Latest Project Updates
Rs.1851 Million New Helmets Mfg. Project in Solan Himachal Pradesh
Executive Summary: A global leader in safety headgear is investing Rs. 1,851 million to establish a mega-manufacturing unit in Solan, Himachal Pradesh. The plant will produce 9 million helmets per year. With state approvals secured and construction already underway as of April 2026, the project offers significant opportunities for vendors of injection molding machinery, automated paint shops, and industrial raw materials.
Rs.530 Million New CCTV/Consumer Camera Mfg. Project in YSR, Andhra Pradesh
Executive Summary: A manufacturing facility in the YSR Electronic Manufacturing Cluster (EMC), Kopparthy, is a strategic expansion of their Security Systems vertical. Given the rapid scaling of production capacity (reaching millions of units per month across cameras and housings as of 2026), procurement is handled through both local plant-level operations and centralized corporate supply chain management.
Rs.20810 Million New Anode Material Mfg. Plant in Chittoor, Andhra Pradesh
Executive Summary: A major manufacturer is establishing a Rs. 20,810 million anode material plant in Chittoor, Andhra Pradesh. The facility will have a 20,000 TPA capacity, supporting the growing EV battery ecosystem. Currently seeking environmental clearance as of April 2026, the project is scheduled for construction from November 2026 to January 2029.
Rs.910000 Million New Semiconductor Manufacturing Facility in Ahmedabad, Gujarat
Executive Summary: A large semiconductor fabrication plant is being set up with advanced chip manufacturing capabilities as part of India’s semiconductor push. The project involves an investment of Rs 910000 million and is located in a newly notified SEZ at Dholera. It will produce high-end semiconductor chips for domestic and global markets, with strong government support and incentives, and is expected to be commissioned in phases over the coming years.
Rs.10320 Million Integrated Medium Density Fiber Board Mfg. Facility in Tirupati, Andhra Pradesh
Executive Summary: A new integrated Medium Density Fiberboard (MDF) plant is being developed on a 50-acre site in Naidupeta, Andhra Pradesh. The ₹10,320 million facility, which recently secured state land allotment, will be constructed between July 2026 and July 2029. The phased project aims to establish a large-scale manufacturing hub for high-grade wood-composite products in South India.
Rs.20000 Million New All type of Power Transformer Mfg. Unit in Vadodara, Gujarat
Executive Summary: A major energy infrastructure firm is launching a ₹1,687.78 crore greenfield power transformer manufacturing facility in Vadodara, Gujarat. Spanning over 66,000 sq. meters, the project aims to produce a full range of high-voltage transformers. Construction is scheduled from October 2026 to September 2028, with environmental clearances currently underway as of April 2026. This represents a significant industrial opportunity.
Rs.600 Million New Printed Paper Roll Mfg. Unit in Ahmadabad, Gujarat
Executive Summary: A specialized packaging firm is establishing a ₹60 crore manufacturing facility in Bavla, Gujarat. The plant will produce an annual 48,600 tonnes of printed and unprinted paper and polymer rolls. Scheduled for a fast-track two-month construction phase starting June 2026, the project is currently seeking environmental clearance. It presents urgent opportunities for industrial construction and high-speed printing machinery suppliers.
Rs.10020 Million Solar Cell and Module Mfg. Facility in Aurangabad, Maharashtra
Executive Summary: A next-generation energy platform is establishing a 1.2 GW solar manufacturing facility in Aurangabad, Maharashtra, with a ₹10,020 million investment. Spanning 63 acres, the project focuses on high-efficiency cells and modules. Construction begins in August 2026, aiming for a February 2029 completion to bolster India’s clean energy supply chain and regional industrial growth.
Rs.53750 Million Bank Note Paper Mill Expansion Project in Mysuru, Karnataka
Executive Summary: A ₹5,375 crore expansion project in Mysuru is set to increase high-security paper production from 16,000 to 28,000 TPA. Aimed at boosting self-reliance, the initiative is currently awaiting environmental clearance as of April 2026. Construction is scheduled for a fast-track window in early 2027, incorporating advanced, chlorine-free manufacturing technologies within an existing high-security industrial campus.
Rs.10239 Million New OSAT Facility in Sri Sathya Sai district, Andhra Pradesh
Executive Summary: The project involves establishment of a large-scale outsourced semiconductor assembly and test (OSAT) facility aimed at strengthening semiconductor packaging capabilities in India. The facility is planned with an investment of Rs 10239.78 million in Sri Sathya Sai district and is expected to generate significant employment. The proposal has received approval from the state investment promotion board, enabling further project development and execution. It is part of the broader push to localize semiconductor manufacturing and packaging infrastructure in the country.