Rs.124 Million New Corrugated Boxes Mfg. Project in Solan, Himachal Pradesh
Executive Summary: A new corrugated box manufacturing project with a capacity of 16.2 million units annually is underway in Manjholi, Nalagarh, Solan, Himachal Pradesh. With an estimated investment of ₹124.36 million, the initiative received approval from the State High Level Clearance Committee in May 2025. Construction and development work began in June 2025.
Rs.275 Million New Dies and Moulds Mfg. Project in Medchal-Malkajgiri, Telangana
Executive Summary: A new dies and moulds manufacturing project is planned in IALA, Balanagar, Medchal-Malkajgiri, Telangana, with an estimated investment of ₹275.607 million. The project aims to enhance tooling production capacity. As of June 2025, necessary environmental clearances have been obtained from the state pollution control authorities, allowing the establishment of the manufacturing unit to move forward.
Rs.602 Million New Paper Board Products Mfg. Project in Rangareddy, Telangana
Executive Summary: A new project is set to establish a paper box manufacturing and printing unit in E-City, Raviryala, Maheshwaram, Rangareddy, Telangana, with a daily capacity of 800,000 units. Estimated at ₹602.3 million, the initiative has received consent from state pollution control authorities as of June 2025, paving the way for its implementation.
Rs.676 Million New OPVC Pipes and Fitting Mfg. Project in Paschim Bardhaman, West Bengal
Executive Summary: A new OPVC pipes and fittings manufacturing unit with a capacity of 1,000 metric tonnes per month is planned in Bamunara Industrial Area, Paschim Bardhaman, West Bengal. The project, estimated at Rs. 676.49 million, has received environmental clearance from state pollution control authorities as of June 2025, allowing it to move forward.
Rs.10407 Million Photo Voltaic Solar Cell Fab Activity Expansion Project in Rangareddy, Telangana
Executive Summary: A major expansion project at Fab City, Telangana, aims to boost renewable energy production by increasing photovoltaic solar cell fabrication capacity to 500 MW per annum and module assembly to 2400 MW per annum. With an investment of ₹2995 million, the project has already received Consent to Establish from the Telangana Pollution Control Board.
Rs.152 Million Rotors Machining Expansion Project in Medak, Telangana
Executive Summary: A Company is planning to take up a rotors machining expansion project in Telangana. The project involves expanding the manufacturing capacity from from 12 Nos/Annum to 50 Nos/Annum
Industrial Fans Mfg. Expansion Project in Sangareddy, Telangana
Executive Summary: A new industrial fans manufacturing project in Telangana, with a capacity of 2000 units per annum, at an estimated cost of Rs. 367.6 million, has received consent from state pollution control authorities for establishment as of October 2020.
Rs.808 Million PET Preforms, PET Bottles Mfg. Expansion Project in Hooghly, West Bengal
Executive Summary: A PET preforms and bottles manufacturing unit in Mouza-Somsara, Hooghly, West Bengal, is set for expansion, aiming to increase capacity to 58.70 MT/day. The project, with an estimated cost of ₹808.751 million, has received consent to establish from state pollution control authorities as of June 2025, paving the way for enhanced production capabilities in the packaging sector.
Rs.240 Million Corrugated Boards and Boxes Mfg. Expansion Project in Howrah, West Bengal
Executive Summary: A corrugated boards and boxes manufacturing unit in Howrah, West Bengal, is set for expansion with a planned capacity of 500 MT/month. The project, estimated to cost ₹240 million, aims to meet growing demand in the packaging sector. As of June 2025, it has received consent to establish from the state pollution control authorities.
Rs.80000 Million New Helicopter Mfg. Plant in Nagpur, Maharashtra
Executive Summary: A new state-of-the-art helicopter manufacturing plant is planned in Nagpur, Maharashtra, with an estimated investment of ₹80,000 million. Construction is scheduled to begin in 2026. As of June 2025, a Memorandum of Understanding (MoU) has been signed with the Maharashtra government to facilitate the establishment and development of the project.