is being developed on a 20-acre site in the Amaravati Capital Region, Andhra Pradesh. With an investment of Rs. 2,500 million, the project will produce display controllers, video processing units, and LED modules. Having received environmental clearance, the project is moving forward to establish a robust domestic supply chain for high-end display technology.

Featured Manufacturing

Rs.10000 Million Defence Products Mfg. Project in Amravati, Maharashtra

State: Maharashtra
Investment: From 5000 Million to 49999 Million
Updated: 29 April 2026

Executive Summary: A major defence manufacturing facility is being established in Amravati, Maharashtra, with an investment of Rs. 10,000 million. Focused on the production of advanced defence equipment, the project has recently received state government approval. This significant development is set to boost local industrial growth and enhance the nation's capacity for indigenous defence production.

Featured Manufacturing

Rs.188 Million Electrical Fans Mfg. Expansion Solan, Himachal Pradesh

State: Himachal Pradesh
Investment: From 100 Million to 999 Million
Updated: 29 April 2026

Executive Summary: An industrial manufacturer is doubling its production capacity for electrical fans at a facility in Baddi, Himachal Pradesh. With an investment of Rs. 188.8 million, the expansion aims to increase output from 1.8 million to 3.6 million units annually. The project proposal received state approval in early 2026, and on-site implementation work is currently underway.