Latest Project Updates
New Helicopter Final Assembly Line in Kolar, Karnataka
Executive Summary: A new helicopter final assembly line is planned in Kolar, Karnataka, for assembling the Airbus H125 model. The company has acquired 740,000 sq. ft. of industrial land in the Vemagal Industrial Area near Bengaluru to build a fully integrated facility. As of May 2025, pre-project activities, including planning and site preparation, are ongoing.
New Corrugated Boxes Mfg. Project in Palghar, Maharashtra
Executive Summary: A new corrugated box manufacturing project is planned in Sajjan Pada, Chahade, Palghar, Maharashtra, with a proposed production capacity of 1,000 tonnes per month. The project entails an estimated investment of ₹25.5 million. As of May 2025, the company has received consent from the state pollution control authorities, allowing it to proceed with establishing the facility.
New Paper Products Mfg. Project in Howrah, West Bengal
Executive Summary: A new paper products manufacturing project is planned in Ganesh Complex, Raghudevpur, Rajapur, Howrah, West Bengal. It will produce PLA straws (40 MT/month), paper straws (60 MT/month), and plastic straws (20 MT/month). With an estimated investment of ₹48.508 million, the project has received environmental clearance from state pollution authorities as of May 2025, enabling its establishment.
New Injection Moulded Components Mfg. Project in Navi Mumbai, Maharashtra
Executive Summary: A new manufacturing project for injection moulded components with a capacity of 10 tons per month is planned in Navi Mumbai, Maharashtra. The project’s estimated investment is Rs.48.925 million. As of May 2025, consent from state pollution control authorities has been secured, allowing the project to proceed with establishment and development.
New Automated Car Parking Systems Mfg. Project in Howrah, West Bengal
Executive Summary: A new manufacturing project for automated car parking systems is planned in Mouza-Kulepairi, Deulgram, Howrah, West Bengal. With a production capacity of 200 metric tonnes per month, the project is estimated to cost Rs.87.8 million. As of May 2025, necessary environmental clearance has been obtained from the state pollution control authorities, paving the way for project establishment.
New Distribution Transformers Mfg. Project in Pune, Maharashtra
Executive Summary: A new manufacturing project for distribution transformers is set to begin in Shinde, Chakan Industrial Area, Phase-2, MIDC, Khed, Pune, Maharashtra. The facility will produce 100 distribution transformers per month, with an estimated investment of Rs. 47 million. As of May 2025, state pollution control authorities have granted consent to establish the project.
New Optical Lenses Mfg. Project in Navi Mumbai, Maharashtra
Executive Summary: A new optical lenses manufacturing project is planned in TTC Industrial Area, MIDC Mahape, Navi Mumbai, Maharashtra, with an annual capacity of 2.5 lakh pieces. The project, estimated to cost Rs. 87.943 million, has received consent from the state pollution control authorities as of May 2025. It aims to boost lens production to meet increasing market demand.
Rs.155 Million New High Carbon Steel Wire Rod Mfg. Project in Howrah, West Bengal
Executive Summary: A new manufacturing project is set to be established in Sankrail Industrial Park, Howrah, West Bengal, focusing on producing 1,790 MT/month of high carbon steel wire rods and 1,980 MT/month of aluminium rods and conductors. With an estimated investment of ₹155.249 million, the project has received environmental clearance from state pollution authorities as of May 2025.
Rs.27000 Million New Solar PV Cell and Solar Module Mfg. Facility in Anakapalli, Andhra Pradesh
Executive Summary: A new solar manufacturing facility is planned in the Industrial Park, Anakapalli, Andhra Pradesh, with a capacity of 4.8 GW for PV cells and 1.5 GW for solar modules. The project, costing Rs. 27,000 million, aims to boost renewable energy production. Land allotment has been approved by the state government as of May 2025.
Medical Device Mfg. Unit in Chennai, Tamil Nadu
Executive Summary: A new medical device manufacturing unit is planned in Ambattur, Chennai, Tamil Nadu, with a monthly capacity of 750 pieces. The project, estimated at Rs. 35 million, is scheduled for construction between June and August 2025. As of May 2025, it has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance.