Latest Project Updates
Rs.15000 Million New Greenfield Rail Manufacturing Facility in Madhya Pradesh
Executive Summary: A public sector manufacturer plans a greenfield rail manufacturing facility in Madhya Pradesh with an investment of about Rs 15,000 million. The phased project will produce rail coaches and rolling stock for domestic and export markets, using modern technologies. Subject to approvals, the facility will expand capacity, support major rail and metro projects, and strengthen indigenous manufacturing capabilities and supply chains.
Rs.313 Million New Tamper Evident Seals Mfg. Project in Howrah, West Bengal
Executive Summary: A new manufacturing project for tamper-evident seals and holographic packaging products is proposed at Surikhali, Panchla, Howrah, West Bengal. The facility will produce a wide range of labels, foils, films, and holographic products with multiple monthly capacities. The project entails an investment of Rs. 313.25 million. As of January 2026, consent to establish has been obtained from the state pollution control authorities.
Rs.5250 Million New Precision Micro-Fasteners Plant in Tamil Nadu
Executive Summary: An international fasteners group, through its Indian arm, plans to establish a precision micro-fasteners manufacturing facility in the Oragadam industrial area, Tamil Nadu. The ₹525 crore project will serve domestic and export markets, including Europe and the US, strengthen local supply chains, and reduce imports. The facility is expected to generate around 2,000 jobs, with land acquisition and planning underway.
Rs.7370 Million New Advanced Medical Devices Facility in Gautam Buddh Nagar, Uttar Pradesh
Executive Summary: A new advanced medical devices manufacturing facility is proposed at the Medical Devices Park, Sector 28, YEIDA, Gautam Buddh Nagar, Uttar Pradesh. The project aims to establish modern production infrastructure with an estimated investment of ₹7,370 million. Groundbreaking is expected by mid-2026. As of February 2026, the project has received a Letter of Intent and is progressing toward execution.
New Hydraulic Hose Assembly Mfg. Project in Sahibzada Ajit Singh Nagar, Punjab
Executive Summary: A new hydraulic hose and tube assembly manufacturing unit is proposed at Village Kuranwala, Dera Bassi, Sahibzada Ajit Singh Nagar, Punjab. The project plans production capacities of 10,000 units per day for both hydraulic hoses and tube assemblies, with an estimated investment of ₹78.28 million. As of February 2026, the project has received state pollution control consent for establishment.
Rs.14810 Million Power Cable-Medium Voltage and Aluminium Conductor Plant in Gujarat
Executive Summary: An electrical manufacturing company plans to set up a power cable and aluminium conductor facility in Valsad, Gujarat. The project includes medium- and low-voltage power cables with a combined capacity of 1,800 km per month and an aluminium conductor plant of 144,000 TPA. The ₹14,810.9 million project runs from April 2025 to July 2026 and is under environmental clearance review.
Rs.244 Million Polyurethane Foams Products Mfg. Expansion Project in Khortha, Odisha
Executive Summary: A polyurethane foam manufacturing project is planned in Jayamangal Industrial Area, Khortha, Odisha. Initial capacity was 4,500 MTPA, later enhanced to 7,000 MTPA with Rs. 244 million investment. As of January 2026, further expansion will raise polyurethane foam capacity to 15,000 MTPA and rebonded foams to 2,500 MTPA, with an additional Rs. 93.1 million investment and regulatory consent obtained.
Rs.550 Million Engineering Goods Mfg. Expansion Project in Sri Sathya Sai, Andhra Pradesh
Executive Summary: A steel casting company in Andhra Pradesh is expanding its manufacturing plant for engineering goods and industrial valves. Current production is 650 tonnes of engineering goods and ~380 valves per month, with plans to scale engineering goods to 2,000 TPM. The Rs. 1,200 million expansion, covering casting, melting, forging, fettling, and machining, has state pollution control approval as of January 2026.
Rs.395 Million Adhesive Tape Mfg. Expansion Project in Kutch, Gujarat
Executive Summary: A manufacturing company plans to expand its adhesive tape production in Kutch, Gujarat, increasing capacity from 30,000 MT/year to 36,000 MT/year. The project, estimated at Rs.395 million, is scheduled for construction from April 2026 to June 2026 and has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance as of January 2026.
Rs.80000 Million New Integrated Solar Mfg. Plant in Madhya Pradesh
Executive Summary: A company plans to establish a 6 GW integrated solar manufacturing plant on a 110-acre site in Ujjain, Madhya Pradesh, producing both solar modules and cells. With an estimated investment of Rs.80,000 million, initial production is expected by May 2026. Construction runs from February 2026 to March 2028, and the project has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance.