Rs.700 Million Recycle Bottle Grade Chips Mfg. Expansion Project in Warangal Rural, Telangana
Executive Summary: A recycling project in Warangal Rural, Telangana, aims to expand production capacity of bottle-grade chips from 120 to 200 tons per day. Located in Kakatiya Mega Textile Park, the initiative is estimated to cost Rs. 700 million. As of June 2025, necessary environmental clearance has been granted by state pollution control authorities, enabling the project to proceed.
New HDPE Valves and Fitting Mfg. Project in Rangareddy, Telangana
Executive Summary: A new HDPE valves and fittings manufacturing project is planned in IDA Mankhal, Rangareddy, Telangana, with a proposed capacity of 30,000 units per month. The project involves an investment of ₹86.4 million. As of June 2025, necessary approvals have been obtained from the state pollution control authorities, paving the way for establishment of the facility.
Rs.118 Million New Injection Moulded Plastic Components Mfg. Project in Pune, Maharashtra
Executive Summary: A new plastic components manufacturing project is planned in Khed, Pune, Maharashtra, focusing on injection-moulded and blow-moulded components with monthly capacities of 800,000 and 250,000 units, respectively. The project, estimated to cost Rs. 85 million, has received environmental clearance. Initially approved in November 2022, it aims to enhance plastic production capabilities to meet growing industrial demand.
Rs.300 Million Plastic Products Mfg. Expansion Project in Jalgaon, Maharashtra
Executive Summary: A plastic products manufacturing expansion project is planned in the MIDC Area, Jalgaon, Maharashtra. The project will boost production capacities to 32.4 million plastic lotion pumps and 43.2 million plastic trigger sprayers annually. With an estimated cost of Rs. 300 million, the project received consent from state pollution control authorities as of June 2025.
New PET Sheet Mfg. Project in Howrah, West Bengal
Executive Summary: A new PET sheet and blister packaging manufacturing project is planned in Mouza Serpur, Block Amta, Panpur, Howrah, West Bengal. The facility will produce 16 TPD of PET sheets and 8 TPD of blister packaging, with an estimated investment of Rs. 91.842 million. As of June 2025, the project has received consent from state pollution control authorities.
New Bullet Proof Vest Mfg. Project in Durg, Chhattisgarh
Executive Summary: new defense manufacturing project is planned in Birebhat, Dhamdha, Durg, Chhattisgarh, covering 0.98 hectares. The facility will produce 35,000 bulletproof vests and 35,000 ballistic helmets annually. As of June 2025, the project has received establishment consent from the state pollution control authorities.
Rs.13000 Million New Aluminium Beverage Cans Mfg. Project in Unnao, Uttar Pradesh
Executive Summary: A new aluminium beverage can manufacturing project is planned in Sarai Katian, Unnao, Uttar Pradesh, featuring an industrial shed with a built-up area of 1,20,657.48 sq.m. The project, estimated at ₹13,000 million, is set to begin construction in August 2025 and conclude by August 2028. As of June 2025, it is awaiting environmental clearance from the state authority.
Rs.600 Million New Polycarbonate / PMMA Solid Sheet Mfg. Project in Solan, Himachal Pradesh
Executive Summary: A new manufacturing project has commenced in Industrial Area Lodhimajra, Baddi, Solan, Himachal Pradesh, involving the production of Polycarbonate/PMMA Solid Sheets (800 TPA) and ASA Film (600 TPA). With an estimated investment of ₹600 million, the project received approval from the State High Level Clearance Committee in May 2025 and began implementation in June 2025.
Rs.600 Million New Laminate Sheet Mfg. Plant in Gujarat
Executive Summary: A major interior products manufacturer is setting up a new laminate sheet plant in Gujarat with a capacity of 1.2 million sheets annually, raising total capacity to 34.92 lakh sheets. With an investment of Rs 600 million, the facility will be among the largest globally. Phase 2, including a Jumbo Laminate unit, is expected by Q3 FY26.
Rs.2554 Million New Pipes and Fittings Factory in Erode, Tamil Nadu
Executive Summary: A new pipes and fittings manufacturing facility is planned in Ingur, Perundurai, Erode, Tamil Nadu, covering 63,802.8 sq.m. with an estimated investment of ₹2,554.9 million. Construction is scheduled to begin in August 2025 and conclude by December 2025. As of June 2025, the project has been submitted for environmental clearance to the State Level Environment Impact Assessment Authority.